电缆沟槽盒作业指导书2012_第1页
电缆沟槽盒作业指导书2012_第2页
电缆沟槽盒作业指导书2012_第3页
电缆沟槽盒作业指导书2012_第4页
电缆沟槽盒作业指导书2012_第5页
已阅读5页,还剩13页未读, 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

精选优质文档-----倾情为你奉上精选优质文档-----倾情为你奉上专心---专注---专业专心---专注---专业精选优质文档-----倾情为你奉上专心---专注---专业第8部分:配网工程电缆沟、槽盒作业指导书编码:DLTJ-1目次1适用范围···········································································································································4652编写依据···········································································································································4653作业流图······································································································································4654安全风辨析与控·························································································································4665作业准备·············································································································································136作业方法···············································································································································67质量控措施及验标准······················································································································91适用范围本节适用于5V及以下配网工程砌电缆、电槽盒的施。2编写依据表2编写依据序号引资名称1B5004200《凝结工施质验规》2B5003200《体程工量收范》3/G10—208南电工施工控规》4《国方网限任司建程量制业准(HS》3作业流图图1电沟作业程图图3.2槽作业流图4安全风险析与预控4.1电沟槽盒业前施工目部据该项作业任务施条件参《网建设工安基准风险指南(下简《指南)开展对性安风评估工作形成该务的风分析表。4.2《指中电缆作业相联《网建设安施工作票(J-01-001,结合现场实际情进行差异化析,确定风等级现场技术员填写全施工作业,安全员审,施工负责人发。4.3施负责人对风险制措并在站班上对全体业人员行安全底接交底的业人员负责安全措落实到作业任和步骤。4.4安施工作票由施负责人场持工容地不变时连续使用10天超过10重新办理业票,工作完后上交目部保备。