版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
建新西路四期前卫厂段道路工程
结构计算书
目录
结构计算书.....................................................................0
1.设计资料....................................................................2
2.设计依据...................................................................2
3.高边坡、深基坑边坡稳定性验算...............................................3
3.1.填方边坡稳定性验算......................................................3
3.1.1.边坡圆弧滑动稳定性验算..............................................3
3.1.2.土质边坡岩土界面滑动稳定性验算.....................................8
3.2.挖方边坡稳定性验算......................................................9
3.3.基坑支护桩稳定性验算...................................................10
3.4.顶管工作井护壁开挖验算..................................................18
4.挡护结构稳定性计算.........................................................19
4.1.衡重式挡墙计算.........................................................19
4.2.折背式挡墙计算.........................................................26
4.3.重力式挡墙计算.........................................................34
4.4.扶壁式挡墙计算.........................................................39
4.4.1.挡墙结构计算.......................................................39
4.4.2.挡墙换填层计算.....................................................48
4.5.桩板式挡墙结构计算.....................................................51
4.5.1.中1800桩计算......................................................51
4.5.2.61200桩计算......................................................60
4.5.3.①1000桩计算......................................................66
4.5.4.桩横向水平力特征值验算.............................................72
4.5.5.人工挖孔桩护壁开挖验算.............................................73
4.5.6.挡板结构验算......................................................74
5.车行地通道结构计算.........................................................76
5.1.A型断面计算...........................................................76
5.2.B型断面计算...........................................................79
5.3.地通道桩基础计算......................................................83
5.3.1.A1#~A4#、轴桩负摩阻力计算(控制计算土层深度18m)..........83
5.3.2.A5fA9#、B5#~B9#轴桩负摩阻力计算(控制计算土层深度12m)..........84
5.3.3.桩基强度计算......................................................84
