版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、COSL Haiyang Shiyou 941 400 Drilling Rig Project,COSL Haiyang Shiyou 941,National Oilwell,Derrick Equipment Package (DEP) BOP Handling System Mud mixing and conditioning system Jacking System,COSL Haiyang Shiyou 941 400 Drilling Rig Project,Derrick package,Jacking system,Mud System,OVERVIEW,BOP Hand
2、ling,COSL Haiyang Shiyou 941 400 Drilling Rig Project,DEP to Cantilever,Pipehandling Crane to Cantilever,Important Interfaces,Catwalk machine to Pipedeck,BOP Handling to Cantilever,Jacking system to Hull,Power Interfaces. Piping Interfaces Control systems,National Oilwell Project Organization ChartC
3、OSL HaiYang ShiYou 941 Jack-up,Chen Lisheng Technical Manager COSL,Luo Youan Project Control Manager COSL,* Eric Clifford mob to China July,Key dates,COSL Haiyang Shiyou 941 400 Drilling Rig Project,Derrick with equipment,Pipehandling Crane,Derrick Equipment Package (DEP),Drillfloor and Substructure
4、,DEP Scope Of Supply,Drillfloor Layout,Plan View of Drillfloor,Plan View of Drillfloor Roof,Setback area for 312, 5”stands, 5, 9 ” Stands 6, 8” Stands,COSL Haiyang Shiyou 941 400 Drilling Rig Project,1891 Knuckle-boom Crane,20T SWL Catwalk Machine,COSL Haiyang Shiyou 941 400 Drilling Rig Project,Hyd
5、raRacker X-Y,Iron Roughneck HydraTong,Pipe Tailing Arm,Drillers Cabin,Drillfloor,Drill line Spooler,Powered Mousehole,Standbuilding Animation,INTRODUCTION SYSTEM TOPOLOGY,Drilling Instrumentation SDI,Cyberbase A,Video signals,Work stations,CCTV control panel,Profibus FDL redundant network,NT Server,
6、PLC,NT Server,PLC,PLC,PLC,DP,Remote IO Module in Mud Area,Company Man,Toolpusher,DB log server,Onshore Link & HAWK Support,Drill PLC (DCI) -HPU -HVAC -Slips,DP,PLC,PLC,Drawwork PLC -Automatic Driller,-MCC Interface -Mud Pumps -Rotary Table,Pipehandling PLC (X-Y) Hydra racker,Top Drive -Elevator,PLC,
7、Switch,HUB,PLC,Iron Roughneck Catheads,Cyberbase B,EQUIPMENT DRAWWORK SSGD 750,FEATURE: SSGD (Single Speed, Gear Driven) no chains, transmission, clutches, gearboxes 4 x 1150 HP AC-motors Performance comparable to Conventional Drawworks Increased control of load for all operations by using AC-motors
8、 Full usage of motors torque and speed characteristics Simple Design - Fewer Components - Reduced Maintenance - Reduced Down time Small Footprint & Light Weight Wire rope life improved due to larger drum. Easy installation - Few parts - Few interface points Noise insulated Reduced noise AC Motors us
9、ed for Primary Braking no free fall Sophisticated control system,FEATURE: Designed according to API 8C, PSL1 Lifting capacity = 750 tons 1150 hp AC-motor # 64.175 ft.lbs continous 260RPM Rigid gearbox design incl. / helical cut gears, separate top bearings and tripple to seals Short built in height
10、Encased service loop Forced gearbox cooling system,EQUIPMENT TOPDRIVE type HPS 750 E AC,BOP Handling,125 ton BOP Crane,2 x 17,5 ton Service Crane,2 x125 ton BOP Skids,COSL Haiyang Shiyou 941 400 Drilling Rig Project,Knuckle-boom-Crane Loading Pipe Into Catwalk Machine,Standbuilding,COSL Haiyang Shiy
11、ou 941 400 Drilling Rig Project,X-Y Column Racker Picks Up Single from Catwalk Machine,Standbuilding,COSL Haiyang Shiyou 941 400 Drilling Rig Project,X-Y Column Racker Places Single In Hydraulic Mousehole,Standbuilding,COSL Haiyang Shiyou 941 400 Drilling Rig Project,X-Y Column Racker Lowers Single
12、into Hydraulic Mousehole,Standbuilding,COSL Haiyang Shiyou 941 400 Drilling Rig Project,X-Y Column Racker pipes up second single from Catwalk Machine,Standbuilding,COSL Haiyang Shiyou 941 400 Drilling Rig Project,X-Y Column Racker Places Single on top of Single in Mousehole,Standbuilding,COSL Haiyan
13、g Shiyou 941 400 Drilling Rig Project,Iron Roughneck Makes Up Connection,Standbuilding,COSL Haiyang Shiyou 941 400 Drilling Rig Project,XY Racker removes double from Mousehole,Standbuilding,COSL Haiyang Shiyou 941 400 Drilling Rig Project,XY Racker Places double in aux. Fingerboard,Standbuilding,COS
14、L Haiyang Shiyou 941 400 Drilling Rig Project,XY Racker picks up third single From Catwalk Machine,Standbuilding,COSL Haiyang Shiyou 941 400 Drilling Rig Project,XY Racker places single in Mousehole,Standbuilding,COSL Haiyang Shiyou 941 400 Drilling Rig Project,XY Racker place double on top of single,Standbuilding,COSL Haiyang Shiyou 941 400 Drilling Rig Project,Iron roughneck makes up connection,Standbuilding,COSL Haiyang Shiyou 941 400 Drilling Rig Project,XY Racker rotates to fingerboard,Standbuilding,COSL Haiyang Shiyou 941 400 Drilling Rig Project,XY Racker rotates
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026年山西工程职业学院单招职业适应性测试题库有答案详细解析
- 2026年威海荣成市面向村(社区)党组织书记公开招聘事业单位工作人员(3人)考试备考题库及答案解析
- 河南省南召县联考2026年初三下学期第二次周练语文试题含解析
- 甘肃省天水市秦安县2025-2026学年下学期初三联考试卷英语试题含解析
- 山东省德州市乐陵市花园中学2026年初三1月第一次诊断语文试题理试卷含解析
- 2026届云南省楚雄州-重点名校初三重点班下学期开学英语试题含解析
- 浙江省鄞州区2025-2026学年初三第一次联考(4月)语文试题试卷含解析
- 2026届山东省济宁地区初三下学期期中统考英语试题含解析
- 浙江杭州余杭区重点中学2025-2026学年初三下学期3月练习卷英语试题试卷含解析
- 环境提升整改承诺书(6篇)
- 建筑防水工程技术规程DBJ-T 15-19-2020
- 《创新创业基础》课件-模块四 创新成果保护与转化
- 燃料检修潜在风险与预控措施
- 中学生防震减灾知识
- 劳务合同模板电子下载
- 新安全生产法全文-安全生产法全文
- 初中体育-篮球绕杆运球教学课件设计
- 《物理(下册)》教学课件-第六章-光现象及其应用
- 麦积山石窟课件
- 分数百分数应用题的复习课件
- 开复工安全检查表
评论
0/150
提交评论