版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、SINTEFs Mini LNG Plant A Presentation to Petrol China September 25, 2003 Audun AspelundOutlineThe small scale LNG challengeThe IdeaAreas of useThe Mini LNG plantThe processThe equipmentThe challenges, the pilot plantThe full scale plantLNG distribution with Mini LNG from pipeline BenchmarkingMini LN
2、G for Peakshaving The idea, a new conceptUsing standard equipmentfor low investment cost and fast manufactureCopper brazed plate heat exchangers Oil-lubricated screw compressorsConstruction in a steel frame:Lower manufacturing cost Faster manufacture timeRefrigeration cycle with mixed refrigerant (N
3、2,C 1,C 2,C 3,C 4 for low energy demandAdapting operationalconditions to selected equipmentSINTEF patented mini LNG plantAreas of use: LNG distribution from pipeline Areas of use: Associated gas The processanimation.exe The challengesPlate heat exchangersdesignTwo-phase flowMixed fluidsInternal dist
4、ributionRefrigerants mixing in thetwo-phase flowregimeDistribution of two-phase flow refrigerant between parallel heat exchangersGas-liquid separatorsdesignLubricating oilOil separationOil freeze outRegulation and operation 11The pilot plantJens Hetland, OPET International Workshop on Natural Gas; T
5、echnologies,Opportunities and Development Aspects; 31 May 2002, Vaasa, Finland 12The pilotplantPilot plantCapacity, 50 kgLNG/hMain equipmentBitzer oil lubricated screw compressorSWEP copper-brazed plate heat exchangers specified by SINTEF Samson control valvesSeparators designed by SINTEFMixing devi
6、ces designed by FramoDistribution devices designed by SINTEFTesting started late 2001 in SINTEF laboratories Jens Hetland, OPET International Workshop on Natural Gas; Technologies,Opportunities and Development Aspects; 31 May 2002, Vaasa, Finland1314The full scale pilot plantGas treatmentGas engineL
7、iquefactioncycle StorageTruck terminal 15Budget price -The full scale pilot plant Capacity: 10 t/dUncertainty in cost estimate +-40 %CAPEX Liquefaction (USD750 000 Compressors 100 000Heat Exchangers 50 000Valves 40 000Separators, expansion tank25 000Thermal insulation 50 000Instrument 25 000Mechanic
8、al 60 000Steel skid30 000Electrical 40 000Control/programming 20 000Mics. 160 000Totalt 500 000Class D cost estimate (+25 %150 000Production time including testing: 18months The full scale plant Industrial MiniLNG Plant:Capacity: 10 t/dCAPEX (Total USD2 250 000 Liquefaction 750 000 Storage (250 m3 4
9、00 000 Gas treatment500 000 Gas engine400 000 LNG Truck terminal100 000 On site work100 000 Production time including testing: 18months Our GoalCreate an energy and cost effective modularised LNG plant with the following features:Capacity from 10 t/dModularised LNG plant, in framesPretreatmentLNG li
10、quefactionGas engineStorageLNG Truck terminalCAPEX (Liquefaction MM$/t a.200CAPEX (total MM$/t a. 600 3 x baseload Energy efficiency (1 bar , kWh/kg LNG0.51.5 x baseload Energy efficiency (5 bar , kWh/kg LNG0.41.2 x baseload Manufacturing time6 months0.25 x baseload Mini LNG for Peak shaving Several
11、 Mini LNG plants for localdistribution can be used for peak shaving50 x 10 = 500 t/dModules of Mini LNG plants can be put together to form larger LNG plants 3 x 10 = 30 t/d Several Mini LNG Modules along the pipeline can be used for effective peak shaveing3 x 50 x 10 = 1500 t/d Base load LNG Capacit
12、y and suppliers Capacity: up to 15000 tonnes LNG/dayTechnology:Single mixed refrigerant (SMR, (PricoPropane pre-cooled mixed refrigerant (C3/MR(APCIDual mixed process (DMR(Shell,Sakalin, (LiquefinTM Mixed Fluid Cascade Process (MFCP (Statoil/LindeSuppliers:Air ProductsChemicals Inc(USShellStatoil/Li
13、ndePhillipsPeak shave Capacity and suppliers Capacity: 100-500 tonnes LNG/dayTechnology:LNG Peak Shaving plants technology:Mixed refrigerant cycles (dominantCascade cyclesNitrogen expander cycles“Let-down” cyclesSuppliers:Air Products and Chemicals Inc.(USBlack & VeatchPritchard (USMini LNG Capacity and suppliers Capacity: 2-100 tonnes LNG/dayTechnology:Expansion processesMixed refrigerant processesSINTEFs patented Mini LNGThe LindeCycleS
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 财商义卖活动策划方案(3篇)
- 繁华地段施工方案(3篇)
- 赏冰雕活动方案策划(3篇)
- 填方地基施工方案(3篇)
- 五一饭团活动策划方案(3篇)
- 标志相关活动策划方案(3篇)
- 企业人力资源管理实务与技能提升手册
- 2025年高职焊接技术与自动化(焊接工程创意)试题及答案
- 2025年大学美容医学(皮肤美容)模拟试题
- 2025年大学植物保护(农药应用技术)试题及答案
- 2025年光电技术人员备考题库及答案解析
- 疾病编码肿瘤培训课件
- 聚合账户资产管理办法
- 骨关节养生课件
- 2025年福建省能源石化集团有限责任公司春季社会招聘210人笔试参考题库附带答案详解
- 建设项目环境影响评价分类管理名录2026版
- 劳务派遣标准操作流程及服务手册
- 2025年医疗器械质量安全风险会商管理制度
- 上呼吸道患者护理课件
- 卫星互联网基础知识培训课件
- 2025年敖汉旗就业服务中心招聘第一批公益性岗位人员的112人模拟试卷含答案详解
评论
0/150
提交评论