版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
**小学办公楼建筑与装饰工程施工招标
招标文件
招标人:**小学
2010年11月10日
目录
第一章招标公告(未进行资格预审).........................................3
1.招标条件.........................................................3
2.项目概况与招标范围...............................................3
3.投标人资格要求...................................................3
4.招标文件的获取...................................................3
5.投标文件的递交...................................................3
6.发布公告的媒介...................................................3
7.联系方式........................................................4
第二章投标人须知........................................................9
投标人须知前附表.....................................................9
1.总则............................................................13
1.1项目概况.....................................................13
1.2资金来源和落实情况...........................................'
13招标范围、计划工期和质量要求..................................13
1.4投标人资格要求(适用于未进行资格预审的).....................13
1.5费用承担....................................................14
1.6保密........................................................14
1.7语言文字....................................................14
1.8计用单位....................................................14
1.9踏勘现场....................................................14
1.10投标预备会..................................................14
1.11分包.......................................................15
1.12偏离.......................................................15
2.招标文件........................................................15
2.1招标文件的组成...............................................15
2.2招标文件的澄清...............................................15
2.3招标文件的修改...............................................「
3.投标文件........................................................16
3.1投标文件的组成...............................................16
3.2投标报价....................................................16
3.3投标有效期..................................................16
3.4投标保证金..................................................16
3.5资格审查资料(适用于未进行资格预审的)........................17
3.6备选投标方案................................................17
3.7投标文件的编制..............................................17
4.投标...........................................................18
4.1投标文件的密封和标记.........................................18
4.2投标文件的递交..............................................18
4.3投标文件的修改与撤回........................................18
5.开标...........................................................18
5.1开标时间和地点...............................................18
5.2开标程序....................................................19
6.评标...........................................................19
6.1评标委员会..................................................19
6.2评标原则....................................................19
6.3评标........................................................19
7.合同授予........................................................19
7.1定标方式.....................................................19
7.2中标通知....................................................20
7.3履约担保....................................................20
7.4签订合同....................................................20
8.重新招标和不再招标..............................................20
8.1重新招标....................................................20
8.2不再招标....................................................20
9.纪律和监督......................................................20
9.1对招标人的纪律要求...........................................20
9.2对投标人的纪律要求..........................................20
9.3对评标委员会成员的纪律要求...................................21
9.4对与评标活动有关的工作人员的纪律要求.........................21
9.5投诉........................................................21
10.需要补充的其他内容..............................................21
附表一:开标记录表..................................................22
附表二:问题澄清通知................................................23
附表三:问题的澄清..................................................24
附表四:中标通知书..................................................25
附表五:中标结果通知书..............................................26
附表六:确认通知....................................................27
第三章评标办法(经评审的最低投标价法)..................................29
评标办法前附表......................................................29
1.评标方法........................................................31
2.评审标准........................................................31
2.1初步评审标准.................................................31
2.2详细评审标准.................................................31
3.评标程序........................................................31
3.1初步评审....................................................31
3.2详细评审....................................................32
33投标文件的澄清和补正.........................................32
3.4评标结果....................................................32
第四章合同条款及格式...................................................39
第一节通用合同条款.................................................41
1.一般约定........................................................43
1.1词语定义....................................................43
1.2语言文字....................................................45
1.3法律..................................45
1.4合同文件的优先顺序..........................................45
1.5合同协议书..................................................45
1.6图纸和承包人文件.............................................45
1.7联络........................................................46
1.8转让........................................................46
1.9严禁贿赂....................................................46
1.10化石、文物.................................................46
1.11专利技术...................................................47
1.12图纸和文件的保密............................................47
2.发包人义务......................................................47
2」遵守法律.....................................................47
2.2发出开工通知.................................................47
2.3提供施工场地................................................47
2.4协助承包人办理证件和批件.....................................47
2.5组织设计交底................................................47
2.6支付合同价款.................................................47
2.7组织竣工验收.................................................47
2.8其他义务....................................................47
3.监理人.........................................................47
3.1监理人的职责和权力............................................一
3.2总监理工程师.................................................48
3.3监理人员....................................................48
3.4监理人的指示.................................................48
3.5商定或确定..................................................49
4.承包人..........................................................49
4.1承包人的一般义务.............................................49
4.2履约担保....................................................50
4.3分包.......................................................50
4.4联合体......................................................50
4.5承包人项目经理...............................................50
4.6承包人人员的管理.............................................51
4.7撤换承包人项目经理和其他人员.................................51
4.8保障承包人人员的合法权益.....................................51
4.9工程价款应专款专用...........................................52
4.10承包人现场查勘......................52
4.11不利物质条件................................................52
5.材料和工程设备..................................................57
5.1承包人提供的材料和工程设备....................................52
5.2发包人提供的材料和工程设备...................................52
5.3材料和工程设备专用于合同工程..................................53
5.4禁止使用不合格的材料和工程设备................................53
6.施工设备和临时设施...............................................53
6.1承包人提供的施工设备和临时设施................................53
6.2发包人提供的施工设备和临时设施................................53
6.3要求承包人增加或更换施工设备..................................53
6.4施工设备和临时设施专用于合同工程..............................54
7.交通运输........................................................54
7.1道路通行权和场外设施.........................................54
7.2场内施工道路................................................54
7.3场外交通....................................................54
7.4超大件和超重件的运输.........................................54
7.5道路和桥梁的损坏责任.........................................54
7.6水路和航空运输..............................................54
8.测量放线.......................................................55
8.1施工控制网..................................................5
8.2施工测量....................................................55
8.3基准资料错误的责任...........................................55
8.4监理人使用施工控制网.........................................55
9.施工安全、治安保卫和环境保护.....................................55
9.1发包人的施工安全责任.........................................55
9.2承包人的施工安全责任.........................................55
9.3治安保卫....................................................56
9.4环境保护....................................................56
9.5事故处理....................................................57
10.进度计划..................................57
10.1合同进度计划................................................57
10.2合同进度计划的修订.........................................57
11.开工和竣工.....................................................57
11.1开工.......................................................57
11.2竣工.......................................................57
11.3发包人的工期延误............................................
