1、EPC1This policy is defined to standardize management of EPC tender, define each departments andresponsibilities,coordinationandcollaborationinEPC2EPC1This policy is defined to standardize management of EPC tender, define each departments andresponsibilities,coordinationandcollaborationinEPC2This pol
2、icy is d to the Project & Engineering Department businessSky Solar Holding and 3Definitions/EPCTender:thisisstageforthesofselectingEPCcontractorand4BusinessProcedure/Theprocedureisasfollowing流程名PolicyEPC文Doc 版生效日Effective流程责Policy流程批ApprovedreparationThe Beginning of EPC s starts with the reparation
3、The Beginning of EPC s starts with the corporate project execution team review Project Executive Plan and define the scope of work and scope of supply by Contractors rs. Project manage team goes by the latest regional qualified Contractors listsainedbytheregionalandcorporateProcurementProject manage
4、ment Tender ion Package for EPC Bidders and Material Equipment Requisition to the Corporate Procurement with the support of regional project team by producing the technical package including drawing, equipment The Project Team provides the standard technical specifications of the EPC project, standa
5、rd acceptance test procedures and the standard l requirements. The Regional Team is responsible for providing the local specific requirement for finalization the specification as essential part of the Tender Package, ultimay the technical section of EPC Contract and the ProjectAcceptance Procedures
6、as part of the contractual requirements. TheCorporate Team is responsible for providing the local specific requirement for finalization the specification as essential part of the Tender Package, ultimay the technical section of EPC Contract and the ProjectAcceptance Procedures as part of the contrac
7、tual requirements. TheCorporate Project Management is responsible for consolidating and ing the ion altothe EPCThe Corporate Procurement es Request for ion to major rs based theMaterialorEquipmentRequisitionandthetechnical /The Corporate Project Management is responsible for collecting EPC als. The
8、ProcurementisresponsibleforcollectingionsfromThe Corporate project team is responsible for communicating with bidders or coordinating regionalteamon clarifications forbidders andrs.TheCorporateTeamleadsbid evaluation and negotiation and coordinates with the regional team who conduct evaluation of th
9、e bids and provides inputs from the local project team selects the bidder to be the Contractor coordinateswiththeProcurementinselectingThe finalize the contract negotiation The Corporate project team coordinates with the regional project team to perform evaluationoftheionforthemain equipments. TheCorporateProcurement isresponsibleevaluating the l section of the ion and negotiation the equipment SigningtheContract/Theprojectc
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025-2026学年87加几说课稿
- 2026年重庆市北师大版高中化学高一年级上册第4章元素周期律习题
- 2025-2026学年三只小猪音乐说课稿
- 2025-2026学年二年级《湖》的说课稿
- 2025-2026学年大班说课稿下棋
- 2026年辽宁省北票市高二生物下册期末考试模拟检测卷附参考答案(能力提升)
- 2025年黑龙江省安达市高考历史模拟卷附答案【夺分金卷】
- 2025-2026学年八年级英语面试说课稿
- 2025-2026学年大班健康关节说课稿
- 2025-2026学年大班包书皮说课稿
- 2026年新闻记者职业资格证考试全真模拟试卷及答案
- 造船厂安全制度
- 26秋教科版三年级上册科学全册必背知识点新教材含答案
- 2026-2027学年高二语文上册第一次月考试卷原卷解析
- 成年人幽门螺杆菌感染诊断、治疗与预防临床实践指南(2026版)
- 4.RBT 089-2022绿色供应链管理手册
- LNG加气站人员培训方案
- 2026年中小学诗词竞赛诗词大会竞赛题库(含答案)
- 2026-2030中国矿山生态修复行业前景规划及投资潜力分析报告
- 《人工智能伦理》教学课件-2025-2026学年浙教版(新教材)初中信息技术九年级全册
- 《中药学·固精缩尿止带药》研究型教学设计(本科中医学专业三年级)
评论
0/150
提交评论