表4.1作业任务安全基准风险指南序号危害名称风险类风险级风险制施1挖掘机械回转半径围内人碰撞中风险施工域须做警标识挖机工作期间止员入2沟槽边坡无支护或护不足坍塌中风险根据质况,定护施方,取有效支措施3开挖的土方和材料器具放沟两侧坍塌打击中风险将沟挖的土及转运材工具摆放在沟槽边2m外地方4沟槽土方开挖时,水触电高险严格行机一一电的源,用合格设漏或源损坏电线操人穿鞋5沟槽两侧无有效的全围措施坠落低险设置合求的栏晚上置间示灯,防外误工区域6土方(泥浆)运输辆撒漏工环污染低险工现必设洗槽做有的撒漏、防尘施未清干的辆得开地7土方(泥浆)运输辆超、速违驾驶交意外特的险设专监,确工装载方泥)不得超、速违驾驶8挖机作无上岗碰撞打击低险挖机作必持上岗9作人前间不足碰撞打击低险确作人前间不于3m10混凝土浇筑时,平振动或源漏电触电高险严格行机一一电的源,用合格电线操人穿胶、手及护镜11手推车运送混凝土砂浆撒把碰撞低险禁手车送凝砂时把12混凝土搅拌时,搅机料的丝断股碰撞打击低险发钢绳股必更换13混凝土搅拌时,料提升下站人碰撞打击低险混土拌,斗升,方准人14斗车运送毛石、砖等物过中载满碰撞低险1.搬砖料工具牢;2.运石要力行沟里料要采滑,下不有;3.车载料得满15电缆沟砌筑时,修毛石操不当碰撞打击低险修毛块,打向得人16混凝土浇筑时,振捧或源漏电触电高险严格行机一一电的源,用合格电线操人穿胶、手及护镜17拆模时,将带钉模随意放刺伤低险拆时不乱乱,到完清18混凝土养护不足、度不够坍塌低险混土护间不小于7天有加时应小于14天19砂浆搅拌机或电源线漏电触电高险严格行机一一电的源,用合格电线操人穿胶、手及护镜20搬动混凝土预制盖过程失脱手夹伤碰撞中风险1.多搬混土制板,协一致、平放;2.人动凝预盖时应力行,抓走稳21混凝土预制盖板摆放不稳打击中风险混土制板摆应齐合、全22打机电线电触电高险严格行机一一电的源,用合格电线操人穿胶、手套5作业准备.1作业施工条件表5.1作业前施工条件序号项目内容确人说明1任单根本位际置容包本工)本序工责人经批2相证照根需办涉进工场的续证件本序工责人有效3工合同或议合及全议本序工责人有效4图纸设图纸本序工责人经批5施方案施措、全术底项部)本序工责人经批.2人员主要工具及仪仪表配置表52人、主工器具仪器仪配置序号项目内容说明1人配置施员施作人等技术岗位必须持有与作业工种相应、有的上证2施内容相应设备1)电支成品筋泥砖砂、石石、泥浆。()水预件缆盒盖等(1)电缆支架成品、钢筋、水泥、砖应符设要求应出合证检(砖在设计无规定时,应采用不小于M.5普通砖砂石石的量符现标要求。水质应符合国家现行《混凝土和用水标准》的定浆般用小于M10泥砂浆。()水泥制件缆槽、板:制件不有筋窝麻面裂损现象,外面洁有厂格及验告3施内容相应器具机及工具表施所的器、械测仪等根据现场情况使用的工器具、机械符合相关要求。仪器、仪表使用前必须经有资质的单位检合且检有期才使用4完开工程序工作负责人向项目负责人报开工,由项目负责向理位成工审续施工准备完成后可报开工,当施工准备足时上该目责协解决6作业法表6-1电沟主作业内容序号项目内容说明1作前作(1)根据规划、设计单位提供的资料图纸在施工现场置控。(2)开挖前会同各专业管线有关部门查清各专业管线走便合专管的移保免坏各专管位管内管和距近地下障碍已拆改加方处完()确高基和边的线使水仪定入基内。()测点工基经验格已好挖线。()现场施工负责人向进入施工范围内所有人员详细交待次工业容度求特项施要求作业标准安注事险及制施害境相应预控措员签(组安技交底。()前()现场施工负责人组织检查所有工作人员是否正确使用保品着,带施作人进作现场按规定戴一安,统佩有人片作(或胸证穿统的作服2开主要作业现施负人出可工令3土开挖(1)沟体挖出的土方应及时外运,不随意堆放。槽边.0m内得土得料停槽边2m以外土度大于.5。边.5m应设护()工按,如挖应先动分除然善理超度小于10m。()沟开时密注地管、筑分情,发问题应即止挖并知计监人员问题解后能续工。()如现底力达到计求报理设计建单处理4人平整沟底土开完后按场质坚情进必的底夯处及底平5浇混土垫层(1)混凝土浇捣前根据设计要求做好筋绑扎,经监理收格才浇混土浇的凝板平浇灌过程中用平板振动器振捣,确保混凝土密实度,并人工找平。()混凝:自下不于2,且匀()已筑混度级达到.2/2后方允许员其走和行他序6电沟筑(1)砖砌筑前要复测量,确定方向后进行砌筑,砌筑20m前4h面m为1筑成h过后h严()砖体横竖直竖要开缝满匀水平宜为,应于8,()砌筑宜采用挤浆法,或者采用“三一砌砖法,:一灰块挤并手挤的浆去作时砌要平线发有差随纠正严事后采撞纠。墙边边溢砖面灰刮。()电缆支架常采用固定于电缆沟侧墙用于支撑电缆的悬式状混土构通预与体定7压梁凝土注1)制安模板应托架牢固、模板平直支撑合理、稳固拆采用1m筑板压及撑采用方保电沟顶顺顶内模可采用钢内。()钢绑筋距搭焊保护等满设要并监验合。()混土灌程用入振器捣混土有关定样送资的验门验8拆养护(1)非承重的凝土度到1a构件不缺掉,可除板。()在凝完后的h内水护加覆,淋次可据温低适调气较时尤其应意凝外表不脱通凝养时不少于7天9电沟内抹灰1)抹灰工程必须在砌体结构及压顶施工完成,并经关门收格才施。()抹工的境度宜于在于的温施时应保工质的效施。()抹前检抹面的件装位是正确与体接否固10盖铺设1)预制混凝土盖板的原材料、配合、强度应符合规要。表不有、窝麻裂破损等象外面滑色一()盖就时应调构件位置使缝均匀证板与板之间的缝隙按设计要求的尺寸内正反面位置正确平稳整齐沟土方回填采用人工回填宜采用原状土石粉粗砂分层夯实每层度应大于00m严禁机械直接推填防止损坏电缆2槽盒