11.4异常恶劣的气候条件.........................................58
11.5承包人的工期延误............................................58
11.6工期提前...................................................58
12.暂停施工......................................................58
12.1承包人暂停施工的责任........................................58
12.2发包人暂停施工的责任.......................................58
12.3监理人暂停施工指示.........................................58
12.4暂停施工后的复工............................................59
12.5暂停施工持续56天以上......................................59
13.工程质量..................................59
13.1工程质量要求................................................59
13.2承包人的质量管理............................................59
13.3承包人的质量检查............................................60
13.4监理人的质量检查............................................60
13.5工程隐蔽部位覆盖前的检查....................................60
13.6清除不合格工程..............................................60
14.试验和检验.....................................................61
14.1材料、工程设备和工程的试验和检验.............................61
14.2现场材料试验...............................................61
14.3现场工艺试验...............................................61
15.变更..........................................................61
15.1变更的范围和内容..........................................61
15.2变更权....................................................61
15.3变更程序..................................................62
15.4变更的估价原则............................................62
15.5承包人的合理化建议........................................63
15.6暂列金额..................................................63
15.7计日工....................................................63
15.8暂估价....................................................63
16.价格调整.......................................................64
16.1物价波动引起的价格调整......................................64
16.2法律变化引起的价格调整......................................5
17.计审与支付.....................................................65
17.1计量........................................................65
17.2预付款.....................................................66
17.3工程进度付款................................................66
17.4质量保证金..................................................67
17.5竣工结算...................................................68
17.6最终结清...................................................68
18.竣工验收.......................................................69
18.1竣工验收的含义..............................................69
18.2竣工验收申请报告...........................................69
18.3验收.......................................................69
18.4单位工程验收................................................70
18.5施工期运行..................................................70
18.6试运行.....................................................70
18.7竣工清场...................................................7\
18.8施工队伍的撤离..............................................71
19.缺陷责任与保修责任..............................................71
19.1缺陷责任期的起算时间........................................71
19.2缺陷责任...................................................71
19.3缺陷责任期的延长............................................71
19.4进一步试验和试运行..........................................71
19.5承包人的进入权.............................................71
19.6缺陷责任期终止证书..........................................72
19.7保修责任...................................................72
20.保险..........................................................72
20.1工程保险...................................................72
20.2人员工伤事故的保险..........................................72
20.3人身意外伤害险.............................................72
20.4第三者责任险...............................................72
20.5其他保险...................................................72
20.6对各项保险的一般要求........................................72
21.不可抗力.......................................................73
21.1不可抗力的确认..............................................73
21.2不可抗力的通知.............................................73
21.3不可抗力后果及其处理........................................73
22.违约............................................................74
22.1承包人违约.................................................74
