




版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、GENERAL SERVICE 1 G-001 Vessel docking/undocking time(s) 2 G-002 Charge for the first two days in dry-dock, G-003 Charge for the rest days in dry-dock, G-004 Surcharge for docking/undocking - outside normal working hours, - weekend and/or - public holidays, days, G-005 Surcharge for docking vessel i
2、n a partly loaded condition - carrying ton(s) of cargo, - fitting/removal of additional piece(s) of side blocks, - fitting/removal of additional piece(s) of keel blocks, G-006 Towage (dock yard moves) Provide for vessel arrival and sailing, Required tugs , G-007 Pilotage Provide for vessel arrival a
3、nd sailing G-008 Riggers Provide to handle mooring lines and gangway on arrival, shifting and sailing. G-009 Wharfage G-010 Shifting Vessel to be shifted from dry-dock to repair quay without “Engine” with assistance of tugs, pilots and line handlers. G-011 Electric shore power supply, 440V, 60Hz, Te
4、mporary connection/disconnection, G-012 Electric shore power supply, 440V, 60Hz, during repair period, G-013 Fresh water from shore, temporary connection/disconnection G-014 Fresh water supply from shore, G-015 Seawater (ballast) from shore, temporary connection/disconnection, G-016 Seawater ballast
5、 supply from shore, G-017 Cooling-water (seawater) from shore for refrigeration systems. Temporary connection / disconnection, G-018 Cooling water (seawater) supply, G-019 Fire line Temporary connection/disconnection, G-020 Fire line Maintenance and hire, G-021 Fire watch, additional, if required, R
6、emark: Fire watchman attendance for specified repairs has been included, in relevant repair items. G-022 Garbage Remove garbage and galley refuse, G-023 Shore crane hire for vessels domestic use, G-024 Provide, supply temporary telephone on board G-025 Slops (or Sludge) Disposal of sludge to recepti
7、on facilities ashore, G-026 Cherry-picker Provide cherry-picker in holds for general inspection, DOCKING WORK Underwater M2 Boot topping M2 Topside M2 Remarks: The rates must include the use of dock arms, aerial platforms, cherry picker, fitting of scupper plugs, temporary lighting, temporary protec
8、ting of anodes, echo sounder and speed log. F/C applications on underwater and topside area incl. Repainting of - draft marks - ships name bow / stern - port of registry - plimsoll marks - bow / bow thruster marks - owners letter “COSCO” on side if there exists - bay numbers - paint, owners supply D
9、-010 Surface Preparation D-010-1 Provide piece(s) of temporary plugging of scuppers D-010-2 Provide temporary protection of anodes, echo sounder and log transmitters. D-010-3 Provide disposal of empty paint bins. Freshwater washing, to remove dirt and contamination D-010-4 -underwater area, M2 were
10、done, D-010-5 -boot topping area, M2 were done, D-010-6 -topside area, M2 were done, High pressure freshwater washing, Minimum _Mpa D-010-7 - underwater area, M2 were done, D-010-8 -boot topping area, M2 were done, D-010-9 - topside area, M2 were done, D-010-10 Provide water-blasting up to _ Mpa on
11、damaged / rusty areas, M2 were done, Power tool clean, D-010-11 - underwater area, M2 were done, D-010-12 -boot topping area, M2 were done, D-010-13 - topside area, M2 were done, Hand scrape / slice to remove fouling D-010-14 - underwater area, M2 were done, D-010-15 - boot topping area, M2 were don
12、e, D-010-16 - topside area, M2 were done, Grit blast hull plating to SA 2.5 Swedish standard D-010-17 - underwater area, M2 were done, D-010-18 - boot topping area, M2 were done, D-010-19 - topsides, M2 were done, Grit blast hull plating to SA 2.0 Swedish standard D-010-20 - underwater area, M2 were