5.4.地通道A型断面地梁计算................................................86
建新西路四期前卫厂段道路工程
结构计算书
1.设计资料
建新西路四期前卫厂段位于大石坝片区华润中央公园小区西南侧,呈东西走向,道路
西端起点K0+000与在建建新西路四期中海段平交,下穿红岩村大桥北桥头立交,东端终点
K0+685.133与前卫江畔南恻道路平交。本次设计道路全长685.133m。本项目实施起点为
K0+045.252,实施终点为K0+646.506,实施范围内道路全长为601.254m,道路标准路幅宽
度32nb设计车速30km/h,双向六车道,城市次干道c
本项目结构计算主要包括高边坡稳定性计算、支挡结构计算及车行地通道结构计算。
2.设计依据
《建筑边坡工程技术规范》(GB50330-2013)
《公路路基设计规范》(JTGD30-2015)
《混凝土结构设计规范》(GB50010-20102015年版)
3.高边坡、深基坑边坡稳定性验算
3.1.填方边坡稳定性验算
3.1.1.边坡圆弧滑动稳定性验算
计算项目:18m填方边坡
[计算简图]
[控制参数]:
采用规范:通用方法
计算Fl标:安全系数计算
滑裂面形状:圆弧滑动法
不考虑地震
[坡面信息]
坡面线段数4
坡面线号水平投影(m)竖直投影(m)超载数
120.00010.0000
22.0000.0000
314.0008.0000
420.0000.0001
超战1距离1.OOO(III)宽20.000(m)荷战(20.00—20.OOkPa)270.00(度)
[土层信息]
上部土层数1
层号层厚重度饱和重度粘结强度孔隙水压
(m)(kN/m3)(kN/m3)(kpa)力系数
118.00020.000—120.000—
层号粘聚力内摩擦角水下粘聚水下内摩
(kPa)(度)力(kPa)擦角(度)
10.00030.000———
层号十字板T强度增十字板I水强度增长系
(kPa)长系数下值(kPa)数水下值
1————
—————:——=====================
下部土层数1
层号层厚重度饱和重度粘结强度孔隙水压
(m)(kN/m3)(kN/m3)(kpa)力系数
110.00020.000120.000—
层号粘聚力内摩擦角水下粘聚水下内摩
(kPa)(度)力(kPa)擦角(度)
10.00030.000——
层号十字板T强度增十字板I水强度增长系
(kPa)K系数下值(kPa)数水下值
1————————
不考虑水的作用
[计算条件]
圆弧稳定分析方法:Bisnop法
土条重切向分力与滑动方向反向时:当下滑力对待
稳定计算目标:自动搜索最危险滑裂面
条分法的土条宽度:L000(m)
搜索时的圆心步长:LOOO(m)
搜索时的半径步长:0.500(m)
计算结果:
[计算结果图]
最不利滑动面:
滑动圆心=(-2,097,53.920)(m)
滑动半径=54.558(m)
滑动安全系数=1.356
起始x终止xliCi中i条实重浮力地震力渗透力
附加力X附加力Y下滑力抗滑力m0i超载竖向
地震力地震力
(m)(m)(度)⑺(kPa)(度)(kN)(kN)(kN)(kN)(kN)(kN)
(kN)(kN)(kN)(kN)
-10.417-9.470-8.2690.9570.00030.001.300.000.000.000.000.00-0.19
0.810.928380.000.00
-9.470-8.523-7.2650.9550.00030.003.750.000.000.000.000.00-0.47
2.310.938140.000.00
-8.523-7.576-6.2640.9530.00030.005.880.000.000.000.000.00-0.64
3.580.947590.000.00
-7.576-6.629-5.2640.9510.00030.007.69C.000.000.000.000.00-0.71
4.640.956730.000.00
-6.629-5.682-4.2660.9500.00030.009.18C.000.000.000.000.00-0.68
5.490.965570.000.00
-5.682-4.735-3.2690.9490.00030.0010.37C.000.000.000.000.00-0.59
6.140.974100.000.00
-4.735-3.788-2.2740.9480.00030.0011.230.000.000.000.000.00-0.45
6.600.982330.000.00
-3.788-2.841-1.2790.9470.00030.0011.79C.000.000.000.000.00-0.26
6.870.990250.000.00
-2.841-1.894-0.2840.9470.00030.0012.030.000.000.000.000.00-0.06
6.960.997880.000.00
