1、100:00:03,429 -> 00:00:06,720I on April 23rd 2004200:00:06,720 -> 00:00:10,030an explosion at the Formosa Plastics corporation facility300:00:10,030 -> 00:00:13,330rocked the small town avaliable us in central Illinois400:00:13,330 -> 00:00:18,250five workers died including a husband and
2、 wife500:00:18,250 -> 00:00:21,330three others were severely injured600:00:21,330 -> 00:00:26,080authorities evacuated approximately 150 residents from the area700:00:26,080 -> 00:00:29,130the incident had serious economic consequences for the surrounding800:00:29,130 -> 00:00:29,740comm
3、unity900:00:29,740 -> 00:00:33,410as the plant did not reopen1000:00:33,410 -> 00:00:37,540the facility which employed 139 workers produced PVC1100:00:37,540 -> 00:00:42,320a common plastic PVC is used to make many different products including credit1200:00:42,320 -> 00:00:42,850cards130
4、0:00:42,850 -> 00:00:46,910clothing pipe siding and flooring1400:00:46,910 -> 00:00:50,070Borden chemical constructed the plant in 19651500:00:50,070 -> 00:00:54,510and Formosa purchased it in 2002 two years before the accident1600:00:54,510 -> 00:00:58,280the CSB investigated the incide
5、nt and issued a report1700:00:58,280 -> 00:01:03,800with findings and recommendations this explosion occurred after a worker opened1800:01:03,800 -> 00:01:08,140a valve on a pressurized reactor full of flammable material1900:01:08,140 -> 00:01:12,620might be tempting this simply blamed the
6、tragedy and human air2000:01:12,620 -> 00:01:17,480however as is often the case the root causes were much deeper2100:01:17,480 -> 00:01:21,850the CSB investigation revealed that better operating practices2200:01:21,850 -> 00:01:25,530and equipment design could have reduced the chances a few
7、 min air that had such2300:01:25,530 -> 00:01:27,420catastrophic consequences2400:01:27,420 -> 00:01:31,100the CSB used physical evidence documents2500:01:31,100 -> 00:01:35,200and the testimony of the few surviving witnesses to reconstruct the accident2600:01:35,200 -> 00:01:42,180the f
8、ollowing computer simulation shows how events likely unfolded2700:01:42,180 -> 00:01:45,780the formosa plant made polyvinyl chloride or PVC2800:01:45,780 -> 00:01:49,930in 24 large vessels called reactors that were ranged2900:01:49,930 -> 00:01:53,340in Group A four inside each vessel3000:0
9、1:53,340 -> 00:01:56,880thousands of pounds of highly flammable toxic3100:01:56,880 -> 00:02:00,369vinyl chloride reacted under heat and pressure3200:02:00,370 -> 00:02:05,760to form PVC an operator controlled the process from a panel3300:02:05,760 -> 00:02:09,530on the upper level when
10、the process was finished3400:02:09,530 -> 00:02:12,760a second operator would walk down the stairs3500:02:12,760 -> 00:02:17,170in open valves on the reactor piping to transfer the product out3600:02:17,170 -> 00:02:21,660after completing the transfer a worker back on the top level3700:02:2
11、1,660 -> 00:02:25,190with then clean out the insider the reactor with a high pressure water3800:02:25,190 -> 00:02:26,000blaster3900:02:26,000 -> 00:02:29,160the worker would then go to the lower level4000:02:29,160 -> 00:02:32,700in open the reactor bottom valve as well as the drain val
12、ve4100:02:32,700 -> 00:02:36,400water indeed onto the floor into a drain4200:02:36,400 -> 00:02:42,230on the evening and the accident and operator started cleaning reactor 3064300:02:42,230 -> 00:02:46,350with the water blaster he then walked downstairs to drain the water4400:02:46,350 ->
13、; 00:02:50,959out love the reactor that he had been cleaning but he made a critical mistake4500:02:50,959 -> 00:02:54,300the CSP concluded that instead of turning left4600:02:54,300 -> 00:02:57,340at the bottom the stairs to get a reactor 3064700:02:57,340 -> 00:03:01,060the operator turn r
14、ight to a different group for reactors4800:03:01,060 -> 00:03:07,209in approached reactor 310 but reactor 310 was not in the cleaning process4900:03:07,209 -> 00:03:11,959it was pressurized in heated in mid cycle making PVC5000:03:11,959 -> 00:03:15,739the operator turn switches to open the
15、 reactor bottom valve5100:03:15,739 -> 00:03:19,530in the drain valve5200:03:19,530 -> 00:03:23,520the drain valve opened but the reactor bottomed out remained shut5300:03:23,520 -> 00:03:27,330an interlock block the air supply the valves actuator5400:03:27,330 -> 00:03:31,560it was desi
