版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、ABC Activity Based Costing/GRIMM,TRAINING PRESENTATION,Activity Based Costing/GRIMM,ABC Definition / Disclosure / Background Pg. 4 Currently the database represents over 400 equipment manufacturers, and approximately 1600 machines, 2300 raw materials, Domestic and Maquiladora, Spain, and Portugual.
2、Machines and Materials are updated annually. Raw material suppliers are contacted every year, and the new cost is entered into the system. Machine manufactures are contacted on a three year cycle. During the preceding two years, the PPI (Purchased Price Index, supplied by the Bureau of Labor Statist
3、ics) is utilized to update cost on an annual basis. The PPI method of updating has proved to be very accurate, within 1/2% of the new quotes from the manufacturers.,ABC Activity Based Costing Cost Elements;,Materials (includes raw matl. and purchased components) Labor Direct Labor Indirect Labor (No
4、n-Skilled) Fringe Benefits MRO Labor (Skilled) Equipment Overhead (Burden) Depreciation Interest (Opportunity cost) Floorspace Cost (Building and Expenses) MRO - Equipment Maintenance (Non-Labor) MRO - Tooling Maintenance (Non-Labor) Utilities Indirect Materials Insurance Markups (includes SGA, Prof
5、it, End-Item scrap, RD General ManufacturingWiring ForgingElectrical / Electronics Rubber Employment Supplier / Estimator Feedback,Activity Based Costing LABOR DIRECT LABOR,Activity Based Costing LABOR INDIRECT LABOR,Personnel not directly associated with manufacturing process Such as; Material Hand
6、lers, Shipping/Receiving, Quality Control, First Line Supervision Supplier / Estimator Feedback,Activity Based Costing LABOR FRINGE BENEFITS,Personnel Benefits Such as; Shift premiums, vacation/holiday pay, insurance, pensions, tuition reimbursements, clothing allowances, etc. Expressed as a percent
7、age of Direct Supplier / Estimator Feedback,Activity Based Costing LABOR MAINTENANCE, REPAIR R.S. Means Construction and Maintenance Models Marshall and Shift; Construction Appraisal Ford Land Development European Database, Manufacturing Engineering Study Ford Internal Maintenance studies Equipment
8、Manufacturers,Equipment and Tooling,Building,Activity Based Costing LABOR Labor Summary:,Labor Group,Direct Labor12.56 13.95 15.35 Indirect Labor 6.91 7.67 8.44 Fringe Benefit 9.93 11.03 12.13 MRO Labor .96 .96 .96,General Manufacturing,AA,AB,AC,Total Labor Rate/hour 30.36 33.61 36.88,(50% of dir. +
9、 Ind. Labor),(55% of direct Labor),(MRO Labor remains constant because it is based on Machine (1) process scrap is determined by the estimator and applied in the estimate as an allowance, (2) end-item scrap, is a minimal amount applied to finished good, to compensate for destructive testing, damage
10、in transit, etc.,ABC Activity Based Costing,BURDEN PRESENTATION ( MANUFACTURING OVERHEAD ),ABC Activity Based Costing Terminology;,“PPI” - Purchased Price Index, Bureau of Labor Statistics Lifetime Years - Expected life of equipment Opportunity Cost - Also referred to as Interest cost MRO (Maintenan
11、ce, Repair (Initial Capital Value) + (Freight Initial Capital Cost $500,000 - Cost of Machine Freight ,(Initial Investment x 50%) x (Interest amount) Annual Hours Assumption; Initial investment $100,000 Interest amount 6.1% Equipment Utilization 90% ( $100,000 x .5) x .061 = $50,000 x .061 = $3,050