22.2发包人违约.................................................76
22.3第三人造成的违约...........................................77
23.索赔............................................................77
23.1承包人索赔的提出............................................77
23.2承包,人索贝杏处理程序.........................................77
23.3承包人提出索赔的期限.......................................77
23.4发包人的索赔................................................77
24.争议的解决.....................................................7t
24.1争议的解决方式..............................................78
24.2友好解决...................................................78
24.3争议评审...................................................78
第二节专用合同条款.................................................79
第三节合同附件格式..................................................81
附件一:合同协议书..............................................83
附件二:履约担保格式............................................84
附件三:预付款担保格式..........................................85
第五章工程量清单.......................................................87
1.工程量清单说明..................................................87
2.投标报价说明....................................................87
3.其他说明........................................................87
4.工程量清单......................................................88
4.1工程量清单表................................................88
4.2计日工表....................................................8f
4.3暂估价表....................................................90
4.4投标报价汇总表..............................................91
4.5工程曷清单单价分析表........................................92
第六章图纸...........................................................95
1.图纸目录.......................................................97
2.图纸...........................................................98
第七章技术标准和要求.................................................101
第八章投标文件格式....................................................W5
目录..............................................................109
一、投标函及投标函附录..............................................111
(一)投标函...................................................111
(二)投标函附录................................................112
二、法定代表人身份证明..............................................H3
二、授权委托书.....................................................114
三、联合体协议书...................................................H5
四、投标保证金.....................................................116
五、已标价工程量清单................................................117
六、施工组织设计...................................................118
附表一:拟投入本标段的主要施工设备表.............................119
附表二:拟配备本标段的试验和检测仪器设备表.......................120
附表三:劳动力计划表............................................121
附表四:计划开、竣工日期和施工进度网络图.........................122
附表五:施工总平面图............................................123
附表六:临时用地表..............................................124
七、项目管理机构...................................................125
(一)项目管理机构组成表........................................125
(二)主要人员简历表......................126
八、拟分包项目情况表................................................127
九、资格审查资料...................................................128
(一)投标人基本情况表..........................................128
(二)近年财务状况表............................................129
(三)近年完成蚪类似项目情况表..................................30
(四)正在施工的和新承接的项目情况表.............................131
(五)近年发生物诉讼及仲裁情况...................................132
十、其他材料......................................................133
第一章招标公告(未进行资格预审)
**小学办公楼建筑与装饰工程施工招标公告
1.招标条件
本招标项目**小学办公楼建筑与装饰工程已由***市住房和城乡建设委员会以
宁发改建[2010]005号批准建设,项目业主为南京市XXX,建设资金来自自羞,项目出
资比例为100%,招标人为驱匚。项目已具备招标条件,现对该项目的施工进行公开招标。
2.项目概况与招标范围
(1)现场施工条件
建设用地面积:总用地面积约3()0n1
场地拆迁及平整情况:已完成。
施工用水、电:」具备。
有关的勘探资料:地质勘探已结束。
其他:建设场地交通运输较为方便,施工中建筑材料与构配件均可经城市道辟工接运进
工地。
(2)建设面积
建筑面积:300.00mJo
(3)工程结构概况
结构形式:框架+破混结构。
基础类别:钢筋混凝土独立基础+钢筋混泥土条形基础。
墙体类别:标准砖内、外墙。
楼、屋盖类别:现浇钢筋混凝土楼板及屋面板。
(4)工程建筑概况
楼地面:花岗岩石材地面一一门厅及接待室,地砖地面一一其他
墙面:内墙面一一白色乳胶漆:外墙面一一苯丙乳胶漆
天棚:纸面石膏板吊顶一一门厅及接待室;白色乳胶漆顶棚一一其他
屋面:刚性防水屋面(有保温层)
门窗:铝合金窗;胶合板门,樟木板面层刷聚氨酯3遍
(5)计划工期:工期40日历天
3.投标人资格要求
3.1本次招标要求投标人须具备专业承包资质,业绩,并在人员、设备、资金等
方面具有相应的施工能力。
3.2本次招标不接受联合体投标。联合体投标的,应满足下列要求:—/.