-1.894-0.9470.7110.9470.00030.0011.970.000.000.000.000.000.15
6.871.005200.000.00
-0.9470.0001.7050.9470.00030.0011.590.000.000.000.000.000.34
6.611.012220.000.00
0.0000.8892.6700.8900.00030.0014.210.000.000.000.000.000.66
8.051.018740.000.00
0.8891.7783.6050.8910.00030.0021.25C.000.000.000.000.001.34
11.971.024790.000.00
1.77R2.6674.5410.R92000030.no2R.tno.on0.000.000.000.002.22
15.701.030560.000.00
2.6673.5565.4780.8930.00030.0034.540.000.000.000.000.003.30
19.251.036070.000.00
3.5564.4456.4170.8950.00030.0040.800.000.000.000.000.004.56
22.621.041310.000.00
4.4455.3347.3580.8960.00030.0046.79C.000.000.000.000.005.99
25.821.046270.000.00
5.3346.2238.3000.8980.00030.0052.520.000.000.000.000.007.58
28.851.050970.000.00
6.2237.2079.2950.9970.00030.0064.49C.000.000.000.000.0010.42
35.271.055620.000.00
7.2078.19110.3441.9000.00030.0070.830.000.000.000.000.0012.72
38.571.060180.000.00
8.1919.17511.3971.9040.00030.0076.790.000.000.000.000.0015.17
41.651.064390.000.00
9.17510.15912.4531.9080.00030.0082.380.000.000.000.000.0017.76
44.521.068260.000.00
10.15911.14313.5141.0120.00030.0087.600.000.000.000.000.0020.47
47.191.071780.000.00
11.14312.12714.5791.0170.00030.0092.440.000.000.000.000.0023.27
49.G51.074940.000.00
12.12713.Ill15.6501.0220.00030.0096.890.000.000.000.000.0026.14
51.901.077750.000.00
13.Ill14.09616.7261.0280.00030.00100.960.000.000.000.000.0029.05
53.961.080190.000.00
14.09615.08017.8081.0340.00030.00104.620.000.000.000.000.0032.00
55.811.082260.000.00
15.08016.06118.8971.0400.00030.00107.880.000.000.000.000.0034.91
57.461.083950.000.00
16.06417.04819.9931.0470.00030.00110.720.000.000.000.000.0037.86
58.901.085260.000.00
17.04818.03221.0971.0550.00030.00113.150.000.000.000.000.0040.73
60.141.086180.000.00
18.03219.01622.2091.9630.00030.00115.140.000.000.000.000.0043.52
61.171.0R6700.000.00
19.01620.00023.3301.0720.00030.00116.690.000.000.000.000.0046.21
61.991.086810.000.00
20.00021.00024.4691.0990.00030.00114.710.000.000.000.000.0047.51
60.961.086490.000.00
21.00022.00025.6291.1090.00030.00105.360.000.000.000.000.0045.57
56.031.085720.000.00
22.00023.00026.7991.1200.00030.00101.230.000.000.000.000.0045.64
53.891.084500.000.00
