版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、LBT PROJECTTECHNICAL SPECIFICATIONROTATING SUPPORTING ARMSWITH THE FABRIC RETRACTABLE COVEROF THE PRIMARY MIRRORS1SUPPLY DESCRIPTION.41.1Rotating Arm with Driving system41.2Retractable Fabric Cover41.3Supplying consistence52AMBIENT WORKING CONDITIONS53TECHNICAL DATA AND DRAWINGS63.1Rotating Arm See
2、dwg. 727a00863.2Retractable cover See dwg. 727a00963.3Electric cabinets and control64LIST OF DRAWINGS84.1List of assembly drawings84.2List of subassembly drawings85SUPPLY RULES.105.1Planning105.2Procedure105.3Surface protection and painting105.4106ACCEPTANCE TESTS11INTRODUCTIONThe dust and any type
3、of dirty depositing on the Primary Mirror surface, are cause of dangerous loss of efficiency of the Telescope, so much to suggest, also if with a increase of cost and complication, to include in the design an effective cover protection for the M1.The present specification concerns the two covers for
4、 the primary mirrors of the telescope, one for the right side and the other for the left one. Each of them has a main rotating arm to get it in position and a deployable umbrella (cover) driven by different control. As can be understood from the enclosed drawings, each unit is described as two separ
5、ate components. In fact, the rotating arm with its drive system presents construction problems quite different from the retractable fabric cover with its guiding and driving system. The contract for the entire supply will be given to a single Company.The principle and the construction technology of
6、the fabric retractable cover has been proved and positively tested during 1995 by the Arcetri Observatory on a 2 m diameter scaled prototype.The dimensions reported in the related drawings must be strictly respected because of the interfacing telescope structures and the optical obstructions. On the
7、 other hand, the construction details for the cover and its guiding system are subject to alternative proposals according to the experience and suggestions coming from the Manufacturers.1 SUPPLY DESCRIPTION.1.1 Rotating Arm with Driving systemThis first subassembly of the M1 Cover consists in a fixe
8、d cylindrical mast to be bolted on the EL structure, supporting both the bearing and the screw jack for the 90 degree rotation of the swing arm - see dwg.727a009 and 727a008.Although on the dwg 727a011 also the driving unit and the chain for opening and closing the cover are represented, we include
9、in the mechanical supply description only the machined circular sector supporting the closed bellow, while all the details described in the introduction are included in the cover item.The two arms hinged in the center having the function of mobile anchoring of the bellows and support of the driving
10、unit for opening and closing it, are part of the retractable cover item as well.An important interface is on the EL main structure, consisting in the supply of a template complete of the borings for the fixation of the cylindrical column represented on the dwg. 727a013. 1.2 Retractable Fabric CoverT
11、o complete the M1 Cover unit - see the assembly dwg. 727a007 - has to be added what we have called “fabric cover”, such item includes a large series of mechanical details, starting from the chain to be fixed around the external cell wall and the two driving units with the relevant supporting arm hin
12、ged at the center pin. The cover itself is foreseen being made of a series of stainless steel thin blades connected each other with hinges all along their length. The first and the last blade are connected to the fixed and driving structures; particular attention must be devoted to the details of su
13、pporting and guiding the cover blades around the M1 cell upper flange, to the blades themselves supporting the horizontal and front fabric connections. As far as the supports and connections around the center pin are concerned, a sufficient number of hinges connect to a bush rotating around the cent