13、 done, D-010-21 - boot topping area, M2 were done, D-010-22 - topsides, M2 were done, Grit blast hull plating to SA 1.5 Swedish standard D-010-23 - underwater area, M2 were done, D-010-24 - boot topping area, M2 were done, D-010-25 - topsides, M2 were done, D-020 Hull painting-Underwater area(Please
14、 note the maker,brand and type of painting) D-020-1 1st T/U, primer, m, dft, M2 were done, D-020-2 2nd T/U, primer, m, dft, M2 were done, D-020-3 3rd F/C, primer, m, dft, M2 were done, D-020-4 One (1) F/C of A/F, m, dft, M2 were done, D-020-5 The second F/C of A/F, m, dft, M2 were done, Hull paintin
15、g-Boot topping areaD-020-6 1st T/U, primer, m, dft, M2 were done, D-020-7 2nd T/U, primer, m, dft, M2 were done, D-020-8 3rd F/C, primer, m, dft, M2 were done, D-020-9 One (1) F/C of A/F, m, dft, M2 were done, D-020-10 The second F/C of A/F, m, dft, M2 were done, Hull painting-Topsides area D-020-11
16、 1st T/U, protection primer, m, dft, M2 were done, D-020-12 2nd T/U, protection primer, m, dft, M2 were done, D-020-13 3rd F/C, protection primer, m, dft, M2 were done, D-020-14 One F/C of finish covering paint, m, dft, M2 were done, D-020-15 The second F/C of finish covering paint, m, dft, M2 were
17、done, Deck paintingD-020-16 M2 were done, F/C(or T/U) coat(s) of protection primer, F/C(or T/U) coat(s) of finish covering paint, D-020-17 Repainting of - ships name bow / stern D-020-18 - port of registry D-020-19 - owners letter “COSCO” on both sides D-020-20 - funnel and operators funnel logo inc
18、l, staging, - paint owners supply D-030 Anchor & Cables Two bow anchors : kg each Chains : port side: M,stb side: _M, dia. mm each D-030-1 Range out port and starboard anchor and anchor cables in dry-dock for survey, incl. washing down, calibrating, marking(with painting/stainless wires) and re-
19、stowing. D-030-2 Fasten studs of chain link by welding, pieces of chain link be done. D-030-3 Clean chain lockers for survey, incl. removal and disposal of mud and remaining water. D-030-4 Provide weights of anchors. D-030-5 Change the last length of P&S chain cables to the first length. D-040 A
20、nodes D-040-1 Remove worn out zinc anodes and replace / refit new zinc anodes, incl. staging, vessels supply, - Stern Frame piece(s), Size: - Bow Thruster piece(s), Size: - Rudder piece(s), Size: - Fire Emergency Sea Chest piece(s), Size: - High Suction Sea Chest piece(s), Size: - Low Suction Sea Ch
21、est piece(s), Size: - Water Outlet Tunnel piece(s), Size: - Others piece(s), Size: Total weight of anodes approx. kg. D-050 Sea Chest, Sea Valves, Main Cross Over Line, Overboard Discharge And Storm Valves Note: Sea Chests : remove grids, clean, paint and close, incl. staging. Sea Valves : Open up i
22、n situ, clean grind-in and close with new packings, vessels / yards supply. Strainer : Open up, clean and close. Main Cross Over : Clean, remove remaining water and mud. Butterfly Valves : Check and clean in situ, grease drive and drive gear. Storm Valves : Open up in situ, clean, renew rubber linin
23、g with owner / yards supply on flaps and close. Logogram : Globe Valve - GV Gate Valve - GT Butterfly Valve - BV Storm Valve - SV D-050-1 Sea gratings / Discharge chest Open up, clean and paint recesses / gratings with owners A/F paint and close up on completion. D-050-2 Emergency Fire Pump Sb., Fra