12、= $.715/hr = $.011 /min 20 x 237 x 90% 4266 4266,Activity Based Costing BURDEN INSURANCE,This category represents the insurance for equipment capital only. The insurance for the building is included in the floorspace allocation. Insurance recovery cost is applied as a percent of capital. As the equi
13、pment value increases, so does the amount of insurance expense. FORMULA; (Insurance Percentage) x (Replacement Value of Equipment) Annual Hours Assumption; Capital $500,000, Freight electricity is in Kilowatts per hour, compressed air is in cubic meters, etc. Utility cost per unit is not based on an
14、y particular region or manufacturer, it is published as a national average. This measures suppliers on a level playing field, without penalizing a suppliers competitive advantage. RESOURCES; Consumers Energy News Ford Internal Manufacturing facilities,Activity Based Costing BURDEN INDIRECT MATERIALS
15、,This category compensates the supplier for the Indirect materials, consumed by the equipment during the manufacture of products. These include; hydraulic oil, cutting oils, acetylene gas, etc. This does not include the amount stored in a tank or reservoir, but the amount exhausted during the produc
16、tion hour. Indirect material costs are applied to the burden rate, as consumed, in the appropriate units of measure, eg. kilograms, liters, cubic meters, etc RESOURCES; Manufacturers of materials Ford Internal Manufacturing facilities,Activity Based Costing BURDEN MAINTENANCE, REPAIR Equipment Manuf
17、acturers Internal Ford Manufacturing Facilities Historical Maintenance Schedules European Industrial Handbook,Equipment and Tooling,Activity Based Costing BURDEN MAINTENANCE, REPAIR Add two meters to each dimension of the equipment footprint, allowing for safety zones, isles, access between machines
18、, plus an additional 50% increment to account for stock storage, cribs, shipping and receiving, supervisory space, plant front office areas, and other ancillary space.,Building,Activity Based Costing BURDEN,Depreciation - Straight line method Lifetime of Equipment 30 years building Interest - (Oppor
19、tunity Cost) Based on Long-term investment, low risk bonds applied to capital, supporting a portion of the Suppliers (ROI) Return-on-Investment Insurance percentage applied to replacement value of equipment Utilities Operating cost; electricity, compressed air, water, etc. Indirect Materials Operating cost for consumption of; Oils (cutting, hydr, etc.), Gas (nitrogen, hydrogen, etc) MRO Burden Capital ,Activity Based Costing BURDEN,Depreciation: Replacement Value / Lifetime hours Interest: (Capital + Installation) / 2) x Interest rate) / annual hou
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026中国中医科学院广安门医院招聘国内高校应届毕业生25人(正式批)农业考试模拟试题及答案解析
- 企业信息流管理优化方案
- 2026河南省农业科学院招聘高层次人才91人备考题库及答案详解1套
- 2026黑龙江绥化青冈县人民医院、中医医院招聘48人备考题库含答案详解(新)
- 2026黑龙江黑河市金运新碳材料科技有限公司招聘工作人员3人备考题库含答案详解(模拟题)
- 2026浙江温州市平阳县国渠人力资源服务有限公司招聘编外人员劳务派遣1人备考题库含答案详解(新)
- 2026河北承德二甲医院招聘20人备考题库及完整答案详解1套
- 公司绩效管理软件选择方案
- 企业技术研发与管理方案
- 2026广东江门市台山市公益性岗位招聘3人备考题库附答案详解(考试直接用)
- 【外科学9版】第38章 肝疾病
- 2025年高职信息安全管理(信息安全应用)试题及答案
- DB31∕T 1598-2025 城市轨道交通车辆寿命评估通 用要求
- 离岸外包协议书范本
- (2026年)一例慢性肾脏病伴顽固性高血压患者的护理查房课件
- 网络名誉侵权论文
- 2025-2031年中国公网对讲(PoC)行业市场竞争现状及投资潜力研判报告
- 《化工企业可燃液体常压储罐区安全管理规范》解读课件
- 2025年生物东莞中考试题及答案
- 护理查对制度临床常见错误案例与改进措施
- 【《转K6转向架摇枕三维建模分析案例》1700字】
评论
0/150
提交评论