1、,G b) quality; and c) barriers Observe in the workshop to check: Is there a meeting with operators at the beginning of shift? What kind of topics reviewed in this meeting?,People Commitment - SIM Production 1b - Short interval production tracking - P3 - Q,People Commitment - SIM Production 1b - Shor
2、t interval production tracking - P3 - Q,People Commitment - SIM Production 1b - Short interval production tracking - P3 - Q,4 SPS Advanced 8. Complex issues are addressed through Six-Sigma or Kaizen Six-Sigma is focus on reducing variability to reach a performance on a process Kaizen is focus on eli
3、minating waste on the whole product flow 9. Pareto analysis of quality issues and waste is routinely done and updated Pareto analysis of quality issues and waste done and updated at least done weekly 10. At least 80% of the difference between red/green is explained down to root causes Use “5 why” to
4、 find the root causes,People Commitment - SIM Production 1b - Short interval production tracking - P3 - Q,People Commitment - SIM Production 1c - SIM Production implementation - P4, P10,1 - SPS Notion 2- SPS Basic 3- SPS Standard 4 - SPS Advanced 5 - SPS Expert,Focus on: SIM Production implemented a
5、nd respected the plant event cycle. Key points: Operators are involved in SIM Production (beginning / end of shift) Objectives Definition Results / Barrier Log they are tracked By MTM software: The standard time is given by certificated people. Check the manufacturing time for several benches, to fo
6、und out if: If the manufacturing time is given by MTM methods, the way of calculation is correct. If the manufacturing time is given by stopwatch, the way of measuring is correct. 5. 80% of Standards (UT,DT) are updated with the operating tasks. 80% UT,DT are updated when changes happen Check the ma
7、nufacturing modification process to found out if the time standard is updated on time;,Product / Process Eng. Process Architecture/Lean design 4a - Lean Design / Mfg Time Definition (Manual / Semi Auto Assy) - P16,4 SPS Advanced 6. For current pre-engineered processes, the Useful Times and Design Ti
8、mes are predetermined using MTM methodology. UT is predetermined by MTM method to evaluate the new process design. 7. Video Analysis / Stop Watch are used to determine the UT The updating process is formalized. Check if the TSR and OTR are updated every year.,Product / Process Eng. Process Architect
9、ure/Lean design 4a - Lean Design / Mfg Time Definition (Manual / Semi Auto Assy) - P16,Focus on: Manufacturing time definitions are understood and implemented Key points: Correct understanding of UT, NEE, OEE, SUR Proper use of UT, NEE, OEE,SUR The measuring time is periodically updated KPIs: NEE /
10、OEE / SUR,Audit in office,1 - SPS Notion 2- SPS Basic 3- SPS Standard 4 - SPS Advanced 5 - SPS Expert,1. Manufacturing times are identified Check the historic record. 6. UT is based on theoretical rate : UT is defined for each product (or tooling) Each product(or tooling) has it own defined UT UT is
11、 measured based on the theoretical rate. 4 SPS Advanced 7. Video Analysis / Stop Watch are used to define time of different standard tasks - Change Over - Maintenance - Set up- The change over, maintenance and set up of the machine is standardized. Video and stop watch are used to define these stand
12、ardized task. 8. Rate deviation is verified periodically (at least once a month) and is under control. Rate deviation is documented. Rate deviation is verified at least once a month. Check the historic rate deviation verification record.,Product / Process Eng. Process Architecture/Lean design 4a - M
13、anufacturing Time definition (Automated Assy) - P16,5 SPS Expert 9. Manufacturing time databases are under control and updated at least once per year. Check if UT are updated at least once per year Check if NEE,OEE, SUR are tracked 10. Rate deviation is verified periodically (at least once a week) a
14、nd there is little or no deviation. Rate deviation is verified at least once a week. Deviation is near to zero,Product / Process Eng. Process Architecture/Lean design 4a - Manufacturing Time definition (Automated Assy) - P16,Focus on: Line / Workstations Architecture Key points: LADM implementation
15、Flexibility line design,Audit in office and workshop,1 - SPS Notion 2- SPS Basic 3- SPS Standard 4 - SPS Advanced 5 - SPS Expert,1. Concept of Line/cell flexibility If the work stations is L or I shape, check if the operators work on the same side. 4 SPS Advanced 7. Line layout is optimized (distanc
16、e between stations, MPH, operator reach , parts layout) Layout is optimised in the following area: Distance between stations is suitable for the operators loading and unloading Qty/container and KB qty is calculated according to the feeding frequency. RM is placed in the ergonomics zone Parts is wel
17、l layout to for the operators to reach a high efficiency 8. Process/Line is designed to allow step by step investment During the design process, the small change to increase the capacity (such as adding a bench) should be considered Check the design documents,Product / Process Eng. Process Architect
18、ure/Lean design 4b - Process Design / Lean Concept - P4, P16, P28,4 SPS Advanced(continuous) 9. Equipment and work cells are mobile and can be easily modified or re-located. Equipment or work cell are mobile Wheels below the bench Quick disconnection of pressed air, cooling water etc. Check in the b
