1、第 页2021台湾PMP资格认证考试考试真题卷本卷共分为1大题50小题,作答时间为180分钟,总分100分,60分及格。一、单项选择题(共50题,每题2分。每题的备选项中,只有一个最符合题意) 1.Your department is currently working on four urgent projects when it is assigned a major new project. To staff the new project, one of the four urgents needs to be terminated. The benefit cost ratios(B
2、CR)for the four projects are listed. Which would you select for termination? A) 0.8 B) 1.1 C) 0.9 D) 1.9 2.During initiation, a project manager is planning the upcoming project execution team meetings. What should the project manager include in these meetings that would have the biggest impact on th
3、e project? A) Review of the action item list. B) Review of identified risks. C) Assignment of tasks to team members. D) Estimating costs. 3.When developing the project charter, any kind of the organzations enterprise environmental factors must be considered. This may include the following EXCEPT_ A)
4、 company reputation B) personnel administration procedure, including training records C) existing facilities and capital equipment D) stakeholder risk tolerances 4.Which information is NOT found in the project charter? A) High-level project description or product requirements. B) Summary milestone s
5、chedule. C) Stakeholder influences. D) Assign project manager and type of project organization. 5.For internal projects, who is responsible to provide the project statement of work? A) Sponsor. B) Project manager. C) Project management team. D) The team. 6.Which of the following is reasonable in exp
6、laining the integration? A) Integration is making choices about where to concentrate resources. So sacrifice is inevitable. B) Since the project managements are implemented by overlapping and iteratively, integration is neccessary. C) “Trade-off” means “give and take”. It is necessary in dealing wit
7、h various stakeholders. D) The project deliverables are not integrated with ongoing operations of the customers organization. 7.Select the most effective sequence of the following four activities in initiating a project. (1)Define project phases;(2)Identify stakeholders;(3)Select a project manager;(
8、4)Develop project charter. A) (4)-(1)-(2)-(3) B) (3)-(1)-(2)-(4) C) (4)-(3)-(1)-(2) D) (1)-(2)-(3)-(4) 8.A KEY activity in closing out a project is to_ A) disseminate status reports and risk assessment B) disseminate information to formalize project completion C) monitor the specific project results
9、 to determine if they comply with relevant quality standards D) transfer all the project records to the project owners 9.Configuration management is a technique for_ A) overall change control B) project plan execution C) scope planning D) risk quantification 10.You work for a Lower Seobovian company
10、 that hires only left-handed people. The entire company culture is based on left-handedness. There are left-handed desks, left-handed scissors, left-handed pencil sharpeners, and left-handed coffee cups. Most people even go by the nickname “Lefty”. When the company decided to go global, it replicate
11、d its left-banded culture around the world. A new manager once mentioned at a staff meeting that it would be nice to have a few right-handed people in the company to get a different point of view on things. Such diversity would have which of the following impacts on this company? A) Have no impact.
12、B) Cause only problems. C) Either cause problems or lead to benefits. D) Can simultaneously cause problems and lead to benefits. 11.A project should be terminated for all of the following reasons EXCEPT: A) Lack of team synergy. B) The project no longer meets the companys objectives. C) The resource
13、s are not available to complete project activities. D) Project funding has been significantly reduced. 12.Initiation inputs for a project include all of the following EXCEPT_ A) product description B) strategic plan C) project charter D) selection criteria 13.Puts into overall Change control include
14、 all of the following EXCEPT_ A) project management plan B) change requests C) change control meetings D) work performance information 14.All of the following are characteristics of parametric estimating EXCEPT_ A) Historical information B) Quantifiable C) Scalable D) Activity lists 15.Configuration
15、 management is_ A) used to ensure that the description of the project product is correct and complete B) the creation of the work breakdown structure C) the set of procedures developed to assure that project design criteria are met D) a mechanism to track budget and schedule variances 16.A narrative
16、 description of products or services to be supplied under contract is called_ A) the project plan B) a statement of work C) an exception report D) a Pareto analysis 17.You have created the project charter but could not get it approved. Your manager and his boss asked that the project begin immediate
17、ly. Which of the following is the BEST thing to do? A) Set up an integrated change control process. B) Push to get the charter signed. C) Perform an impact analysis. D) Start work on only the critical path tasks. 18.Managing e-business projects for the consulting firm, Milkem Fleecem Inc. , has take
18、n a heavy toll. You are waking up at night with cold sweats, and you are traveling so often your children have forgotten your name. Only the partners seem to be making money. Although you dream of prospering and opening an art gallery in Soho, the trendy district ill Manhattan, you need to complete
19、a financial analysis of the payback period first. Such an analysis identifies the_ A) ratio of discounted revenues over discounted costs B) future value of money invested today C) amount of time before net cash flow becomes positive D) point in time where costs exceed profit 19.None of the people on
20、 your 15 person project team have worked together before, and it really shows. The team cannot seem to get past the storming stage: each meeting is characterized by disagreements, debates, and long-winded expositions some of the more verbose members of the group. Everyone seems to speak a different