23.00024.00027.9821.1320.00030.00102.290.000.000.000.000.0047.99
54.541.082800.000.00
24.00025.00029.1781.1450.00030.00102.820.000.000.000.000.0050.13
54.931.080620.000.00
25.00026.00030.3881.1590.00030.00102.800.000.000.000.000.0052.00
55.061.077930.000.00
26.00027.00031.6141.1740.00030.00102.210.000.000.000.000.0053.58
54.911.074720.000.00
27.00028.00032.8551.1900.00030.00101.03C.000.000.000.000.0054.81
54.461.070960.000.00
28.00029.00034.1151.2080.00030.0099.220.000.000.000.000.0055.65
53.711.066640.000.00
29.00030.00035.3931.2270.00030.009G.77C.000.000.000.000.005G.05
52.621.061720.000.00
30.00031.00036.6921.2470.00030.0093.640.000.000.000.000.0055.95
51.191.056190.000.00
31.00032.00038.0131.2690.00030.0089.80C.000.000.000.000.0055.31
49.381.050000.000.00
32.00033.00039.3591.2930.00030.0085.210.000.000.000.000.0054.04
47.161.043120.000.00
33.00034.00040.7311.3200.00030.0079.830.000.000.000.000.0052.09
44.511.035520.000.00
34.00035.00042.1321.3480.00030.0073.600.000.000.000.000.0049.37
41.371.027140.000.00
35.00036.00043.5651.3800.00030.0066.470.000.000.000.000.0045.81
37.701.017940.000.00
36,00026*945.0251.4000.00030.no52.21o.on0.000.000.00000R6.93
29.911.007910.000.00
36.98937.97946.5141.1380.00030.0032.100.000.000.000.0019.5737.49
29.920.997000.000.00
37.97938.96848.0461.4800.00030.0010.890.000.000.000.0019.7922.81
17.980.985070.000.00
总的下滑力=1331.087(kN)
总的抗滑力=1807.605(kN)
土体部分下滑力=1331.087(kN)
土体部分抗滑力=1807.605(kN)
筋带在滑弧切向产生的抗滑力=0.000(kN)
筋带在滑弧法向产生的抗滑力=0.000(kN)
3.1.2.土质边坡岩土界面滑动稳定性验算
本工程土质边坡沿土岩界面整体滑动主要位于1#边坡,取最不利地勘断面4-4'进行
验算。
地勘4-4,断面条块划分示意图
4-4'地勘剖面基础信息程定性分析
块
曷
条
面
1面
岩面饱和自身自身传递剩余下'稳定
力
长
重
度
11角
条块面积脩超载滑面C
4*重度下滑力抗滑力系数渭力系数
编月
⑺(回(。)(吟(kPa)(。)(kNnf)(kN)(kN)—(^)(无)
14.6362514.06.020.05.020.0212.651.4143.01.0000.01350
239.7211.7421.011.020.05.020.01014.4363.5317.70.988128.21.35
345.657.1015.07.020.05.020.01053.0272.5231.00.988228.11.35
4217.8225.749.013.020.05.020.04616.4722.2913.70.934270.61.35
535.9812.450.10.00.025.020.0719.60.6335.64.91.35
地勘4-4,断面计算结果
本段边坡为临时边坡,边坡安全等级为一级,所以边坡稳定安全系数应大于L35,经
计算可知,本段边坡稳定安全系数为L35时,边坡剩余下滑力为4.9KN,剩余下滑力较小,
设计考虑采用坡脚护脚墙进行支挡。
3.2.挖方边坡稳定性验算
NN
裂隙265*Z70*裂隙265'Z70*
岩层层面116°N8'岩层层面116*Z8*
左般方减附ZW右峨方城网Z90,
根根据上述地勘评价及现状地形,该段为岩质挖方边坡,边坡安全等级为二级,该段