19、ench to see if the work cell are easy to be moved 5 SPS Expert 10. LADM is fully optimized and implemented for all processes The Layout is fully implemented with the LADM methodology. 11. Plant infrastructure supports a flexible manufacturing layout. The production line could be easily moved from on
20、e place to another Mobile production bench pressed air, electric, exhausting system, cooling system are well organized that equipment could easily access them.,Product / Process Eng. Process Architecture/Lean design 4b - Process Design / Lean Concept - P4, P16, P28,Focus on: Process design / Mix Mod
21、el organization Key points: Product and process are designed to reduce lead time minimize stocks of parts or sub-assembly Manufacturing plant is proactive in Product/process design changes (late product/process differentiation and component standardization) Change proposal for current products Proce
22、ss design involving for new products Manufacturing plant is involved in process design Industrial architecture of the product shows the different steps of components and sub-assemblies all along the process flow,Audit in office,1 - SPS Notion 2- SPS Basic 3- SPS Standard 4 - SPS Advanced 5 - SPS Exp
23、ert,5. Quick changes in product design for complexity reduction or late differentiation are identified.,6. Changes recommended by the plant on existing designs are started through Product Evolution Process,8. Plant and Product Engineering are fully engaged in the PEP The recommended changes based on
24、 the product evolution process has started. 7. Assembly sequence and/or internal supply chain changes are fully implemented. Check the assembly sequence and/or internal supply chain, to found if they are as defined in point 4 5 SPS Expert 8. Plant and Product Engineering are fully engaged in the PEP
25、 The PEP process is in process for the existing product,Product / Process Eng. Process Architecture/Lean design 4d - Late Differentiation / Adaptation - P25,Focus on: Employee comfort and safety have been considered in the Workstation design / Working zone Key points: =S= Ergonomics standards (handb
26、ook/Intranet) are known and understood Ergonomics Leader is identified in the plant Operator working conditions assembly Handling Carrying loads: how much weight? Exerted forces: is excess force required for the operator to complete their task? Operator satisfaction Interview operator about their wo
27、rking conditions,Audit in the whole plant,1 - SPS Notion 2- SPS Basic 3- SPS Standard 4 - SPS Advanced 5 - SPS Expert,1. Methods Engineers know of SPS ergonomics Directives,2. Layout defined according to the basic ergonomics directives,3. Methods engineers are trained in Schneider ergonomics directi
28、ves and rules applied,5. Ergonomics conditions are diagnosed for workstation design (and modifications) by ergonomics application expert,7. Ergonomics working conditions are part of the learning cycle (historical data is tracked),9. Ergonomics Floor storage is implemented for the materials of high v
29、olumes. b) The percentage of re-turnable containers. 8. Warehouse performance to key indicators exceeds objectives.,Focus on: Line replenishment process. Key points: MPH process Replenish b) Minimum IPR 60 : Detection under control (no visual); c) Cpk 1,50 for Critical Queue dashboard is visible in
30、the workshop; Root causes of daily delays are known and tracked. KPIs: OTDM Inventory level,Audit in workshop,Management of Manufacturing order quantities 5 days avg. Demand,3. WIP Control Plan implemented.,4. FIFO flow; order quantities 10% (dock to dock value added processing time over the total p
31、rocess lead time.,1 SPS Notion 1. Knowledge of lean concepts and WIP impact and evidence of efforts to limit overproduction Single piece flow concept is known. WIP is clearly seen as a waste Production supervisor order quantities 10%,Management of Mfg. Logistic condition: Incoterms, packing, lead ti
32、me, lot size, weight, delivery frequency; Forecast process description; Order execution process description; KPIs description (SSR-OTD-Shortage). Analysis Forecast process description; Order execution process description. Root cause analysis for delay sales orders and corrective action is followed.
33、KPIs: OTDM/OTDS ULO OTDC2,Audit in logistic dept,Management of Manufacturing The recommended changes based on the product evolution process has started. 7. Assembly sequence and/or internal supply chain changes are fully implemented. Check the assembly sequence and/or internal supply chain, to found if they are as defined in point 4 5 SPS Expert 8. Plant and Product Engineering are fully engaged in the PEP The PEP process is in process for the existing product,Product / Process Eng. Process Architecture/Lean design 4d - Late Differentiation / Adaptation - P25,3 SPS Standard(continued) 5. Roo
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 电子商务增长趋势预测方案
- 2026广东江门公用水务环境股份有限公司招聘2人备考题库及1套完整答案详解
- 2026四川大学华西临床医学院、华西医院科研岗、实验技术岗社会招聘备考题库及参考答案详解1套
- 2026云南楚雄州姚安县职业高级中学实验室科研助理 (公益性岗位)招聘1人备考题库及参考答案详解1套
- 2026广东佛山市顺德区公立医院招聘高层次人才48人备考题库含答案详解(考试直接用)
- 2026辽宁沈阳兴远东汽车零部件有限公司招聘2人备考题库含答案详解ab卷
- 2026湖北黄石市文化和旅游局招聘政府雇员2人备考题库含答案详解(培优b卷)
- 中国电子科技集团公司第四十、四十一研究所2026届校园招聘备考题库附答案详解
- 2026宁波东方人力资源服务有限公司招聘编外人员1人备考题库附答案详解(完整版)
- 2026宁夏民族职业技术学院银龄教师招聘20人备考题库及1套完整答案详解
- LY/T 3296-2022木结构钉连接部耐腐性能测试方法
- 七人学生小品《如此课堂》剧本台词手稿
- YY 1650-2019X射线图像引导放射治疗设备性能和试验方法
- GB/T 12238-2008法兰和对夹连接弹性密封蝶阀
- 精品课程《人文地理学》完整版
- 机械制造质量分析与控制
- 广东省东莞市各县区乡镇行政村村庄村名明细及行政区划代码
- 新教材教科版六年级下册科学1-2《认识工程》教学课件
- 创意综艺风脱口秀活动策划PPT模板
- Infiniti系列多参数生物反馈仪使用说明书(共73页)
- 心内一科科室质量与安全管理小组工作记录(共27页)
评论
0/150
提交评论