全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
CONSTRUCTION PROJECT SCHEDULECONSTRUCTION PROJECT SCHEDULEFOR VDH-OFFICE OF DRINKING WATER FINANCIAL AND CONSTRUCTION ASSISTANCE PROGRAMS (FCAP)Project Name: _VDH Project Number:_Prepared By: _Date: _RESPONSIBLESTART DATECOMPLETION DATEACTIONPARTYPLANNEDACTUALPLANNEDACTUALNote: Responsible Party is the person or firm to whom the task is assigned.This schedule includes key steps required to bring a projectto Loan Closing. Several steps can be performed concurrently to expedite the overall process. Examples arethe Environmental Review and Waterworks Business Operations Plan.FUNDING APPLICATION & PROJECT MANAGEMENT1.Obtain Governing Body approval for project. 2.Prepare and submit Application for Construction Fundsand Construction Project Schedule.3.Designate local contact person responsible for project management; i.e., Recipients Project Manager.4.Attend Initial Meeting with VDH-FCAP staff.5.If extended, accept VDH-FCAP initial offer of project funding terms.ENGINEERING6a.Prepare Request For Proposal (RFP) for engineering services.6b.Advertise for proposals.6c.Evaluate proposals and conduct negotiations.6d.Award contract to top ranked offeror.6e.Sign contract.6f.Submit engineer procurement information to VDH-FCAPProject Officer for approval.7.Submit Permit Application Notification of Intent toVDH-ODW Field Office.8.Attend Preliminary Engineering Conference at VDH-ODWField Office.9a.Preliminary Engineering Report (PER) -Start Preparation.9b.Submit PER to VDH-ODW Field Office for approval andforward a copy to VDH-FCAP Project Engineer.(Comments or approval is normally given to applicant byVDH-ODW Field Office within 45 days of receipt. If the VDH-ODW Field Office returns comments, the ProjectSchedule may need to be adjusted.)9c.VDH-ODW Field Office approval of PERVDH-ODW FO10a.Prepare Plans and Specifications (P & S).10b.Submit P & S to VDH-ODW Field Office for approval andforward a copy to VDH-FCAP Project Engineer.(Comments or approval is normally given to applicant byVDH-ODW Field Office within 60 days of receipt. If theVDH-ODW Field Office returns comments, the Project Schedule may need to be adjusted.)10c.VDH-ODW Field Office approval of P & S.VDH-ODW FOApproved By: _Date _Page 1 of 4Waterworks Project Manager1-12-09CONSTRUCTION PROJECT SCHEDULEFOR VDH-OFFICE OF DRINKING WATERFINANCIAL AND CONSTRUCTION ASSISTANCE PROGRAMS (FCAP) Project Name: _VDH Project Number:_Prepared By: _Date: _RESPONSIBLESTART DATECOMPLETION DATEACTIONPARTYPLANNEDACTUALPLANNEDACTUALENVIRONMENTAL REVIEWSection 7 of the Procedural Guidelines (PG) for Virginia Water Supply Revolving Fund Recipients describes theRequired procedures. A Categorical Exclusion (CE) normally takes 60-90 days and an Environmental Assessment (EA) normally takes 90-120 days. An Environmental Impact Statement (EIS) is not included in the steps below as it is rarely required. 11.Review PG #7 and determine type of review applicable forproject. Discuss basis with VDH-FCAP Project Engineer.12a.If a CE appears to be appropriate, forward a request for aCE to the VDH-FCAP Project Engineer. Include required supporting documentation.12b.Coordinate the VDH-FCAP Project Engineers site visit. 12c.VDH-FCAP Project Engineer sends comments. VDH-FCAP12d.Respond to the VDH-FCAP Project Engineers comments.12e.If VDH-FCAP concurs with a CE, publish the Public Notice provided by VDH-FCAP and allow for a 30 day comment period. Ensure a copy of the completed Public Notice Verification Sheet is provided to VDH-FCAP Project Engineer. Perform procedures in accordancewith instructions provided by VDH-FCAP Project Supervisor.12f.If there are no significant adverse comments, the VDH-VDH-FCAPFCAP Division Director issues letter stating the environmental review requirement has been satisfied.13a.If an EA is required, develop EA in accordance with PG #7. 13b.Forward a written request transmittal to all appropriate review agencies, and allow for a 30 day review and comment period.13c.Coordinate the VDH-FCAP Project Engineers site visit. 