21、“language” even though they are all from the same country. Conflicts are rampant. You need to get this situation under control quickly. Therefore, the first action you should take is to_ A) hold periodic group meetings B) use a group facilitator at the next meeting C) perform careful project plannin
22、g D) enforce strict rules about meeting behavior 20.Although your internet start-up company has few project management policies and procedures in place, it made a healthy profit last year. Experience, however, has taught you that some controls are required, especially for projects that change freque
23、ntly. You would like to establish a change control system for your company, but must convince a group of money-hungry “20 somethings” to use it. To be effective, the change control system must include _ A) procedures that define how project documents may be changed B) specific change requests expect
24、ed on the project and plan to respond to each one C) performance reports that forecast project changes D) a description of the functional and physical characteristics of an item or system 21.In a project, two team members were using different versions of WBS. Team members could not know the status o
25、f project management plan documents. Project manager should FIRST check_. A) configuration management system B) work performance information C) change control system D) information gathering and retrieval systems 22.Which of the following is NOT a part of the project management plan? A) Procurement
26、management plan. B) Process improvement plan. C) Schedule baseline. D) Resource requirement plan. 23.As the worlds leading seller of pogo sticks to senior citizens, your business has had its ups and downs. Recently, a high-priced consultant completed a study tracing the “downs” directly to the fact
27、that your organization is not a learning organization. It seems that no one shares information, and that people are managing projects the same way they were managed three generations ago. You are convinced that the consultants advice is correct and decide to make some changes. Accordingly, your firm
28、 now will conduct regular learning events. You hired a chief learning officer to make it all happen. Her first suggestion aimed at achieving this goal is to ensure the company supports_ A) project team meetings B) in-progress customer review sessions C) kickoff meetings D) benchmarking forums 24.All
29、 of the following are characteristics of the project management information system(PMIS)EXCEPT: A) It is a standardized set of automated tools available within the organization and integrated into a system. B) It is used by the project management team to support generation of the project management
30、plan, facilitate feedback as the document is developed, control changes to the project management plan, and release the approved document. C) It is used by the project management team to monitor and control the execution of activities that are planned and scheduled in the project, management plan. T
31、he PMIS is also used to create new forecasts as needed. D) It is used by the project management team primarily to generate presentations to key stakeholders. Typically, a separate, manual system is used for the integrated change control process, to facilitate feedback and control changes across the
32、project. 25.A project manager is following her companys internal project procedures to finish a project. These procedures call for the completion of lessons learned but do not describe who creates it. Who is involved in the creation of lessons learned? A) Project manager. B) Team. C) Management. D)
33、Stakeholders. 26.A project manager has to resolve two problems. However, both problems can occur in a single trial. In this situation, what is the BEST action the project manager can take? A) Develop a solution for each problem. B) Develop a solution that solves both problems. C) Use a statistically
34、 independent trial. D) N0 solution is needed, the two problems cancel each other out. 27.A project manager is working on a complex project with people from around the world. The project schedule is set, but the tasks require detailed integration with other tasks being done by the buyer. What is the
35、BEST thing the project manager could use to control this situation? A) Work authorization system. B) Configuration management. C) Historical information. D) Change control board. 28.You are the project manager for a large government contract. The contract was signed a year ago for this three-year, m
36、ulti-million dollar project. You were not involved in writing the contract or setting up change control procedures, but now you are being inundated with change requests from the project sponsor and from your own senior management. What should you do first? A) Ask senior management to set aside more
37、management reserve to avoid potential financial problems. B) Tell the sponsor and your senior management that any changes are out of scope at his point and cannot be considered. C) Talk to your legal department to make sure you dont do anything illegal. D) Meet with the project sponsor and senior ma
38、nagement to discuss this problem and potential solutions. 29.Your organization is having a difficult time managing its many projects. You have been asked to help senior management decide how to proceed. What should you do first? A) Review all of the organizations project documents to understand how
39、they manage projects. B) Send a formal memo to all project managers requesting their detailed project plans and status reports. C) Meet several senior managers separately to get a feel for what is really happening. D) Give a presentation on best practices to all the senior managers. 30.Preventive ac
40、tion is_ A) anything that reduces the probability of potential consequence of project risk event B) anything done to bring expected future project performance in line with the project plan C) anything report to key stakeholder for approval D) anything issued by top management to change the project s
