全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
Quality Assurance Agreement with Production Material SuppliersAdvanced Product Quality Planning1 PurposeIn order to develop and produce a new product that meets the customers quality requirements, systematic advanced quality planning is required. The Advanced Product Quality Planning procedure (APQP) accompanies the development of a product and is intended to ensure that the supplier meets all of the customers requirements on time. 2 ResponsibilityThe supplier is fully responsible for the timely planning, execution and documentation of all activities carried out within the framework of Advanced Product Quality Planning (APQP). He specifies persons in his organization who are responsible for the individual activities and stipulates the corresponding deadlines. On the customers side, the technical departments (depending on their area of responsibility) or designated project supervisors are responsible for cooperation with the supplier. In order that development activities can be carried out, it is necessary to define the targets for the project and the communication channels between the parties involved (customer, supplier and subcontractors). To ensure continuous monitoring of the project and adherence to the deadlines specified by the customer, the supplier must set milestones at which the defined activities must be completed. 3 Project classification and requirementsThe demands on Advanced Product Quality Planning are divided up into three different project classifications (PE) by the customer, based on the risk involved:Standard requirement Simplified project work (e. g. time scheduling) Project discussion(s) where required Sampling Process review/process audit on site, where requiredMedium requirement Project work in acc. with APQP method APQP Status Reports Project discussion(s), where required Sampling Process review/process audit on site, where requiredMaximum requirement Project work in acc. with APQP method APQP Status Reports (increased number) Project Review(s) Sampling Process review/process audit on-sitePE 3Standard productPE 2Medium riskPE 1Increased riskThe supplier is informed of the project classification when the order is issued, at the latest. The customer may change the project classification during the course of the project as a result of unforeseen circumstances. Should any requirements change during the course of the project, all affected documents, e. g. Control Plan, FMEA, process flow diagram etc., must be changed accordingly. 3.1 Project classification PE 1 Increased riskThe supplier reports to the designated customer contact on his own responsibility using the APQP Status Report (see QAA Part 1, Appendix 3): No later than four weeks after order confirmation At initial mass production sampling In good time in the event of problems (APQP status of an element is yellow“ or red“) On additional dates which have been agreed between customer and supplier on an individual basis within the framework of the project work.The customer checks the progress of the project during project reviews held at either the suppliers premises or the customers premises. Documents such as the Control Plan, FMEA, process flow chart etc. must be submitted as evidence. The customer releases the mass production process after carrying out a process review/audit at the suppliers premises and, where necessary, at the subcontractors premises. The date and scope of the on-site inspection are agreed between supplier and customer within the framework of the APQP. 3.2 Project classification PE 2 Medium riskThe supplier reports to the designated customer contact on his own responsibility using the APQP Status Report (see QAA Part 1, Appendix 3): No later than four weeks after order confirmation At initial mass production sampling In good time in the event of problems (APQP status of an element is yellow“ or red“)The customer can check the progress of the project during project reviews held at either the suppliers premises or the customers premises. Documents such as the Control Plan, FMEA etc. must be submitted as evidence. The customer can release the mass production process after carrying out a process review/audit at the suppliers premises and, where necessary, at the subcontractors premises. The date and scope of the on-site inspection are agreed between supplier and customer within the framework of the APQP.3.3 Project classification PE 3 Standard productThe supplier reports to the designated customer contact on an informal basis (without the use of the APQP Status Report): In good time in the event of problemsThe customer can check the progress of the project during project discussions held at either the suppliers premises or the customers premises. Documents such as the Control Plan, FMEA etc. must be submitted as evidence.4 Monitoring project progressThe supplier must monitor the progress of the project independently and report to the customer on the basis of the project classification. In order to plan the project and monitor dates, the target dates for the individual APQP elements must be entered in the APQP Status Report at the start of the project. The actual dates are entered to document the completion of the elements. If the date or individual elements are at risk of not being fulfilled, the supplier must introduce suitable corrective measures and monitor these on his own responsibility. A further course of action must be agreed jointly with the customer. The status of the individual elements must be indicated in the APQP Status Report using the following colour codes: StatusMeaningGreen Date / quality of the element are not at risk Start of production is not at riskYellow Date / quality of the element are at risk Start of production is not at risk Appropriate corrective measures and responsible persons must be definedRed Date / quality of the element will not be observed Start of production is at risk Appropriate corrective measures and responsible persons must be defined and agreed with the customer5 Product development processThe product development process (PEP) consists of consecutive phases that are separated by milestones. The current status of the project is reviewed when a milestone is reached. Additional activities must then be defined where necessary. The procedure proposed by the customer is shown in Appendix 1 and represents the foundation for handling the project on a joint and structure
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026年串通投标行为认定试题(附答案)
- -学年吉林省吉林市永吉县教科版三年级上册期末考试科学试卷原卷版2
- 江苏建筑二建考试试题及答案
- 跨栏 教学设计-2025-2026学年高一上学期体育与健康人教版必修第一册
- 鸡兔同笼(教学设计)四年级下册数学人教版
- 九年级化学下册 第八单元 课题1 金属材料教学设计 新人教版
- NOIP普及组初赛常见试题及参考答案
- 叉车考试试题及答案总共多少题
- 六年级品德与社会下册 第四单元 再见我的小学生活 2 临别感言教学设计1 新人教版
- 工厂领班考试题目及答案
- 2026年电梯安全管理员A证真题(附答案)
- 城镇污水处理厂建设工程监理规划
- 2026上海交通大学医学院附属瑞金医院医疗、其他岗位招聘模拟试卷【各地真题】附答案详解
- 2026年秋新教材九年级道德与法治上册新课标必背知识点
- 2026二建法规真题解析及答案
- 粤港澳大湾区国际科技创新中心建设规划
- 《中医》考试题库-2026年山东医师定期考核
- 载抗生素骨水泥治疗骨折相关感染规范化应用循证指南总结2026
- 2026年《综合基础知识》试题及一套参考答案详解
- 《习作 传承好家风》教案(2课时)-2026-2027学年统编版(新版)小学语文六年级上册
- 2026年湖北省路桥工程专业技术职务水平能力测试(公路工程副高级)练习题及答案
评论
0/150
提交评论