14、er pin itself. Such design reported in the enclosed drawings can be revised also according to the Manufacturer experience, considering that we have represented the results of the first 2m diameter test bench implementation.1.3 Supplying consistenceMore in detail, the supply consists purchasing all t
15、he commercial components being part of the rotation mechanisms, the motors and the limit switches; also the final cabling and the electrical control units are part of the supply. The necessary equipment for the acceptance tests shall be provided by the supplier too.Every rotating M1 Cover shall be f
16、ully preassembled including the rotation mechanisms and located for the acceptance functional tests in horizontal position (telescope zenith pointing) and at different elevation angles toward the vertical position.2 AMBIENT WORKING CONDITIONSThe M1 Covers are required to grant the performance in the
17、 following environment conditions:- Operating temperature- 20÷ + 25 °C- Operating pressure500÷ 600 Torr- Operating humidity5÷ 95 %- Storage temperature- 30÷ + 50 °C- Storage pressure500÷ 700 Torr- Storage humidity5÷ 80 %- Lifetime of the Telescopeexceed 25 yea
18、rs3 TECHNICAL DATA AND DRAWINGS3.1 Rotating Arm See dwg. 727a008· Max. speed of the nut on the screw0,45 m/min· Displacement of the nut for 90º arm rotation0,6 m· Time demanded for positioning the armmax 2 min· Driving motor for each of the two sectors of the bellow:4 KW / 4
19、 poles with disk brake 480V/60Hz· Screw Jack UNIMEC TYPE TPRC 559 1 / 30 with screw and nut on re-circulating balls and elastic protection of the screw.o Estimated weight of the fixed mast supporting the driving Jack» 293 kg o Including the mechanical details» 400 kgo Estimated weight
20、 of the rotating arm supporting the bellow· with the auxiliary structure» 710 kgo Estimated weight of the cantilever arm supporting the driving arms of the bellow 540 kg3.2 Retractable cover See dwg. 727a009· Driving units:o N° 2 Motors WACO RS 500 BT 2 Nm Cont. torque, with brak
21、e and tachogeneratoro N° 2 Gearbox PLC120 GSC - Ratio 1:120o N° 2 Chains sprockets 13 teeth for chain 1 inch pitch o Chain fixed around the cell on a Æ 9400 » -1 “ pitch o Driving sprocket velocity 2500 / 120 = 20,8 rpm o Time requested for opening / closing the cover » 2.5
22、· Material used for the 2m cover test Kevlar Preox 270 g/m2- Produced by the French Company DICKSON PTL -3.3 Electric cabinets and controlAccording to the main data of the motors listed above and the limit switches logic, it is required a simple analog command control for moving the Rotating Ar
23、m and the Retractable Cover. In details well have:· direct power supplying for the motors according to the required voltage,· safety devices for the motors (over current, thermal switches),· one push button command, for each direction, moving the rotating arm to the requested position
24、 (working position / resting position),· one push button command, for each direction, moving the retractable cover for each direction (open / close),· both positions of the two arms will be monitored by on/off lights,· the limit switches control the power to the motors and the lights
25、status. 4 LIST OF DRAWINGS4.1 List of assembly drawingsDwg. 727a007- M1 cover - General assemblyDwg. 727a008- M1 cover Rotating arm with driving systemDwg. 727a009- M1 cover Arms cover with guiding and driving systemDwg. 727a011- M1 cover Retractable fabric cover with center anchoring4.2 List of sub
26、assembly drawingsDwg. 727a012- Drive unit assemblyDwg. 727a013- Fixed cylindrical columnDwg. 727a014- Screw jack supportDwg. 727a015- Rotating boxDwg. 727a016- Sector for chain jointDwg. 727a017- Rotating armDwg. 727a018- Circular sectorDwg. 727a019- SpacerDwg. 727a020- AdjustmentDwg. 727a021- Cross