表2槽主要业内容序号项目内容说明1作前作(1)根据规划、设计单位提供的资料图纸在施工现场置控。()开前同专管有部清专管的走便合专管的移保免坏专业管位管内管和距近地下碍物已拆改加方处完。()确高基和边的线使水仪定入基内。()测点工基经验格已好挖线。()现场施工负责人向进入施工范围内所有人员详细交待次工业容度求特项施要求作业标准安注事险及制施害境相应预控措员签(组安技交底。()现施负人责理关工许手工按规定戴一安,统佩有人片作(或胸证穿统的作服前好场工护蔽示施夜施的有够的照。()现场施工负责人组织检查所有工作人员是否正确使用保品着,带施作人进作现场2开主要作业现施负人出许工令3土开挖(1)沟体挖出的土方应及时外运,不随意堆放。槽边.0m内得土得料停槽边2m以外土度大于.5。边.5m应设护()施过中格设图工严超发超挖首将动分除然妥处理超深小于100m时用状或(粗砂回压至计标高夯实超深再时应监理设及设位处理。()沟开时密注地管、筑分情,发问题应即止挖并知计监人员问题解后能续工。()如现底力达到计求报工场负人并现负人监、计建单处理4人平整沟底土开完后按场质坚情进必的底夯处及底平5垫处理铺(砂厚一般为00200应()。填的实应合计求6安槽盒(1)安装槽盒时,应用水平尺控制槽的水平度,槽盒每30m线直保盒同直上槽与盒间必紧靠接平盒转段置时须合缆的弯半。缆设槽内约100m厚,设后再满()铺预盖时板紧平置板应止损电缆7槽土方回填(1)槽盒土方回填宜采用人工回填,分层夯实,每层度大于300严机接填止坏缆槽盒()沉槽盖面填粉粗)层实7质量控措施及验标准1质量控制措施11现场负责应根据场情况排技术员负责量监控。12作业人员须熟悉程作业程和质检验标技术岗位员必须有与作相应效的上岗证。13现场负责在进行全技术底时必详细介本作业质控制要点常见的量通病其防治措施。14作业现场须有经核批准设计图和施工案,作业员必须图施工。15施工质量验一般以下方进。质量验般采用三检验,施队()所施工分项工程应进行00%的量自检目部对负责施分部工程单位工组织质检查复检例不宜低于50%;司对位工程织检查抽检比不低于20%。7.1.6隐蔽程施完成以全部工作业完(序)时,须提前24小时通监理现验收。7.1.7混凝浇筑工,应前4小通知监进现场旁站。2质量控制点表7.2电沟工质量控表控制点控制方式WHS电缆线路建工程●表72-2缆槽工程质控制点单控制点控制方式WHS电缆线路建工程●73检验标准质量检验《10kV~00kV变电及电工程量收与评定准第8册:配工程》的Q/CSG表7.2-表8-722要执行。●附件1安全工作业票

编码:DLT-1-001工作间工作点技术员现场全员现场责人安风分及制施序号危名称风种类风等级风控措施1挖机回半径范内人碰撞□中风险现作应格行关全程安技措并重关但限以措:□根据土质情况,制订支护施工方案,采取有效支护措施。□将沟槽挖出的土方及时转运,材料工器具摆放在离沟槽边2m以的方。□施工区域必须做好警示标识,设置符合要求的围栏,晚设夜警灯防外误工区。□工地必须设置洗车槽,未经清洗干净车辆不得离开工地。□设专人监管,确保工地装载土方(泥浆)车辆不得超载超等章驶。□严格执行使用“一机一闸一漏电”的电源箱,使用合格源,备壳接地。□禁手车送凝砂时把。□发钢绳股必更。□混土拌,斗升,方准人。□往槽下时采滑,下不有。□修毛块,打向得人。□拆时不乱乱,到完清。□混土护间不小于7天有加时不于14天。□养现进围,止员入。□搬混土制板,协一、稳置。□做沟白的防作2沟边无护或护足坍塌□中风险3开的方材料器放在沟两侧坍、击□中风险4设漏或电线坏触电□高险5沟两无效的全蔽施坠落□低险6土泥浆运输车超速等

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论