版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1编制依据..............................................................................4
1.1编制说明.......................................................................4
1.2编制依据.......................................................................4
1.3编制原则......................................................................5
2工程概况..............................................................................5
2.1工程简介......................................................................5
2.2水文地质概况.................................................................14
2.2.1工程地质概况...........................................................14
2.2.2水文地质概况...........................................................16
2.3风险工程情况................................................................16
3施工部署.............................................................................18
3.1工程难特点及针对性措施.......................................................18
3.1.1区间穿越深厚杂填土区...................................................18
3.1.2区间结构下穿或临近管线或建构筑物.......................................19
3.1.3区间隧道马头门破除.....................................................20
3.2施工总体目标.................................................................21
3.3施工部署及进度计划...........................................................22
3.4施工现场平面布置.............................................................24
3.5资源投入计划.................................................................25
3.5.1机械设备投入计划.......................................................25
3.5.2测量人员及仪器投入计划................................................26
3.5.3劳动力投入计划.........................................................27
4施工方法及工艺要求..................................................................28
4.1区间暗挖总体施工方案.........................................................28
4.2降、排水施工方案.............................................................30
4.3区间供电、供水、通风、通讯方案..............................................30
4.3.1供电和照明...............................................................30
4.3.2通风.....................................................................30
4.3.3供水.....................................................................32
4.3.4施工通讯................................................................32
4.4测量方案......................................................................32
4.4.1控制测量依据及主要仪器..................................................32
4.4.2测量程序................................................................33
4.4.3隧道施工测量.............................................................35
4.4.4隧道贯通误差测量........................................................35
4.4.5成果的检查与检测........................................................36
4.5马头门施工方案............................................................36
4.5.1自横通道进区间马头门施工方案...........................................36
4.5.2自明挖结构进区间马头门施工方案.........................................41
4.6区间隧道施工方案..............................................................43
4.6.1施工原则...............................................................43
4.6.2区间隧道施工工艺.......................................................43
4.6.2.1台阶法区间隧道施工工艺............................................43
4.6.2.2CD法区间隧道施工工艺.............................................45
4.6.3区间隧道初期支护施工方案................................................47
4.6.3.1超前小导管注浆加固地层...........................................47
4.63.2土方开挖施工......................................................49