边坡无放坡限制条件。根据边坡赤平投影图可知,左侧边坡为切向坡,开挖边坡稳定性主
要受控于岩体强度;右侧边坡主要是破坏模式为沿裂隙1滑塌破坏,设计考虑中风化岩层
按1:1(约45°缓于裂隙1/60°)坡率法放坡。
边坡岩体破裂的泥岩取59°,按设计放坡后,边坡倾角缓于岩体破裂角,故岩质边坡
整体稳定。同时为避免边坡风化掉块,坡面考虑采用有机基材护坡。
3.3.基坑支护桩稳定性验算
[支扰方案]
排桩支护
s
•Oel
I
1O
[基本信息]
规范与规程《建筑基坑支护技术规程》JGJ120-2012
内力计算方法增量法
基坑等级二级
基坑恻壁重要性系数Y01.00
基坑深度H(m)13.000
嵌固深度(m)5.000
桩顶标高(m)-1.000
桩材料类型钢筋混凝土
混凝土强度等级C30
桩截面类型圆形
L桩直径(m)1.500
桩间距(m)4.000
有无冠梁有
卜冠梁宽度(m)1.500
卜冠梁高度(m)1.000
L水平侧向刚度(MN/m)738.281
放坡级数1
超载个数1
支护结构上的水平集中力0
[放坡信息]
坡号台宽(m)坡高(m)坡度系数
10.0001.0001.500
[超载信息]
I超载||~超超值~|作用深度|作用宽度|距坑边距|-~|-~i
II序号(kPa,kN/m)(in)(in)(m)(in)|
1120.000————-1
[附加水平力信息]
水平力作用类型水平力值作用深度是否参与是否参与
序号(kN)(m)倾覆稳定整体稳定
[土层信息]
土层数2坑内加固土否
内侧降水最终深度(m)25.000外侧水位深度(m)25.000
内侧水位是否随开控过程变化否内侧水位距开抄而距图(m)—
弹性计算方法按土层指定X弹性法计算方法m法
基坑外侧土压力计算方法主动
[土层参数]
层号土类名称层厚重度浮重度粘聚力内章擦角
(m)(kN/m3)(kN/m3)(kPa)(度)
1素填土13.0019.5—0.0030.00
2中风化岩10.0025.4—0.0052.00
层号与锚固休摩粘聚力内摩擦角水卜计算方法m,c,K值抗剪强度
擦阻力(kPa)水下(kPa)水下(度)(kPa)
0.1———m法10.00—
2300.0———m法100.00—
[支锚信息]
一支锚道数1
支锚支锚类型水平间距竖向间距入射角总长锚固段
道号(m)(m)(0)(m)长度(m)
1内撑4.0001.500———
支锚预加力支锚刚度锚固体工况锚固力材料抗力材料抗力
道号(kN)(MN/m)直径(mm)号调整系数(kN)诡整系数
1500.00959.43—2~—1000000.001.00
[土压力模型及系数调整]
弹性法土压力模型:经典法土压力模型:
一般分布一般
层号上类水土水压力外侧土压力外侧土压力内侧土压力内侧土压力
名称调整系数调整系数1调整系数2调整系数最大值(kPa)
1素填土分算1.0001.0001.0001.00010000.000
2中风化岩分算1.0001.0001.0001.00010000.000
[工况信息]
工况工况深度支锚
号类型道号
1开吃3.500—
—
2加建1.内撑
3开花13.000—
[设计结果]
[结构计算]
各工况:
工况1一册(350m)
工况2--加愫1(150m)
拄郴N/m)他/mm)穹嫩K”rn)勇郴N)
(-1024640)--(36467)(-156)—(011)(-72172)—(572.22)(-37685)—(39233)
工况3一刑(1300m)
内力位移包络图:
包络图
近库鼠mm)
联端董19mm
[冠梁选筋结果]
As3As2
}泮h
\x\As2
钢筋级别选筋
AsiHRB4008E20
As2HRB40011E16
As3HRB400E12S200
[截面计算]
钢筋类型对应关系:d-HPB300,D-HRB335,E-HRB400,F-RRB400,G-HRB500,P-HRBF335,Q-HRBF400,R-HRBF500
[截面参数]
桩是否均匀配筋是
混凝土保护层厚度(mm)80
桩的纵筋级别HRB400
桩的螺旋箍筋级别HRB400
桩的螺旋箍筋间距(mm)100
弯矩折减系数0.85
剪力折减系数1.00
荷载分项系数1.40
配筋分段数一段
各分段长度(m)17.00
[内力取值]
-
段
号内力类型弹性法经典法内力为力
一计算值计算值设计值实用值
基坑内侧最大弯矩(INm)3682.243726.874820.054820.05
1基坑外侧最大弯矩(kN.m)1785.101899.342336.702336.70
最大剪刀(kN)1526.611509.772350.982350.98
段选筋类型级别钢筋实配[计算]面积
号实配值(mm2或mm2/m)
1纵筋I1RB40084E2541233[22770]
箍筋HRB400E12I01OO2262E1772]
加强箍筋HRB400E2502OOO191
[整体稳定验算]
箱rri
计算方法:瑞典条分法
应力状态:总应力法
条分法中的土条宽度:1.00m
滑裂面数据
整体稳定安全系数Ks=3.114
圆弧半径(m)R=14.353
