MKD初步资料2012.ppt_第1页
MKD初步资料2012.ppt_第2页
MKD初步资料2012.ppt_第3页
MKD初步资料2012.ppt_第4页
MKD初步资料2012.ppt_第5页
已阅读5页,还剩2页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、Vizio TV project MKD 背景,出口NAFTA成品,要交5%的关税; 当地政府采购要求采购本地产品; 取得更好的价格定位优势;,MB Disassembled / Identification ( In CMI Side ) -由合作公司建議,Testing process,Assembly process,Print the labels and assign one to the each MKD,Assembly the unit (1st stage),Scan the MKD serial number and the MB serial number,Print 1

2、 labels set (1 set contain 3 labels with the same SKD serial number plus rating label) and follow with the SKD all assembly and testing process.,Create a data base with the SKD serial number and M/B serial number,Assembly complete set,function test,Test MKD,Start,MKD Production Process (1/3),Next,St

3、ick the 2nd MKD serial number label in the back cover.,Remove the Back Cover,Remove MB,Des-assembly process (FG),Unplug cables, remove MB from SKD and stick the 1st MKD serial number label in the MB.,Assembly Back Cover,Put the MB into the ESD bag and follow with his MKD together.,Assembly the Back

4、cover and keep the rating label inside the MKD.,Next,MKD Production Process (2/3),Pack MKD in original box and stick the 3rd MKD serial number in the box and stack.,Scan complete MKD pallet,Des-assembly process (FG),Scan a MKD Number, and ensure all the units that are belong to the pallet created by

5、 MB (3rd ).,Print the paper sheet. Paper sheet Content: Refer to TMX assembled process,Print the paper sheet with the pallet number assign by MB,End,Clean Unit and packing unit,Scan all MB serial numbers to create the pallet with the SKD numbers (1st ).,Package MB,Scan complete MB box and create the

6、 pallet number,Put MB into the M/B box The Qty for the MB in the box must be the same as MKD in the pallet,Print the paper sheet (2nd ) paper sheet Content: Refer to TMX assembled process,Print the paper sheet with the pallet number assign by MB,End,MKD Production Process (3/3),MB Packing process,MK

7、D Packing process,Stock,General Production Flow Chart ( MKD with Pre-Alignment),Supplier,Partner,Complete Assemble,CKD Material,W/H,Production,Burn-In 2 hour,Complete Testing,Hi-Pot function key check Color alignment 100% I/O inspection Firmware update/ check,Remove M/B,MKD,M/B,Shipping to partner,P

8、acking,Accessories,Strapping / Palletization,Disassemble SKD,MKD M/B Other Parts,W/H,Production,Assemble MB,Function Inspection,Necessaries Items,Packing,Shipping to Customer,Strapping / Palletization,Audio inspection DDC write / check HDCP write / check,Package material / accessories send to packing line,other parts,MB Disassembled Process,Container loading / Shipping document,MKD Mapping Process,Testing Process,MKD BOM Structure,MKD BOM was combined by 3 sections SKD set : Including chassis, p

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论