



下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、XXXXXX FIELD DEVELOPMENT PROJECTCOSIGNDISCIPLINESIGNATUREDATEMATERIAL INSPECTION PROCEDUREFORPIPING FABRICATIONPAGE X OF XREV.DATEDESCRIPTIONBYCH K.APPRO.CLIENTMATERIAL INSPECTION PROCEDURE FOR PIPNG FABRICATIONOFFSHORE OIL ENGINEERING CO.,LTD.CNOOCDOCUMENT NO.REV.CERTIFI. NO.DOC-XXXXXX0XXXXXCONTENT
2、S 1.0SCOPE2.0REFERENCE STANDARD3.0MATERIAL RECEIVING INSPECTION4.0MATERIAL INSPECTION/TRACEABILITY5.0MARKING TRANSFERENCE FOR SURPLUS MATERIALS6.0 REPORT FORMS1.0 SCOPEThis procedure covers the methods, techniques and acceptance standards for material inspection of piping fabrication of XXXXXX proje
3、ct.2.0REFERENCE STANDARD· Clients Specification· ASTM A6· ASME B31.33.0 MATERIAL RECEIVING INSPECTIONAll materials for this project purchased by contractor or supplied by client shall be placed in either the yard storage area designated for the project or placed in the project warehou
4、se area. There they shall be examined for compliance with the purchase order, invoice and clients specifications. The warehouse supervisor, engineer, user and QC material inspector shall verify such items as quality, quantity, markings wall thickness, dimensions, and condition.3.1 MATERIAL VERIFICAT
5、IONMaterials shall be verified according to the packing list, Mill certificate, and specification. The inspectors shall sign the verification record when the materials are acceptable.3.2 CONFORMANCE MATERIALMaterial, which meets specification, shall be marked or tagged with all relevant information.
6、 Material supply department shall have the materials stored separately from materials of other project and kept in dry and tide protection circumstance. Materials shall be given adequate protection for preventing from deforming and foreign hitting.3.3 NON-CONFORMANCE MATERIALSNon-conformance materia
7、ls shall be marked, recorded, evaluated and removed to quarantine. 3.4 JUDGMENT OF NON-CONFORMANCE MATERIALSThe judgment shall be performed by experienced person in quality control, production and workmanship.3.5 NON-CONFORMANCE MATERIAL REPAIRMaterial that may be repaired to bring them into specifi
8、cation requirements shall only be carried out by approved methods and personnel strictly in accordance with the manufacturer instructions, thereby in no way compromising the warranty or guarantees on the material in question. Client to approve any repairs to client supplied material.3.6 REJECTION AN
9、D SCRAPPINGMaterial that can not reach to conformance by repair shall be rejected or scrapped. Client to approve all rejection or scrapping of client supplied material.4.0 MATERIAL INSPECTIONQC inspector shall inspect material specification, grade, heat no. (control no.) in accordance with material
10、issuing list and Mill Certificates before material are used, QC inspector shall prepare the inspection report and sign on when the items/parts he has inspected is acceptable to the specified requirements. Inspection report shall be submitted to Client or the Certification Authority for review. 4.1Ce
11、rtification and inspection requirements for procured bulk piping items shall be defined on a form to be produced by the construction contractor. This form shall become an attachment to the majority of material requisitions and purchase orders. 4.2 Information included on the form shall be:a.The leve
12、l of Company, certifying authority which is unanimously agreed and the Contractor surveillance inspection required for each item.b. The requirements for certifying authority design appraisal for each item, if any. c.The requirements for certification documentation for each item.4.3 Material will be
13、rejected unless a certification and inspection form is attached or a written note from Certification Engineer confirms that no certification is required special conditions apply. 4.4 The following certification documentation shall be specifically checked for conformance to specification:a.Pipe Mill Material Certificates.b.Steel Mill Material Certificates.c. Manufacturers Certificate for flange, fittings and valves etc.5.0 MARKING TRANSFERENCE FOR SURPLUS MATERIALIn principle, the end of material with mar
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 住院楼电气设备调试实施方案
- 2025版电子设备购销合同范本
- 大学毕业论文致谢词6篇
- (2025年)安全生产读书心得(3篇)
- 2.1 简谐运动教学设计-2025-2026学年高中物理沪教版2019选择性必修第一册-沪教版2019
- 3.1.1农业区位因素教学设计2023-2024学年高中地理人教版(2019)必修第二册
- 3.10 中华民国的创建 说课稿 2024~2025学年统编版八年级历史上册
- 2025年采购合同版
- 2025年心脏介入科心脏起搏器植入技术考核答案及解析
- 建筑女儿墙防腐保温构造处理方案
- 2022年红河产业投资集团有限公司招聘笔试题库及答案解析
- 美术是什么 详细版课件
- 淮海战役课件
- 马克思主义政治学经典著作选读课件
- Q∕SY 19002-2017 风险事件分类分级规范
- Java-Web程序设计任务教程全书电子教案完整版课件最全ppt整本书教学教程最新讲义
- PLC技术应用ppt课件(完整版)
- 二手车买卖免责协议书范本5篇
- 现代电力电子(研究生)课件
- 注册安全工程《安全生产法律法规》知识讲解(PPT)
- 无损检测(NDT)专业英语课件
评论
0/150
提交评论