LHC Real-time requirements.ppt_第1页
LHC Real-time requirements.ppt_第2页
LHC Real-time requirements.ppt_第3页
LHC Real-time requirements.ppt_第4页
LHC Real-time requirements.ppt_第5页
已阅读5页,还剩12页未读, 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、TC 25th October,1,LHC Real-time requirements,What is real-time?,What is latency?,The time between asking for something to be done and it being done,The violation of one or more temporal constraints causes a loss of functionality. If it takes too long it dont work. It aint necessarily speed.,TC 25th

2、October,2,Implications,Front-ends Field bus Gateway Network Workstation,Widely available industrial standards: ATM, WorldFIP, LynxOS, PowerPC which would satisfy LHC requirements (and in fact are already in use, planned to be used, or being used in prototypes.),E.g: Full ATM for LHC: 2M CHF,Power co

3、nverters Beam Instrumentation Reference magnets,Real time,To allow real time control/access of:,But note: things are moving quickly out there,TC 25th October,3,Why bother?,150 units of Q,Large but reproducible, will clearly have to be measured,Energy during injection plateau,Orbit,1. Multipole error

4、s,TC 25th October,4,Control: assumptions,Snap-back and low energy provide the challenge Nominal is the worse case. The “multipole factory” takes care of at least 80% of the effect i.e. magnetic measurements non-linear models on-line reference magnets Characteristic frequency of snap-back slow & not

5、changed by feed-forward from “multipole factory”,Corrections to: horiz. orbit correctors (b1) & tuning quads. (b2) sextupole (b3) and decapole (b5) spool pieces,Characteristic frequency is low,70 s,TC 25th October,5,Beam parameter changes,TC 25th October,6,Beam based feedback,max rate db3/dt 0.067 u

6、nits/second, 3 - 5 units Q/second 1 unit per second given the 80% from the magnet factory (NB out of tolerance in 1 second) Chromaticity is NOT an easy measurement and is not likely to be available for the physics beams (emittance growth). Available for pilots reproducibility (again),Tune & orbit we

7、 can do but b3: caveat.,TC 25th October,7,So we have large multipole swings during the injection plateau and snapback. Beam stability will depend totally on feed-forward from the reference magnets feedback on the key beam parameters tune, orbit, energy, chromaticity Have to make a phase jump in our

8、expected performance of a control system: at present it is in the stone-age have a look at synchrotron light sources to get an idea of what is possible. We will need similar to deal with multipoles, tight physics constraints & the low tolerance to beam loss.,TC 25th October,8,LEP Orbit,Maximum sampl

9、ing frequency 0.067 Hz,LHC Orbit,Proposed sampling frequency 10 Hz,The stone age.,TC 25th October,9,RT Requirements,Reference magnets feed-forward of corrections to machine Feedback-loops Global Orbit Local Orbit - e.g. orbit stability at collimators Tune Chromaticity Real-time knobs typically tune,

10、 orbit bumps extension of feedback, operator close loop, need. Display Orbit Beam loss (not for abort, but display & possible feedback) Luminosity, Beam sizes, Lifetimes Timing like actions (possibly) e.g post-mortem trigger,TC 25th October,10,RT requirements II,Response limited by PC/magnet,TC 25th

11、 October,11,Work in progress,Power converters: WordlFip 2.5 Mb/s + PowerPC/LynxOS gateway already planning RT capabilities up to 100 Hz BPM/BLM work in progress but use of RT functionality assume ATM prototyping SPS Q-loop LHC orbit correction simulation Requirements elucidated: LHC report 221 “Requ

12、irements for real time correction” CO/OP forum LHC-CP workshop here.,TC 25th October,12,SL-BI,Two classes of instrumentation: global & local The global systems e.g. orbit and beam loss will provide the main control challenges:- Orbit: 10 Hz RT connection to PCR BLMs: 10 Hz RT connection to PCR (NOT

13、to decide on beam abort) Local systems such as tune & chromaticity will be involved in RT feedback Proposed Architecture VME World FIP for RT Ethernet for off-line retrieval & Post-mortem,Under discussion,TC 25th October,13,Gateway,Gateway,Gateway,Gateway,MCCS Server,80 Gateways,1700 Digital Control

14、lers,Up to 30 Digital Controllers Per WorldFIP fieldbus,RT LHC Network,Major system - all magnets - set, ramp, trim etc. etc. Offering RT control at 100 Hz (whether you need it or not!) Digital controllers:- CERN design, manufactured by industry. Prototypes for String II. Gateways:- standard SL-CO -

15、 Power PC running LynxOS Fieldbus: WorldFIP from CEGELEC Timing: via an IRIG-B receiver card,Power Converters,TC 25th October,14,Reference magnets,C,MCCS Gateway,Multipoles Factory,DB,I,SM18 Magnet Test Benches WorldFIP fieldbus,Real-time LHC controls network,FB,Power Converter,Real-Time LHC Control

16、 System,Instrumented Magnet,3-10Hz,TC 25th October,15,SL-CO-FE - Real Time,Investigating RT architectures Front-ends, Networks Prototype WorldFIP, FIP running LynxOS, ATM SPS as test-bed Q-loop LHC orbit correction simulation,TC 25th October,16,Conclusions,Demonstrable need for real-time control at

17、the LHC Essential requirements established. Foresee dual system: real-time for purposes outlined above non-deterministic but high bandwidth for non-critical monitoring, command flow, post-mortem etc. etc. Accept RT is necessary, form WG under auspices of LHC-CP, ask them to investigate possible architectures Much work already done in prototyping possible system, howev

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论