463.3格栅钢架加工、安装及锁脚锚杆的施工...............................51
4.63.4喷射混凝土施工....................................................55
4.63.5掌子面封闭........................................................57
4.63.6初衬背后注浆施工..................................................58
463.7区间隧道开挖出硝...................................................58
5施工监测方案........................................................................61
5.1监测目的及意义................................................................61
5.2监测对象及项目................................................................61
5.3监测点的布设方法与保护要求....................................................62
5.3.1测点布置要求、精度要求..................................................62
5.3.2监测点的保护措施.........................................................62
5.4主要监测项目实施方法..........................................................63
5.4.1地层、洞内外及支护情况观察..............................................63
5.4.2沉降监测................................................................63
5.4.3拱顶沉降观测.............................................................64
5.4.4水平收敛观测.............................................................64
5.5监测控制标准、监测频率与预警等级管理..........................................65
5.6监测应急预案...................................................................66
5.7监测信息采集、分析和处理要求及反馈............................................67
5.7.1监测流程................................................................67
5.7.2监测数据的采集、整理....................................................67
5.7.3数据的处理与报送........................................................68
5.7.4成果反馈体系.............................................................70
5.8监测仪器设备、元器件及人员的配备..............................................71
5.8.1组织机构................................................................71
5.8.2投入人员................................................................72
5.8.3投入监测仪器.............................................................73
5.9质量管理、安全管理及其他管理制度.............................................73
5.9.1技术准备...............................................................73
5.9.2设备及物质控制.........................................................73
5.9.3监测质量控制措施.......................................................74
6主要施工管理保证措施................................................................78
6.1工程质量保证措施..............................................................78
6.1.1质量目标................................................................78
6.1.2质量保证体系............................................................78
6.1.3质量管理机构及职责......................................................79
6.1.3.1质量管理机构......................................................79
6.1.3.2质量职责..........................................................80
6.1.4施工过程质量控制........................................................82
6.1.5质量控制点保证措施......................................................84
6.1.5.1组织措施.........................................................84
6.1.5.2思想教育措施.....................................................84
6.1.5.3技术管理措施.....................................................84
6.1.5.4施工措施.........................................................85
6.1.5.5关键工序质量保证措施.............................................86
6.1.6确保质量的检测、试验手段和措施...........................................89
6.1.6.1检测、试验组织机构................................................89
6.1.6.2检测人员职责......................................................89
6.1.6.3试验和检测设备控制................................................89
6.1.6.4检验、试验........................................................90