41、cope 31.Controlling occurs_ A) on a continual basis throughout the project B) at the end of each phase of the project life cycle to assess its Success in meeting project objectives C) at the end of each planning process D) on a continual basis throughout the executing process and as needed in the ot
42、her process 32.Which of the following is not related to control process groups? A) Team development. B) Quality control. C) Benefit cost analysis. D) Verify scope. 33.In your project, if the benefit cost ratio is greater than 1, it means that_ A) the ratio of profits to cost is greater than 1 B) the
43、 ratio of revenue to cost is greater than 1 C) you should select this project from all other competing alternatives D) none of the above 34.Your project is very critical for the company and must be completed within 6 months. The project charter has been signed, but scope statement is not yet prepare
44、d. Management asks you to go ahead with the project without the scope statement being approved. What should you do(select the best answer)? A) Refuse to work on the project because management is not following standard project management practices. B) Since time is of essence, you should start the pr
45、oject with the inputs from project charter. C) Meet the management and mention the problems you will face without a scope statement. D) Escalate the issue to the project sponsor and issue a risk memo. 35.Initiating process group consists of the processes that facilitate the formal authorization to s
46、atart a new project or a project phase. Initiating processes are often done external to the projects scope of control by the organization or by a program or portfolio processes which may blur the project boundaries for project inputs. Before beginning the initiation process group, _ A) a scope manag
47、ement plan is created to document how the project scope will be defined, verified and controlled B) a project management plan is developed C) specific activities that need to be performed to produce the various project deliverables are determined D) none of the above 36.As part of monitoring and con
48、trolling, project performance must be monitored and measured regularly to identify variances from the plan. All the following are processes involved with controlling EXCEPT_ A) verify scope B) risk monitoring and control C) performance reporting D) quality assurance 37.Your management is evaluating
49、a project which requires an investment of $500,000. The expected inflow is $100,000 for 1st year, and $300,000 for every year after that. What is the payback period? A) 2 years. B) 2 years and 4 months. C) 3 years. D) Cannot be determined because discount rate is not specified. 38.Deliverables are p
50、roduced as part of a project. Deliverables are any unique or verifiable product, result or capability to perform a service, and are produced to complete a(n)_ A) process B) phase C) project D) any one of the above 39.Webster Dictionary meaning of authority is “power to influence or command thought,
51、opinion, or behavior”. As a project manager, your authority is greatly dependent on_ A) support from functional managers B) support from senior management C) influencing and leading skills of a project manager D) organization structure 40.Quality audits, reward and recognition systems and informatio
52、n gathering and retrieval systems are tools for_ A) executing B) controlling C) initiating D) planning 41.A customer informed you that it is preferable to make a change to a certain aspect of the project. What should you do first? A) Talk with team members to understand implication of the change. B)
53、 Communicate the change to management to get their inputs. C) Open up a change control. D) Do sizing for the change and communicate to customer. 42.In your organization, you are the project manager of the engineering department. But if questions related to manufacturing arise, they are passed up to
54、the engineering department head, who consults with the head of the manufacturing department. Once the manufacturing head gets the answers, he passes it the engineering department head, who in turn passes answer back down to you. The organization structure you are working on is_ A) Weak Matrix B) Mat
55、rix C) Strong Matrix D) Functional 43.Which of the following projects(i.e.Project A, Project B or Project C) should be selected? A) Project A with opportunity cost of $100,000 and investment of $1,000,000. B) Project B with opportunity cost of $200,000 and investment of $500,000. C) Project C with o
56、pportunity cost of $300,000 and investment of $3,500,000. D) Cannot be determined with available information. 44.You are in the process of developing a project charter for your project and would like to use organizational process assets as inputs for the purpose. All the following statements about o
57、rganizational process assets are accurate EXCEPT: A) Organizational process assets are organized in similar way across different application areas to provide for common ground while comparing similar parameters. B) Any and all of the assets that are used to influence the projects success can be drawn from organizational process assets. C) Organization process assets represent the learning of the company from previous projects. D) Organizations involved in the project ca
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025国考国家税务总局额敏县税务局面试试题及答案
- 2025年江西省机关事务管理局公开选调事业单位工作人员15人备考题库及1套参考答案详解
- 2024年北京经济技术开发区教育领域招聘事业单位考试真题
- 2025年广灵辅警招聘真题及答案
- 国家知识产权局专利局专利审查协作湖北中心2026年度专利审查员公开招聘40人备考题库含答案详解
- 厦门大学附属第一医院漳州招商局开发区分院2025年第四批公开招聘编外工作人员备考题库附答案详解
- 咸安区2026年面向教育部直属师范大学公费师范毕业生专项招聘备考题库完整参考答案详解
- 2025福建厦门市集美区诚毅中学英语产假顶岗教师招聘1人考试核心题库及答案解析
- 2025河南平煤神马平绿置业有限责任公司招聘3人笔试重点试题及答案解析
- 2025年西安市雁塔区第一小学教师招聘考试备考题库及答案解析
- 火灾自动报警系统故障应急预案
- 人货电梯施工方案
- 南大版一年级心理健康第7课《情绪小世界》课件
- 光大金瓯资产管理有限公司笔试
- 算力产业园项目计划书
- 塔式起重机安全管理培训课件
- 老年髋部骨折快速康复治疗
- 【初中地理】跨学科主题学习探 索外来食料作物的传播史课件-2024-2025学年七年级上学期(人教版2024)
- 四川省南充市2024-2025学年高一地理上学期期末考试试题含解析
- 化学品管理控制程序
- 探索·鄱阳湖智慧树知到期末考试答案2024年
评论
0/150
提交评论