24、me D-050-3 Upper Sea chest Sb., Frame D-050-4 Lower Sea chest P., Frame D-050-5 Overboard discharge, Sb., Frame D-050-6 Overboard discharge, P., Frame D-050-7 High Sea Suction Chest, Starboard No.01 Pipe Size , water suction No.02 Pipe Size , air vent. No.03 Pipe Size , air vent. No.04 Pipe Size , s
25、team to sea chest. D-050-8 Low Sea Suction Chest, Port No.01 Pipe Size , water suction No.02 Pipe Size , air vent. No.03 Pipe Size , air vent. No.04 Pipe Size , air vent. No.05 Pipe Size , steam to sea chest. D-050-9 Sea Chest Emergency Fire Pump, Sb No.01 Pipe Size , water suction No.02 Pipe Size ,
26、 air vent. No.03 Pipe Size , steam to sea chest. D-050-10 Main Ballast Line (cross over) No.01 Pipe Size , after starboard strainer No.02 Pipe Size , after port strainer No.03 Pipe Size No.04 Pipe Size , to b.w pump 1 No.05 Pipe Size , to b.w pump 2 No.06 Pipe Size No.07 Pipe Size , to fire pump bef
27、ore strainer No.08 Pipe Size , to fire pump after strainer No.09 Pipe Size , to M.E air cooler No.10 - dito No.11 Pipe Size , to f.w of A.E D-050-11 Overboard Discharge, FR N0.1 Size , cooling water SB(Type: ) N0.2 Size , cooling water SB(Type: ) N0.3 Size , ballast water SB(Type: ) N0.4 Size , ball
28、ast water PS(Type: ) N0.5 Size , auxiliaries PS(Type: ) N0.6 Size , bilge water separator PS(Type: ) N0.7 Size , f.w generator PS(Type: ) N0.8 Size , sewage PS(Type: ) N0.9 Size , boiler blow down SB(Type: ) N0.10 N0.11 N0.12 N0.13 N0.14 D-050-12 Emergency Valve N0.1 Size , bilge suction N0.2 N0.3 D
29、-050-13 Two (2) suction seawater strainer / size : Open up, clean housing and strainer, replace and close up, incl. Removal and disposal of mud, shells and remaining water. D-050-14 Workshop Repair of Valves Following valves to be removed from line and refitted, transport to workshop and return, ope
30、n up, clean, grind in, renew seals (in case of butterfly valves, replace with ships special spare seals), close up.No.Valve SizeName of ValvesequipmentStormValve(Y/N)GlobeValve(Y/N)Stop Valve(Y/N)ButterflyValve(Y/N)Valve underFloor(Y/N)quantity D-060 Rudder / Stearing Gear Type: (Sample) Semi-balanc
31、ed under-hung rudder with one (1) pintle. Rudder stock to be connected with rudder by hydraulic pressure. Stock dia in way of sleeve: m/m, incl. sleeve m/m Pintle dia in way of sleeve: m/m, incl. sleeve m/m D-060-1 Rudder pintle Measure rudder pintle clearance and make record, incl. staging. D-060-2
32、 Trunk Open / close piece(s) of manhole covers, clean trunk for survey. D-060-3 Rudder Stock Sealing Stock in situ Open up, clean, close up with ships spare sealing rings on completion. D-060-4 Rudder Pintle Rudder in situ Remove for survey, clean, calibrate sleeve and bush and make record, replace
33、on completion. D-060-5 Rudder Remove rudder for survey of - stock - stock sleeve / bush - pintle - pintle sleeve / bush clean, calibrate and make record, replace rudder on completion. D-070 Propeller / Propeller Shaft Propeller Blades : pieces Diameter : m/m Weight : kg Material : Al-Ni (sample) Drive fit : oil pressure coupling (sample) Intermediate Shaf
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年中国三防涂塑布市场调查研究报告
- 2025年中国TGS外销成衣管理系统市场调查研究报告
- 2025年中国DHA营养强化饵料市场调查研究报告
- 2025年上海租房合同 房东违约处理办法(已补充)
- 2025年风电场集中和远程监控系统项目建议书
- 医院感染知识课件
- 2025年特种装备电缆项目合作计划书
- 2025年特种大型铝合金型材合作协议书
- 《立体直角坐标系讲解》课件
- 2025 商业房产租赁合同
- 2025年四川省成都市青羊区中考二诊化学试题(原卷版+解析版)
- 2024年南京市建邺区平安联盟工作辅助人员招聘笔试真题
- 2025至2030中国核燃料加工行业竞争趋势及发展前景可持续报告
- 山西省部分重点中学2024-2025学年高三4月模拟检测语文试题(含答案)
- 2024年生物医学工程试题及答案
- 2025年全国防灾减灾日(5.12)应知应会知识测试竞赛题库与答案
- 六年级家长会心理教育专题课件
- 四川宜宾环球集团有限公司招聘笔试题库2025
- 如何设计高质量的课件:制作教学指南
- 2025年农村商业银行人员招聘考试笔试试题(含答案)
- 2025年江苏省新高考高三联考数学试卷试题(含答案详解)
评论
0/150
提交评论