6.2工程安全保证措施...............................................................91
6.2.1安全生产总目标及保证体系................................................91
621.1安全生产总目标.....................................................91
6.2.1.2安全生产管理体系...................................................91
6.2.1.4安全组织机构.......................................................92
6.2.1.5建立健全安全生产责任制.............................................95
6.2.2风险评估................................................................95
6.2.3安全保证措施............................................................96
6.2.3.1施工现场安全技术措施..............................................96
6.232暗挖施工开挖、初支安全技术措施....................................96
6.23.3用电安全技术措施..................................................97
6.23.4施工机械的安全控制措施............................................98
6.23.5起吊作业安全措施..................................................99
6.23.6交通安全保证措施..................................................99
6.2.4事故应急预案.............................................................99
6.2.4.1应急预案流程图....................................................99
6.2.4.2突发事件应急准备..................................................99
6.2.43抢险物质储备.....................................................101
6.2.4,4主要应急方案及处理措施...........................................101
6.2.4.5恢复生产及应急抢险总结...........................................105
6.3工程进度保证措施............................................................106
6.3.1外部协作单位组织措施...................................................106
6.3.2配备充足的施工资源.....................................................107
6.3.3强化过程控制,实行工期动态管理........................................107
6.3.4制定相应的成品保护措施,避免维修或返工浪费时间........................108
6.3.5季节性及节假日施工保证措施.............................................108
6.3.5.1夏季施工保证措施.................................................108
6.352冬季施工保证措施.................................................109
63.5.3节假日施工保证措施...............................................118
63.5.4夜间施工措施.....................................................118
6.4文明施工、环境保护措施.......................................................119
6.4.1文明施工保证体系.......................................................119
6.4.L1文明施工保证体系................................................119
6.4.1.2施工管理人员的管理..............................................119
6.4.1.3场容场貌标准化..................................................120
6.4.1.4临时道路的管理..................................................120
6.4.1.5材料堆放管理....................................................120
6.4.1.6设备管理........................................................121
6.4.2环境保护保证体系........................................................121
6.4.2.1环境保护保证体系.................................................121
6.4.2.2工地卫生.........................................................121
6.423周围环境协调.....................................................122
642.4控制扬尘、水污染、噪声等污染措施..................................124
1编制依据
1.1编制说明
本方案适用于乌鲁木齐市轨道交通1号线工程三工站一宣仁墩站区间正线隧道暗
挖初支施工,不包含二衬结构施工。二衬施工前,将单独编制二衬施工专项方案。
1.2编制依据
1、设计、勘查文件
(1)中铁第一勘察设计院集团有限公司提供的《乌鲁木齐轨道交通一号线(三屯碑〜
国际机场)工程三工站〜宣仁墩站区间岩土工程详细勘察报告》(详细勘察阶段2014
年1月);
(2)新疆维吾尔自治区建筑设计研究院提供《乌鲁木齐轨道交通1号线环境调查
02标段调查结果》;
(3)北京城建设计发展集团股份有限公司提供《乌鲁木齐轨道交通1号线工程施工
图设计三工站〜宣仁墩站区间百园路车辆基地出入线(第十九册第二分册第一部分区间
隧道)》;
(4)相关的技术联系单、会议纪要、设计交底及图纸会审;
2、现行国家及行业相关规范规程,见表1-1所示。
表1-1主要标准、规范及规程
序号内容备注
1《地下铁道、轻轨交通岩土工程勘察规范》GB50307-1999
2《地下铁道、轻轨交通工程测量规范》GB50308-1999
3《地下铁道工程施工及验收规范》GB50299-2003
4《锚杆喷射混凝土支护技术规范》GB50086-2001
5《混凝土结构工程施工质量验收规范》GB50204-2002
6《钢筋焊接及验收规程》JGJ18-2012