16、gned to do this as a safety measure when the reactor was under5500:03:31,560 -> 00:03:32,170pressure5600:03:32,170 -> 00:03:36,690to prevent an accidental release but instead of checking to see why this5700:03:36,690 -> 00:03:37,890valve would not open5800:03:37,890 -> 00:03:42,920the op
17、erator decided to bypass the interlock he disconnected the existing5900:03:42,920 -> 00:03:44,600valve air supply hearst6000:03:44,600 -> 00:03:48,560in reach for one with the continuous air supply met for use6100:03:48,560 -> 00:03:54,110only in emergencies he connected this hose to the va
18、lve it opened6200:03:54,110 -> 00:03:59,230suddenly the highly flammable vinyl chloride mixture began rushing out onto6300:03:59,230 -> 00:03:59,910the floor6400:03:59,910 -> 00:04:03,410producing a loud rumbling noise that sounded to witnesses6500:04:03,410 -> 00:04:07,579like a jet eng
19、ine workers smelled vinyl chloride6600:04:07,580 -> 00:04:13,510in the vapors triggered an alarm the shift supervisor rushed toward the6700:04:13,510 -> 00:04:14,410reactors6800:04:14,410 -> 00:04:19,639very sorry actor 310 Springbok law right onto the floor6900:04:19,639 -> 00:04:23,090
20、where there is already a funny mixture a foot-and-a-half deep7000:04:23,090 -> 00:04:26,500believing he could stop the release7100:04:26,500 -> 00:04:30,979the supervisor race to the upper level and told operators to open blouse7200:04:30,979 -> 00:04:35,560which would relieve pressure in t
21、he reactor the supervisor and one operator7300:04:35,560 -> 00:04:37,789then tried to get to the lower level 3 and7400:04:37,789 -> 00:04:41,789interior stairwell but were stopped by the overwhelming odor in the final7500:04:41,789 -> 00:04:42,719chloride vapor7600:04:42,720 -> 00:04:47,
22、789the operator remain on the upper level the supervisor headed down to the lower7700:04:47,789 -> 00:04:48,560level on7800:04:48,560 -> 00:04:51,150exterior stairwell7900:04:51,150 -> 00:04:54,720just then the vinyl chloride ignited and exploded violently8000:04:54,720 -> 00:05:01,720wi
23、tnesses reported three or four additional explosions8100:05:02,210 -> 00:05:06,299for workers were killed immediately the two operators who had been working at8200:05:06,300 -> 00:05:07,530the top of the reactor8300:05:07,530 -> 00:05:11,620into operators who had been on the lower level inc
24、luding one who apparently8400:05:11,620 -> 00:05:13,680opened the reactor bottomed out of8500:05:13,680 -> 00:05:16,720a fifth operator who was seriously burned8600:05:16,720 -> 00:05:20,000died two weeks later two other workers8700:05:20,000 -> 00:05:23,230in the supervisor who had been
25、 in the exterior stairwell8800:05:23,230 -> 00:05:26,479were seriously injured8900:05:26,479 -> 00:05:30,550the force of the explosions destroyed much of the plant including laboratory9000:05:30,550 -> 00:05:35,130in the safety and engineering offices it blew off the reactor building roof91
26、00:05:35,130 -> 00:05:38,880knock down walls damaged metal frames and piping9200:05:38,880 -> 00:05:42,750in lifted the reinforced concrete floors on the upper levels at the plant9300:05:42,750 -> 00:05:48,389the CSB investigation found that systems and procedures put in place by both9400:0
27、5:48,389 -> 00:05:49,490Borden chemical9500:05:49,490 -> 00:05:53,650enfermo sir were insufficient to minimize the potential for human error9600:05:53,650 -> 00:05:57,930from OC did not adequately train in drill its employees9700:05:57,930 -> 00:06:02,300to immediately evacuate in the ca
28、se of a major release of hazardous chemicals9800:06:02,300 -> 00:06:05,729such an evacuation would have saved lives9900:06:05,729 -> 00:06:08,940one way to minimize human error10000:06:08,940 -> 00:06:12,680the CS be found would have been to install additional locks10100:06:12,680 -> 00:
29、06:15,990or other devices to prevent critical valves from being opened10200:06:15,990 -> 00:06:19,400when the reactor was under pressure overriding the10300:06:19,400 -> 00:06:24,080only safety interlock was all too easy to do by simply attaching the emergency10400:06:24,080 -> 00:06:24,690
30、air hose10500:06:24,690 -> 00:06:27,180that hung nearby10600:06:27,180 -> 00:06:30,389although the reactors were clearly numbered they were grouped into similar10700:06:30,389 -> 00:06:31,509sets before10800:06:31,509 -> 00:06:36,430increasing the chance that an operator might go to the