13d.Prepare EA after review agencies written responses are received. EAmust satisfactorily resolve any review agency comments.13e.Publish a Public Notice of public hearing at least 30 daysprior to the date of the public hearing in accordance withPG #7. Ensure a copy of the completed Public Notice Verification Sheet is provided to the VDH-FCAP Project Engineer. Thepublic hearing is held after the EA is completed.13f.Provide two copies of the following information to VDH-FCAP ProjectEngineer. -Copies of the review request transmittal letters to the review agencies. -Copies of review agency comments. -Response(s), as necessary, to the review agency comments. -A summary or record of the public hearing along with the verification of public notice for the hearing (if not previously provided by the newspaper). -EA or Revised EA (as appropriate).Approved By: _Date _Page 2 of 4 Waterworks Project Manager1-12-09CONSTRUCTION PROJECT SCHEDULEFOR VDH-OFFICE OF DRINKING WATERFINANCIAL AND CONSTRUCTION ASSISTANCE PROGRAMS (FCAP) Project Name: _VDH Project Number:_Prepared By: _Date: _RESPONSIBLESTART DATECOMPLETION DATEACTIONPARTYPLANNEDACTUALPLANNEDACTUAL13g.If USDA-Rural Development is a funding participant on the project, alsosend two copies of all items in 13f to them.13h.VDH-FCAP Project Engineer sends comments.VDH-FCAP13i.Respond to the VDH FCAP Project Engineers comments.13j.If all comments are satisfactorily addressed, the VDH-FCAP Project Supervisor forwards a copy of the Finding of NoSignificant Impact (FONSI) Public Notice, a Public Notice Verification Sheet, an example transmittal letter, andinstructions. Publish the Public Notice and allow for a 30day comment period. Ensure a copy of the completed PublicNotice Sheet is provided to the VDH-FCAP Project Engineer.13k.If no significant adverse comments are received from theVDH-FCAPpublic, the VDH-FCAP Division Director issues clearance letter completing the environmental review.WATERWORKS BUSINESS OPEATIONS PLAN (WBOP)If required, coordinate process with the VDH-ODW Field Office.14a.Prepare WBOP. Allow 120 days for preparation and approval.14b.Submit WBOP to VDH-ODW Field Office for approval. 14c.Forward copy of WBOP to VDH-FCAP Project Officer.14d.VDH-ODW Field Office approval of WBOP.VDH ODW FOOTHER REQUIREMENTS15.For Parity issues prepare and submit required information toVRA and other lenders 120 days prior to closing. Keep the VDH-FCAP Project Engineer informed of your progress. 16.Obtain ownership to any land needed for the constructionof the project. Immediately inform the VDH-FCAP ProjectEngineer of any complications which will delay the project.17.Obtain easements for land needed for construction of theproject. Immediately inform the VDH-FCAP Project Engineer of any complications which will delay the project.18.Obtain funding approval from other lender if project is being co-funded. Forward copy of funding approval or denialto the VDH-FCAP Division Director.19a.Submit draft Water Users Agreement to VDH-FCAP Project Officer for approval.19b.Submit a signed Water Users Agreement and Certificationto VDH-FCAP Project Officer for approval. Forward a copy of Certification to Virginia Resources Authority (VRA).20a.Respond to VRAs request for information needed for theircompletion of the Credit Summary.20b.VRA completion of Credit Summary.VRA21.VDH State Health Commissioner authorizes final funding terms and issuance of loan commitment letters.VDHApproved By: _Date _Page 3 of 4Waterworks Project Manager1-12-09CONSTRUCTION PROJECT SCHEDULEFOR VDH-OFFICE OF DRINKING WATERFINANCIAL AND CONSTRUCTION ASSISTANCE PROGRAMS (FCAP)Project Name: _VDH Project Number:_Prepared By: _Date: _RESPONSIBLESTART DATECOMPLETION DATEACTIONPARTYPLANNEDACTUALPLANNEDACTUAL22a.VRA forwards Commitment Letter and initial draft of theVRAFinancing Agreement and Grant Agreement (if applicable).22b.Execute and return Commitment Letter provided by VRA.CONSTRUCTION BID23a.Prepare draft Construction Bid documents to include required VDH contract inserts, and bid advertisement.23b.Submit draft Construction Bid documents and bid advertisement to VDH-FCAP Project Engineer forconcurrence prior to bid advertisement.23c.VDH-FCAP approval of Bid documents.VDH-FCAP23d.Inform VDH-FCAP Project Officer and VRA of readinessto proceed with loan closing.23e.Advertise for bids - (close loan 6 weeks later).23f.Tabulate bids.23g.Obtain MBE/WBE solicitation information from selectedcontractor prior to contract award.23h.Forward bid tabulation and other required d
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年中职(生物制药技术)生物药物制备综合测试题及答案
- 2025年大学审计学(审计案例分析)试题及答案
- 2025年大学二年级(飞行器制造工程)飞行器制造工艺试题及答案
- 2025年中职审计学(财务审计)试题及答案
- 2025年大学二年级(社会工作)老年社会工作试题及答案
- 2025年大学生物学(生态学专题)试题及答案
- 初三化学(化学计算)2026年下学期期末测试卷
- 2025年高职第一学年(空中乘务)客舱服务礼仪基础试题
- 2025年大学护理学(传染病预防)试题及答案
- 2025年高职装配式建筑构件生产(模具操作)试题及答案
- 2026年中国数联物流备考题库有限公司招聘备考题库及参考答案详解一套
- 四川省乐山市2026届高一上数学期末质量检测试题含解析
- 2025年天津中德应用技术大学马克思主义基本原理概论期末考试真题汇编
- 2025青海省交通控股集团有限公司面向社会公开招聘70人笔试历年参考题库附带答案详解
- 韩语兴趣爱好课件
- 青霉素过敏性休克处理
- 70周岁换证三力测试题,老人驾考模拟测试题
- 工地清场协议书
- 2026年包头轻工职业技术学院单招职业适应性测试题库附答案详解
- 2026年及未来5年市场数据中国内贸集装箱行业全景评估及投资规划建议报告
- 2025贵州盐业(集团)有限责任公司贵阳分公司招聘笔试考试备考题库及答案解析
评论
0/150
提交评论