27、 beamDwg. 727a022- Bearing supportDwg. 727a023- Bearing cupDwg. 727a024- Cross beamDwg. 727a025- PinDwg. 727a026- WasherDwg. 727a027- Bearing supportDwg. 727a028- Screw jack UNIMEC TPR559Dwg. 727a029- SectorDwg. 727a030- Fixed sectorDwg. 727a031- Drugging sectorDwg. 727a032- Anchoring plateDwg. 727a
28、033- Upper anchoring sectorDwg. 727a034- Lower anchoring sectorDwg. 727a035- Spacer tubeDwg. 727a036- Screw M8x45Dwg. 727a037- SpacerDwg. 727a038- HingeDwg. 727a039- Anchoring tube assemblyDwg. 727a040- Anchoring tubeDwg. 727a041- Anchoring tubeDwg. 727a042- Joint M8 right threadDwg. 727a043- Joint
29、M8 R/L threadDwg. 727a044- Bronze ringDwg. 727a045- Anchoring tie assemblyDwg. 727a046- Special nutDwg. 727a047- Special washerDwg. 727a048- ArmsDwg. 727a049- Support for drive unitDwg. 727a050- Chain supportDwg. 727a051- Protection coverDwg. 727a052- Bushing self lockingDwg. 727a053- SpacersDwg. 72
30、7a054- Roller chain supportDwg. 727a055- Safety washerDwg. 727a056- PinDwg. 727a057- Washer Dwg. 727a058- Bushing self lockingDwg. 727a059- PinDwg. 727a060- Tie rodDwg. 727a061- WasherDwg. 727a062- WasherDwg. 727a063- Coupling flangeDwg. 727a064- CouplingDwg. 727a065- ShaftDwg. 727a066- Bearing supp
31、ortDwg. 727a067- Bearing coverDwg. 727a068- SpacersDwg. 727a069- SpacersDwg. 727a070- Chain jointDwg. 727a071- SprocketDwg. 727a072- Simplex chain5 SUPPLY RULES.The construction of the M1 cover must comply the following rules:5.1 PlanningThe Manufacturer shall submit to the P.O. a detailed planning
32、of construction, pointing out the intermediate tests and verifications foreseen by its Quality Control Service.5.2 ProcedurePreparation of all procedures and methods to execute the critical operations of the manufacturing.5.3 Surface protection and paintingAfter the stress release heat treatment and
33、 sand blasting SA 2.5, all the M1 cover structure, must be protected with Primer (160 m thickness), before machining.The painting after machining must be epoxy type (70 m thickness) for all the structure, except for the machined surfaces that must be protected with weather resistant grease and excep
34、t for the stainless steel.5.4Both the units named “Mirror Cover Right” and “Mirror Cover Left” must be delivered, after the final acceptance tests, to the Large Binocular site according to the Request for Proposal document.The Supply is asked just to assist the package team storing the items into th
35、e containers or into boxes (TBD). The Packing and Shipment activity is not part of the present supply, the LBTC will take care directly of that.6 ACCEPTANCE TESTSGiven the particular characteristics of these two assemblies the rotating arm anchored to the ground with its driving Jack and the ±
36、90° limit switches has to be tested and accepted first.Then, the complete unit has to be tested as well, in horizontal and vertical position, completely assembled and with the Retractable Cover supported by a dummy of the M1 cell outside flange see dwg 727a005.Here we underline again that the conceptual solutions fo
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- T/CSTEA 00010-2020九龙大白茶 白茶
- T/ZFIDA 0002-2024面向网络攻击的银行安全能力评估指南
- T/HEESA 0002-2025电力信息系统网络安全等级保护测评报告评审指南
- T/CIECCPA 020-2024二氧化碳捕集、运输与封存工艺技术规范
- T/CAPS 024-2025无人机电池性能检测设备技术要求
- T/CSBM 0050.3-2024创面修复材料有效性评价 第3部分:刺激因子屏蔽评价方法
- 2025~2026学年辽宁大连市沙河口区北师大版五年级上册数学阶段学情自测卷【附答案】
- 2025~2026学年广东省广州市从化区人教版六年级上册自主练习二数学试卷【附答案】
- 2025-2026学年湖南省张家界市初中历史八年级期末下册评估压轴试题(详细参考解析)
- PHP+HTML高频面试题及详细答案(真实职场版)
- 2026年继续教育公需课考试试题及答案
- 2026年浙江省嘉兴市国家职业技能鉴定考评员试卷含参考答案
- 骆驼基因组解析:探索其癌症相关基因的奥秘与启示
- 2026-2030中国咖啡生豆行业竞争格局及消费趋势预测报告
- 2026年江西中考物理试题【含答案解析】
- 医疗美容行业介绍
- (完整版)冬季施工专项施工方案
- 2024年全国职业院校技能大赛高职组(检验检疫技术赛项)考试题库(含答案)
- 生态环境综合治理项目验收资料样本
- 社区口腔健康促进的多学科协作策略
- 液化气送气工培训课件
评论
0/150
提交评论