31、wrong reactor10900:06:36,430 -> 00:06:39,169there were no gauges indicators were warning lights11000:06:39,169 -> 00:06:42,870to inform operators on the lower level the reactor was processing vinyl11100:06:42,870 -> 00:06:44,319chloride11200:06:44,319 -> 00:06:47,930and those operators d
32、id not carry radios were have an intercom11300:06:47,930 -> 00:06:51,710so they were unable to quickly check on the reactor status with operators at11400:06:51,710 -> 00:06:52,500controls11500:06:52,500 -> 00:06:54,589upstairs11600:06:54,589 -> 00:06:59,889in 1992 Borden chemical the pre
33、vious owner avaliable as planned conducted a11700:06:59,889 -> 00:07:01,529process hazard analysis11800:07:01,529 -> 00:07:05,379which stated that the interlock on the reactor bottom valve was susceptible11900:07:05,379 -> 00:07:08,679to misuse additional safeguards were recommended12000:07
34、:08,679 -> 00:07:11,440but never adopted12100:07:11,440 -> 00:07:16,719another hazard analysis in 1999 again identified severe consequences12200:07:16,720 -> 00:07:19,750if someone opened the bottom valve on an operating reactor12300:07:19,750 -> 00:07:24,729but the analysis incorrectly
35、concluded that the existing safety interlock12400:07:24,729 -> 00:07:29,050was sufficient to prevent a serious incident companies need to thoroughly12500:07:29,050 -> 00:07:31,190investigate near-miss incidents12600:07:31,190 -> 00:07:34,900uncover any underlying trends are safety weaknesse
36、s12700:07:34,900 -> 00:07:39,090for most experienced several previous reactor incidents12800:07:39,090 -> 00:07:43,000that taken together could have pointed to the potential for catastrophic12900:07:43,000 -> 00:07:46,740consequences from human errors13000:07:46,740 -> 00:07:52,230in 200
37、3 an operator it for most his baton rouge louisiana PBC plant13100:07:52,230 -> 00:07:55,780open the bottom valve on the wrong reactor releasing13200:07:55,780 -> 00:08:01,490eight thousand pounds %uh vinyl chloride to the atmosphere in February 200413300:08:01,490 -> 00:08:06,210an operato
38、r at Heliopolis plant bypassed a reactor bottom valve in Iraq13400:08:06,210 -> 00:08:10,230resulting in another significant happen spirit release a final chloride13500:08:10,230 -> 00:08:14,320for motor then recognize that additional controls were needed13600:08:14,320 -> 00:08:19,219but d
39、id not quickly enough to implement improvements13700:08:19,220 -> 00:08:23,169the explosion occurred two months later13800:08:23,169 -> 00:08:25,909when a large chemical release like this occurs13900:08:25,910 -> 00:08:29,870employees need to get out of harm's way as quickly as possible
40、14000:08:29,870 -> 00:08:33,570companies need to train and roll their employees to evacuate14100:08:33,570 -> 00:08:39,909instinctively in this case to operators remained on the upper level14200:08:39,909 -> 00:08:44,910trying in vain to slow the release they and others who remained in the
41、area14300:08:44,910 -> 00:08:49,150died in the explosion their lives would have been saved had evacuated14400:08:49,150 -> 00:08:50,400immediately14500:08:50,400 -> 00:08:55,480the CSB identified many ways that the companies involved14600:08:55,480 -> 00:09:01,310could have avoided this
42、tragedy to prevent future accidents the CSB made14700:09:01,310 -> 00:09:03,560several safety recommendations14800:09:03,560 -> 00:09:07,370to the company the EPA the leading14900:09:07,370 -> 00:09:12,270industry Association and others the CSP15000:09:12,270 -> 00:09:17,480recommended da
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026四川宜宾兴文县兴投发展有限责任公司招聘2人备考题库及答案详解(有一套)
- 2026浙江杭州市文三教育集团定山小学招聘语文老师(非事业)1人备考题库及答案详解一套
- 无人机行业应用(航测)电子教案 1.14 测绘的坐标系
- 2026浙江温州市瓯海区交通运输局招聘2人备考题库附答案详解(a卷)
- 2026首都医科大学附属北京妇产医院招聘(第二批)9人备考题库附答案详解(预热题)
- 2026重庆工商职业学院公开招聘非编4人备考题库及答案详解(夺冠系列)
- 2026中共曲靖市麒麟区委组织部招聘公益性岗位工作人员3人备考题库含答案详解ab卷
- 2026广西南宁市良庆区财政局招聘工作人员1人备考题库含答案详解(完整版)
- 2026安徽芜湖市人才发展集团代招聘7人备考题库(三)附答案详解(模拟题)
- 2026陕西投资集团高校毕业生春季校园招聘备考题库含答案详解
- PLC在航空航天与飞行安全中的应用与智能化控制
- 护理查房制度课件高清
- 软件生存周期过程控制程序
- 工业互联网网络建设技术规范
- 杯中百年:133款经典鸡尾酒和背后的故事
- 绘本在小学英语口语教学中的实证研究
- 医奇V钾薄膜衣片袁老师课件
- 社会工作综合能力(初级)课件
- 广东开放大学学位外语(本23春)形成性考核2试题及答案
- 试论沈从文《边城》中的宿命思想
- 人教版七年级下册数学平行线证明题专题训练(含答案)
评论
0/150
提交评论