版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、Experiment Design ProcessDetermine problemsDetermine ObjectivesPreparation for experimentDesign ExperimentConduct Experiment & Collect dataAnalyze dataInterpret resultsVerify Predicted results第1页,共21页。cementDetermine problem In conventional processes, workers apply cement on uppers or bottoms manual
2、ly. For decades, different workers apply cement with different quantity. Due to the use of brush to apply cement, the cement thickness is also related to brushas below photo. With automation project, we have opportunities to make the thickness more uniform. Since we hypothesize that uniform thicknes
3、s could make the cementing boundaries more intimate . In this way, we believe that bonding strength would be more stably passed bonding standard.第2页,共21页。Objective of experiment To find the optimal spray system setup for target thickness to meet requirements as below so as to ensure stable bonding s
4、trength.Stable average cement thickness(properly dried after oven) Ideal cement profileLowest deviation of thickness Stable bonding strength by NIKE standard第3页,共21页。-Ideal profile for cementing thicknessCurrentcementObjective of experimentcementIdealAdhesive thicknessBonding score (Kg/cm2)The best
5、range2.5/ 3 Kg/cm2第4页,共21页。NoProcessCheck pointsPhoto1Mark the measure check point on fiberglassFollow the pattern2Measure the thickness of the of each check pointFiberglass shall be pressed while measuring3Auto spray on fiberglass along a straight line4Oven curing50 , 210 sec5Cool the fiberglass fo
6、r 3 minutes6Measure the thickness of each check points Fiberglass shall be pressed while measuring-cement thickness measurement procedurePreparation for experiment第5页,共21页。Name/ Location:Otis Chen / Lasted upperA3 Project Name:Auto cementingProcess:Spray stabilityModel/ Size:NADate/ Revision:01/28/2
7、013Experiment Objective/ Goal: To test lasted upper cement thickness with different nozzle distance and tank pressureIdentify Output (Y) & Input (X): (Use Process Map, FMEA, Fish Bone Diagram, Pareto, C & E Metric, etc. to identify inputs and outputs)Nozzle distanceAutoCementingThickness avgXYCement
8、 viscosityNozzle pressureRobot speed2900 cps30 psi800 mm/sIdentify Experiment Conditions:Fixed VariablesValue(Use ANOVA, Correlation, Hypothesis Testing, etc. to identify critical Inputs and highlight in red Experiment Environmental Conditions:Temperaturehumidity25.254%VariablesValueTank pressureThi
9、ckness std Cement widthIdentify Experiment Plan:Tank pressure18Design Factor(Current setting)LowHigh36Nozzle distance (cm)24第6页,共21页。Result第7页,共21页。Data Analysis Cement WidthCement width=9.15+1.3833*nozzle distance+1.15 tank pressure +0.45*nozzle distance*tank pressureP-value Tank pressure interacti
10、on effect of 2 factors Data Analysis Cement Width第9页,共21页。Data Analysis Average cement thicknessAverage thickness=22.858-7.642*nozzle distance+3.942 tank pressureP-value 0.200第10页,共21页。Main Effect PlotSlope of Two factors are both high two factors have significant main effects on average thickness P
11、areto chartEffect on cement width:nozzle distance Tank pressure interaction effect of 2 factorsData Analysis Average cement thickness第11页,共21页。Data Analysis Cement thickness deviationCement thickness deviation=8.817-3.55*nozzle distance-1.2*tank pressure + 3.3* nozzle distance*tank pressureP-value i
12、nteraction effect of 2 factorsTank pressureData Analysis Cement thickness deviation第13页,共21页。Interpret Result:1. Significant factors for each output are listed as below 2. For average thickness, as nozzle distance increases, more atomized cement is released to the air, so the cement thickness decrea