7《混凝土结构工程施工质量验收规程》DBJ01-82-2005
8《混凝土强度检验评定标准》GB/T50107-2011
9《混凝土质量控制标准》GB50164-2011
10《建筑工程施工质量验收统一标准》GB50300-2001
11《建筑工程质量检验评定标准》GB50210-2001
12《建筑结构检测技术标准》GB/T50344-2004
13《轨道交通隧道工程施工质量验收标准》JQB-050-2005
14《轨道交通工程施工质量验收统一标准》JQB-068-2005
3、合同文件中指定的标准、规范、规程及现行国家及乌鲁木齐市的相关法规、技
术规范。
4、结合我联合体现有的技术水平、施工管理水平、机械设备配置能力及施工经验。
5、我联合体质量、环境、职业健康安全管理体系标准中的有关规定。
6、相关的技术联系单及会议纪要。
1.3编制原则
1、在充分理解合同文件、设计图纸及认真踏勘现场的基础上,采用经充分论证的
先进、科学、合理、经济、可行的施工方案。
2、严格贯彻“安全第一、质量为本”原则及浅埋暗挖十八字方针,确保施工安全、
确保工程质量、确保施工工期,全面兑现合同承诺。
3、优化施工技术方案,推广应用“四新”成果,加强科技创新和技术攻关,确保
工程质量全面创优。
4、加强监控量测和信息反馈,用科学数据指导施工,确保施工工艺与施工规范及
设计要求相符。
5、严格执行乌鲁木齐市建设行政主管部门下发的有关工程施工的安全、文明、环
保、卫生健康等管理条例;施工全过程对环境破坏最小、占用场地最少,并有周密的环
境保护措施,树立良好的工程形象和企业社会形象。
6、充分考虑本标段工程特点和周边施工环境,最大限度地降低工程施工对城市秩
序、环境卫生、市容市貌、地面交通、既有设施安全及市民正常生活带来的不利影响。
7、坚持试验先行,样板引路,选择更适用于本合同段工程项目的管理方法、施工
机械设备、施工工艺和方法。突出工程重点、难点,坚持规范化管理、标准化作业,不
断优化施工组织设计,以质量保安全,以质量创效率。
2工程概况
2.1工程简介
乌鲁木齐轨道交通机场支线三工站至宣仁墩站区间从三工站出发后沿南北向北京
路北行,然后向西折向东西向的城北主干道,最后到达终点宣仁墩站。
区间右线设计起点里程为YJDK0+481.843,右线设计终点里程为YJDK1+545.575,
右线全长1101.602m(含长链37.87m)。区间左线设计起点里程为ZJDK0+353.315,终点
里程ZJDK1+545.575,全长1164.068m(含短链28.192m)。
本区间约有207.25m采用明挖施工,其余均为暗挖单洞单线区间,马蹄形断面,隧
道拱顶埋深8〜17m,穿越地层主要为无水卵石层,围岩级别为V级,采用矿山法施工。
暗挖区间在YJDK0+965.578设有一处竖井及横通道。工程概况图如图2-1所示。
明挖区间
宜仁墩站
1、6号线立交明挖段
说明:
1、1、6号线立交明挖段由14标负责实施;
2、竖井一三工站左线隧道长度约578m,竖井-1、6号线立交明挖段隧道长度约70m,
立交明挖段一三工站隧道长度约360m,竖井一明挖区间左线隧道长度约405m,
竖井一明挖区间右线长度约328m,明挖区间一宣仁墩站左右线隧道长度均约为80m:
三工站
图2-1三工站一宣仁墩站区间工程概况图
本工程暗挖区间隧道按设计及运行类型共分五种断面形式,分别为DDT、DD-2、
1-1、2-2、3-3断面,其中:DD-1为标准断面,DD-2为穿越上覆杂填土区标准断面,
3-3断面为左线射流风机安装区段,1T及2-2断面为渡线加宽段。左右线各断面里程
位置见表2-1及图2-2、2-3所示。
表2-1区间隧道左、右线各里程段设计断面情况汇总表
设计
区间隧道右线里程桩号长度(m)区间隧道左线里程桩号设计断面长度(m)
断面
YK0+48L843〜ZK0+353.315〜
DD-1361.973DD-110.1
YK0+843.816ZK0+363.415
YK0+843.816〜ZK0+363.415〜
明挖47.8523-319.8
YK0+891.668ZK0+383.215
YK0+891.668〜ZK0+383,215-
DD-171.66DD-1548.595
YK0+963.328ZK0+931.810
YK0+963.328〜ZK0+93L810〜
横通道4.5横通道4.5
YK0+967.828ZK0+936,310
ZK0+936.310〜
YK0+967.828〜YK1+000DD-132.172DD-123.69
ZK0+960.000
ZK0+960.000〜
YK1+000〜YK1+070DD-270DD-295
ZK1+055.000
225.905286.235
ZK1+055.000〜
YK1+070〜YK1+258.035DD-1(含长链DD-1(含短链
ZK1+369.427
37.87)28.1918)
YK1+258.035〜ZK1+369.427〜
明挖207.669明挖96.283
YK1+465.704ZK1+465.710
YK1+465.704〜ZK1+465.710-
2-223.3642-220.986
YK1+489.068ZK1+486.696
YK1+489.068〜ZK1+486.696〜
1-117.3421-117.338
YK1+506.410ZK1+504.034
YK1+506.410〜ZK1+504.034〜
DD-139.165DD-141.541
YK1+545.575ZK1+545.573
本暗挖区间工程同时存在平曲线和竖曲线。其中:右线含有R=400m的平曲线,
R=5000m的竖曲线,且含有2个变坡点,坡度分别为5.83乐2.08%及0.43%;左线含有
R=400m的平曲线,R=3000m及R=5000m的竖曲线,且含有3个变坡点,坡度分别为:0.47%.
6.22%,2%及0.43%,详见图2-2及图2-3所示。
s
4.
s
9s
七+
变喙里程明暗挖分界里程YJ0K1+125.510变形经工程o
区间行线设计起点里程变形继里程将井及横通道中心里程(联络通道兼废水泵房)三-
款
热力沟(的石1000X1000)明暗挖分界里程二3
VJDKIH84I,816YJMWP843.816…仁心「力6叵w
YJDKCK1S3,SI:-;[,』、。,",5.37X支g.f
OY.IDK1+258.034。凶A
变形缝里程变形缱里程8?
S明暗检分界电程史
、I而if,].;:、;:SS§©变的维里程
YJDK1H66.306一
8S5.O舌YJDKb543.575
S一
明暗挖分界里程科绐里程.SY.JDKI+256.031S
Ta'
YJDKCH891.668YJDKCH893,668sT-
-8
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2022年浙江农林大学微生物学专业《微生物学》期末试卷B(有答案)
- 6.1接触网检修工具
- 碳八抽提苯乙烯装置操作工岗位晋升能力考核试卷含答案
- 钽钠还原火法冶炼工岗中冲突管理考核试卷含答案
- 液晶显示器件阵列制造工岗位新材料考核试卷含答案
- 联碱洗盐工核心实操考核试卷含答案
- 2025年职业技能鉴定考试(行政办事员/政务服务办事员中级)历年参考题库含答案详解
- 2025年智能楼宇管理员实操试卷(附答案)
- 2025年中级会计财务管理考试真题及答案
- 2025年中西医结合心脑血管疾病治疗策略考核答案及解析
- 2026年县直机关干部公开遴选笔试试卷(附答案)
- 高中高一年级信息技术“变量与程序设计综合应用-设计购买纪念品的最佳方案”教学设计
- 26新六年级上册道德与法治【知识点总结】
- 石材护理技术规范SOP
- CSCO结直肠癌诊疗指南(2026版)
- Unit5WhataDeliciousMeal!SectionA1a-1d课件人教版八年级英语下册
- 《新能源专业导论》新能源相关专业全套教学课件
- 教科版小学科学二年级上册和下册【全册】教学课件上下共两册
- 人力资源业务开展制度
- 中华传统文化课程思政教学案例
- 18.2 课时1 勾股定理的逆定理 教学课件 2025-2026学年沪科版数学八年级下册
评论
0/150
提交评论