下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、XXXXXX FIELD DEVELOPMENT PROJECTCOSIGNDISCIPLINESIGNATUREDATEMATERIAL INSPECTION PROCEDUREFORPIPING FABRICATIONPAGE X OF XREV.DATEDESCRIPTIONBYCH K.APPRO.CLIENTMATERIAL INSPECTION PROCEDURE FOR PIPNG FABRICATIONOFFSHORE OIL ENGINEERING CO.,LTD.CNOOCDOCUMENT NO.REV.CERTIFI. NO.DOC-XXXXXX0XXXXXCONTENT
2、S 1.0SCOPE2.0REFERENCE STANDARD3.0MATERIAL RECEIVING INSPECTION4.0MATERIAL INSPECTION/TRACEABILITY5.0MARKING TRANSFERENCE FOR SURPLUS MATERIALS6.0 REPORT FORMS1.0 SCOPEThis procedure covers the methods, techniques and acceptance standards for material inspection of piping fabrication of XXXXXX proje
3、ct.2.0REFERENCE STANDARD· Clients Specification· ASTM A6· ASME B31.33.0 MATERIAL RECEIVING INSPECTIONAll materials for this project purchased by contractor or supplied by client shall be placed in either the yard storage area designated for the project or placed in the project warehou
4、se area. There they shall be examined for compliance with the purchase order, invoice and clients specifications. The warehouse supervisor, engineer, user and QC material inspector shall verify such items as quality, quantity, markings wall thickness, dimensions, and condition.3.1 MATERIAL VERIFICAT
5、IONMaterials shall be verified according to the packing list, Mill certificate, and specification. The inspectors shall sign the verification record when the materials are acceptable.3.2 CONFORMANCE MATERIALMaterial, which meets specification, shall be marked or tagged with all relevant information.
6、 Material supply department shall have the materials stored separately from materials of other project and kept in dry and tide protection circumstance. Materials shall be given adequate protection for preventing from deforming and foreign hitting.3.3 NON-CONFORMANCE MATERIALSNon-conformance materia
7、ls shall be marked, recorded, evaluated and removed to quarantine. 3.4 JUDGMENT OF NON-CONFORMANCE MATERIALSThe judgment shall be performed by experienced person in quality control, production and workmanship.3.5 NON-CONFORMANCE MATERIAL REPAIRMaterial that may be repaired to bring them into specifi
8、cation requirements shall only be carried out by approved methods and personnel strictly in accordance with the manufacturer instructions, thereby in no way compromising the warranty or guarantees on the material in question. Client to approve any repairs to client supplied material.3.6 REJECTION AN
9、D SCRAPPINGMaterial that can not reach to conformance by repair shall be rejected or scrapped. Client to approve all rejection or scrapping of client supplied material.4.0 MATERIAL INSPECTIONQC inspector shall inspect material specification, grade, heat no. (control no.) in accordance with material
10、issuing list and Mill Certificates before material are used, QC inspector shall prepare the inspection report and sign on when the items/parts he has inspected is acceptable to the specified requirements. Inspection report shall be submitted to Client or the Certification Authority for review. 4.1Ce
11、rtification and inspection requirements for procured bulk piping items shall be defined on a form to be produced by the construction contractor. This form shall become an attachment to the majority of material requisitions and purchase orders. 4.2 Information included on the form shall be:a.The leve
12、l of Company, certifying authority which is unanimously agreed and the Contractor surveillance inspection required for each item.b. The requirements for certifying authority design appraisal for each item, if any. c.The requirements for certification documentation for each item.4.3 Material will be
13、rejected unless a certification and inspection form is attached or a written note from Certification Engineer confirms that no certification is required special conditions apply. 4.4 The following certification documentation shall be specifically checked for conformance to specification:a.Pipe Mill Material Certificates.b.Steel Mill Material Certificates.c. Manufacturers Certificate for flange, fittings and valves etc.5.0 MARKING TRANSFERENCE FOR SURPLUS MATERIALIn principle, the end of material with mar
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 对数函数的概念课件2025-2026学年高一上学期数学人教A版必修第一册
- 2026陕西省面向中央财经大学招录选调生笔试考试参考试题及答案解析
- 2025昆明市晋宁区市场监督管理局招聘编外工作人员(1人)考试笔试备考试题及答案解析
- 2026鄂尔多斯市东胜区卫生健康系统事业单位招聘34名控制数工作人员笔试考试备考题库及答案解析
- 2025云南临沧市易成实验学校后勤人员招聘1人笔试考试参考试题及答案解析
- 2025温州市强城城市服务管理有限公司第一批面向社会公开招聘工作人员10人考试笔试备考试题及答案解析
- 2026年陕西省选调生招录(面向北京航空航天大学)考试笔试备考题库及答案解析
- 2025陕西陕煤韩城矿业有限公司社会招聘煤矿技能操作人员招聘500人笔试考试参考试题及答案解析
- 2025内蒙古鄂尔多斯万正投资集团招聘12人考试笔试模拟试题及答案解析
- 2025年抚州市属农业发展集团有限公司人才引培招聘3人笔试考试备考题库及答案解析
- 祖坟修缮协议书
- 初中数学教学随笔10篇
- 2018天成消防B-TG-TC5000火灾报警控制器消防联动控制器安装使用说明书
- 《智慧斑马线 高分子复合材料LED发光地砖》
- 房屋修缮加固工程施工组织设计方案
- 初三简单数学试卷
- 同等学力申硕(临床医学)考试题库(全真题库)
- 高清视频会议系统售后服务及培训计划
- 宁德新能源verify测试题库
- 国家安全教育高教-第六章坚持以经济安全为基础
- 韦莱韬悦-东方明珠新媒体集团一体化职位职级体系方案-2018
评论
0/150
提交评论