13、ses.3. For thickness deviation, nozzle distance has higher effect. As nozzle distance increases, the deviation decreases. We believe that the nozzle air pressure would push more cement to 2 cement boundaries as the nozzle get closer to the surface. Nozzle distanceTank pressureInteraction of bothCeme
14、nt widthAverage thicknessThickness deviation : output increases as factor increase : Output decreases as factor increase第14页,共21页。Optimization:Expected cement profile -Cement width =10 mm -cement thickness =25 um -cement deviation 8 um第15页,共21页。Verify Predicted results:Conclusion:Precise pressure re
15、gulator is valid for pressure control.Its valid to dip spray gun into water to reduce the clog problem. However, the clog condition could happen as the spray gun is exposed to the air for more than 5 minutes.We could find optimal value within the low/high level of factors with good R-sq. 第16页,共21页。N
16、ame/ Location:Otis Chen / Lasted upperA3 Project Name:Auto cementingProcess:Cement bondingModel/ Size:NADate/ Revision:02/21/2013Experiment Objective/ Goal: To test lasted upper cement bonding strength for different materials with different cement thicknessIdentify Output (Y) & Input (X): (Use Proce
17、ss Map, FMEA, Fish Bone Diagram, Pareto, C & E Metric, etc. to identify inputs and outputs)materialsAutoCementing2D bondingXYCement viscosityNozzle pressureRobot speed2900 cps30 psi800 mm/sIdentify Experiment Conditions:Fixed VariablesValue(Use ANOVA, Correlation, Hypothesis Testing, etc. to identif
18、y critical Inputs and highlight in red Experiment Environmental Conditions:Temperaturehumidity25.254%VariablesValueTank pressure Identify Experiment Plan:Design Factor(Current setting)LowHighNozzle distance (cm)1060Nozzle distance 3 cmSpecimen prep. By std processes第17页,共21页。 All bonding passes exce
19、pt 1 point failed for synthetic leather due to material failure.b1Spray direction15 cm15 cm1.0 cmRBSynthetic/Leather/Suede/Meshb2b3b4b5Remarks: b1 means the bonding of 1 section in a specimen which is divided into 5 sections as belowFindings:第18页,共21页。Cement DOE experience share :Spray cement profil
20、e (width, avg thickness, thickness dev.) would vary due to: (a) cement viscosity air temperature (b) cement pot life (c) clog condition (tube, filter, spray gun.) (d) cement tube spec (e) spray gun spec (f) tank pressure / nozzle pressure / spray gun distance So, it seems that its essential to have
21、check cement profile for each day or even each shift.2. Bonding strength is certainly a key indictor for cementing projects. Its hard to control all the bonding processes to be homogeneous but we could analyze to see if the bonding issue is due to cement spray issue or others.3. Gage R&R is critical
22、 to ensure measurement method to be reliable.4. Clog issue could happen at any time, please monitor spray often.5. Its important to discuss with engineers about experiment design.第19页,共21页。Future Offshore DOE deployment :Q: Whats the plan to apply DoE method to optimize the parameters in offshore factory(sometime may different from RD phase) and how to co-work with factory IE?A: (1) Auto
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年浙江省建德市高二生物下册期末考试检测卷附答案【综合卷】
- 2025年浙江省永康市高二生物下册期末考试模拟卷附答案(突破训练)
- 2026年浙江省温岭市高二生物下册期末考试检测卷带答案(轻巧夺冠)
- 2026年陕西省兴平市高二生物下册期末考试测试卷(有一套)附答案
- 2026年湖北省潜江市高二生物下册期末考试检测卷必考附答案
- 2025年江苏省泰兴市高二生物下册期末考试考试卷【重点】附答案
- 2026年辽宁省新民市高二生物下册期末考试检测卷附完整答案【历年真题】
- 2026年江苏省句容市高二生物下册期末考试测试卷及答案(网校专用)
- 2025年浙江省海宁市高二生物下册期末考试试卷含答案(基础题)
- 2025年江苏省启东市高二生物下册期末考试检测卷附完整答案(考点梳理)
- 2026山东鲁泰控股集团有限公司社会招聘38人笔试备考试题及答案详解
- 2026四川省注册会计师协会招聘4人备考题库及一套参考答案详解
- 2025~2026学年河北石家庄市新华区冀教版(三起)六年级上册期末学业质量检测英语试卷
- 2026年度湖北省部分工程高、中级职称水平能力测试(电气)综合练习题及答案
- Q∕320612 QJH001-2023 QJH热固复合聚苯乙烯泡沫保温板外墙外保温系统应用技术规程
- 2026年上海市黄浦区初三下学期三模数学试卷和答案
- 人教版小升初语文试卷及答案【完整】
- 三年级下册数学期末试卷
- 2026年全套药品批发企业培训试题及答案
- 《公务员录用体检操作手册(试行)》
- 2026年病毒性肺炎诊疗规范与实践指南
评论
0/150
提交评论