圆心坐标X(m)X=-2.242
圆心坐标Y(m)Y=8.856
[抗倾覆稳定性验算]
抗倾覆安全系数:
叫
Ks=——
Mp—被动土压力及支点力对桩底的抗倾覆弯矩,对于内支撑支点力由内支撑抗压力
决定;对于锚杆或锚索,支点力为锚杆或锚索的锚固力和抗拉力的较小值。
Ma——主动土压力对桩底的倾覆弯矩。
注意:锚固力计算依据锚杆实际锚固长度计算。
T况1,
注意:锚固力计算依据锚杆实际锚固长度计第。
序号支锚类型材料抗力(kN/m)锚固力(kN/m)
1内撑0.000
45556.218+0.000
K=
6364.496
Ks=7.158>=1.25C,满足规范要求。
工况2:
注意:锚固力计算依据锚杆实际锚固K度计算。
序号支锚类型材料抗力(kN/m)锚固力(kN/m)
1内撑250000.000
45556.218+4125000.000
K=
56364.496
Ks=655.285>=1.250,满足规范要求。
工况3:
注意:锚固力计算依据锚杆实际锚固长度计算。
序号支锚类型材料抗力(kN/m)锚固力(kN/m)
1内撑250000.000
4466.936+4125000.000
K=
s6364.496
Ks=648.829>=1.250,满足规范要求。
安全系数最小的工况号:工况1。
最小安全Ks=7.158>=1.250,满足规范要求。
[嵌固深度计算]
嵌固深度计算参数:
嵌固深度计算过程:
按《建筑基坑支护技术规程》JGJ120-2012单支点结构计算嵌固深度Id:
1)Id按公式:
EMp2
K=R
Lak£7a2
520.476X12.969
K==\25()>K=1.25
701.513x7.661em
得到Id=2.203m,Id采用值为:5.000m
当前嵌固深度为:2.203m。
依据《建筑基坑支护技术规程》JGJ120-2012,
单点支护结构嵌固深度Id不宜小于0.3鼠
嵌固深度取为:3.900m。
[嵌固段基坑内侧土反力验算]
工况1:
Ps=1964.583WEp=52529.039,土反力满足要求。
工况2:
Ps=1909.806WEp=52529.039,土反力满足要求。
工况3:
Ps=2209.785WEp=10720.498,土反力满足要求。
式中:
Ps为作用在挡土构件嵌固段上的基坑内侧土反力合力(kN):
Ep为作用在挡土构件或固段上的被动土压力合力(kN).
3.4.顶管工作井护壁开挖验算
本项目顶管工作井采用垂直护壁开挖,最大深度约为11.5m;土层及强风化考虑施加
护壁加以支护,护壁最大深度约IL5m,内空直径4.6m,开挖外轮廓直径5.2%平均壁厚
0.275mo
根据《重庆市建筑桩基础设计与施工验算规范DBJ50-200-2014,条文说明4.3.7条》
进行护壁计算,计算结果如下:
1〃用食・身户tf(力窗1羯克・上压力•主
币:庆市建筑桩J£0设计。*I承兑现,DBJ50-200-2014,条文说明4.3.7条堵土质力胃痛■彳&Fk公式计X。
J-3a
11.5Z自地面至计算极面处的深度(
m)£・W(WT
25.0V土体等效内摩擦角C)■“・¥)•・(«•一・卜兴
式中p..—立・上愿力修>•
30.0A点内摩擦角©定值(4.一
师,)0住支■内・・余,小•住±.,察用尸式“抬■力
内♦・角■依内・■倒“
200⑦B点内庠擦角假定值n.
7«»XAWlKl,Kt,tANAT/fMtr*Ji
20.0Y土体中度(kN/m>)
2.460r护壁中心半径(m)
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 基于云计算的2025年教育资源共享平台构建与创新实践
- 2025-2026学年陋室铭教学设计新课标
- 高中信息技术 第二章 第二节 Windows98基本操作教案 浙教版
- 2025-2026学年逻辑题教学设计
- 高中政治新教材选修3第2单元遵循逻辑思维规则单元总结提升教学设计
- 2025-2026学年母亲的教学设计
- 2025-2026学年课程思政教学设计图
- Unit 17 I hope he hasn't told her!教学设计-2025-2026学年小学英语3B新概念英语(青少版)
- 2025-2026学年防蚊防暑教案
- 2025-2026学年高中生健康教育教案
- 2026中国进出口银行招聘考试(专业知识)历年参考题库含答案详解
- 第19课《培养德智体美劳全面发展的社会主义建设者和接班人》教学设计-2026-2027学年统编版九年级语文上册
- 2026年重庆市公务员真题和答案
- 2026年4月自考00037美学试题及答案含评分参考
- (新教材)2026年部编人教版一年级上册语文 6 j q x 课件
- 挖掘机租赁合同标准范本下载
- 减震垫片施工方案
- 责任心和执行力培训课件
- 2025年山西省教师职称考试(思想政治/道德与法治)历年参考题库含答案详解(5卷)
- 桉树买卖合同(2025版)
- 第9谭《艺术与科技的新结合》课件-2024-2025学年赣美版(2024)初中美术九年级上册
评论
0/150
提交评论