4.招标文件的获取
4.1凡有意参加投标者,请于2010年1L月01日至2010年」1_月Qg日(法定公休日、
法定节假日除外),每日上午一上时至一见时,下午时至17时(北京时间,下同),
在南京市浦珠路28号持单位介绍信购买招标文件。
4.2招标文件每套售价皿元,售后不退。图纸押金邈元,在退还图纸时退还(不计利息)。
4.3邮购招标文件的,需另加手续费也元。招标人在收到单位介绍信和邮购款(含手续费)
后2日内寄送。
5.投标文件的递交
5.1投标文件递交的截止时间(投标截止时间,下同)为2010年12月01日的时止分,
地点为南京市浦珠路28号。
5.2逾期送达的或者未送达指定地点的投标文件,招标人不予受理。
6.发布公告的媒介本次招标公告同时在中国建设招标网上发布。
7.联系方式
招标人:**小学招标代理机构:南京市XX公司
地址:****************地址:****************
邮编:211816_____________邮编:211816______________
联系人:张®____________联系人:王XX_____________
电话:***********________电In:不亭平亭平亭亭不举亭亭亭举
传真:传M:
电子邮件:*********@126.com电子邮件:*********@126.com
网址:网址:
开户银行:中国农业银行开户银行:中国农业银行
账号.********************账号*******************
年月日
第二章投标人须知
投标人须知前附表
条款编列内容
条款名称
号
1.1.2名称:**小学
招标人地址:南京市浦珠路30号
联系人:鳏
电话:
1.1.3名称:南京市XX公司
招标代理机构地址;南京市浦珠路28号
联系人:王XX
电话:
1.1.4项目名称**小学办公楼建筑与装饰工程
1.1.5建设地点南京市浦珠路3。号
1.2.1资金来源业主自筹
1.2.2出资比例100%
1.2.3资金落实情况已落实
1.3.1招标范围建筑与安装工程
1.3.2计划工期:40日历天
计划工期计划开工日期:2011年3月15日
计划竣工日期:2011年4月25日
1.3.3质量要求符合国家施工验收规范标准
1.4.1资质条件:专业承包资质
财务要求:
投标人资质条件、能力和信.业绩要求:
誉信誉要求:
项目经理(建造师,下同)资格:
其他要求:
1.4.2
V□不接受
是否接受联合体投标
□接受,应满足下列要求:
1.9.1
V□不组织
踏勘现场
□组织,踏勘时间:
踏勘集中地点:
1.10.1
V□不召开
投标预备会
□召开,召开时间:
召开地点:
1.10.2投标人提出问题的截止时间2010年11月13日
1.10.3招标人书面澄清的时间2010年11月15日
1.11,□不允许
分包
□允许,分包内容要求:
分包金额要求:
接受分包的第三人资质要求:
1.12
V□不允许
偏离
□允许
2.1构成招标文件的其他材料
2.2.1投标人要求澄清招标文件的
截止时间
2.2.2投标截止时间2010年12月01日15时00分
2.2.3投标人确认收到招标文件澄
清的时间
2.3.2投标人确认收到招标文件修
改的时间
3.1.1构成投标文件的其他材料
3.3.1投标有效期投标截止日后45个日历天内有效
3.4.1投标保证金的形式:
投标保证金现金或银行本票
投标保证金的金额:宽万元整
3.5.2近年财务状况的年份要求3年
3.5.3近年完成的类似项目的年份2年
要求
3.5.5近年发生的诉讼及仲裁情况二_年
的年份
要求
3.6
V□不允许
是否允许递交备选投标方案
口允许
3.7.3签字或盖章要求签字或盖章
3.7.4投标文件副本份数立份
3.7.5装订要求密封
4.1.2招标人的地址:************
封套上写明招标人名称:**小学办公楼建筑与安装工程投标
文件
在2010年12月01日15时00分前不得开启
4.2.2递交投标文件地点南京市浦珠路28号
4.2.3
是否退还投标文件V□否□是
5.1开标时间和地点开标时间:同投标截止时间
开标地点:****************
5.2(4)密封情况检杳:由投标人或者其推选的代表
开标程序
检查投标文件的密封情况
(5)开标顺序:按照送达投标文件的逆顺序宣读
6.1.1评标委员会构成:7人,其中招标人代表1人,专
评标委员会的组建家6人:
评标专家确定方式:南京市评标专家库抽取
7.1
J口是
是否授权评标
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 【完整版】八上语文《三峡》文言文逐字翻译教案
- 中暑患者的肺功能保护
- Unit6CrossingCulturesSectionA4a-4c课件-人教版八年级英语下册
- deepseek AI搜索优化技术白皮书:原理剖析、方法框架与服务商能力评测
- 增强CT扫描中患者的输液管理
- 第4单元我为产品做包装第1课关于“包”课件冀美版初中美术八年级下册
- 尿液检查护理评估的重症监护护理
- 初中八年级生物(北师大版)下册知识清单:原生生物的主要类群深度解析
- 初中八年级生物(2026春改版)第六单元第一章 生命的延续·生殖方式的进化与适应 高阶导学案
- 打春牛(课件)五年级中国文化阅读说明文适中
- 2026湖北华宜寄宿学校广纳贤才备考题库及一套答案详解
- 2026年济南明水眼科医院医护人员招聘笔试参考题库及答案详解
- 2026年重庆市中考道德与法治真题【含答案解析】
- 2026“才聚齐鲁成就未来”山东百特展览工程有限公司校园招聘4人笔试参考题库及答案详解
- 在2026年“两优一先”表彰大会上的致辞
- (2026年)银行机构金融消费权益保护知识培训课件
- 2026年广东省东莞市八校联考中考二模化学试卷(含答案)
- 2026年安全生产月-人人讲安全、个个会应急-排查整治风险隐患
- 高一年级化学必修一会考知识点总结
- 核心肌群的训练课件
- 严虎绘画课程对应课件1
评论
0/150
提交评论