已阅读5页,还剩28页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
MATERIAL REQUIREMENTS PLANNING Chapter Twenty-One Copyright 2014 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin Learning Objectives LO211: Explain what material requirements planning (MRP) is. LO212: Understand how the MRP system is structured. LO213: Analyze an MRP problem. LO214: Evaluate and compare MRP lot-sizing techniques. 21-2 Enterprise Resource Planning (ERP) and Material Requirements Planning (MRP) ERP a computer system that integrates application programs in accounting, sales, manufacturing, and the other functions in a firm MRP a means for determining the number of parts, components, and materials needed to produce a product 21-3 Material Requirements Planning (MRP) The logic that ties production functions together from a material planning and control view A logical, easily understood approach to the problem of managing the parts, components, and materials needed to produce end items How much of each part to obtain? When to order or produce the parts? Dependent demand drives the MPR system 21-4 MRP Applications and Benefits 21-5 Master Production Scheduling The master schedule deals with end items and is a major input to the MRP process. All production systems have limited capacity and limited resources. The aggregate plan provides the general range of operation; the master scheduler must specify exactly what is to be produced. To determine an acceptable feasible schedule to be released to the shop, trial master production schedules are tested using the MRP program. 21-6 Master Production Scheduling Week Aggregate plan shows overall quantities to produce without specifying type. MPS shows quantities of each type, with information about the production time frame. 21-7 Time Fences Changes to production plan not allowed Limited changes to production plan allowed Any changes to production plan allowed 21-8 MRP System Structure MRP system inputs MRP system outputs 21-9 Product Demand Sources Customers specific orders placed by either external or internal customers Aggregate production plan the firms strategy for meeting demand in the future, implemented through the master production schedule (MPS) 21-10 Bill of Materials (BOM) Contains the complete product description, listing the materials, parts, and components along with the sequence in which the product is created. Often called the product structure file or product tree because it shows how a product is put together. Modular bill of materials is a buildable item that can be produced and stocked as a subassembly. Super bill of materials includes items with fractional options. The BOM shows how the product is put together. 21-11 BOM Example Product A the end item Product A consists of 2 B and 3 C Product C consists of 2 F, 5 G, and 4 H Product B consists of 1 D and 4 E 21-12 Alternate BOM Structures 21-13 BOM Hierarchy (Levels) Higher levels (Iower numbers) refer to end products. Lower levels (higher numbers) refer to components and raw materials. 21-14 Inventory Status Records Information about part availability Additional information that may be useful 21-15 Basic information describing the item MRP Explosion Process The requirements for end items are retrieved from the master schedule. These are referred to as “gross requirements” by the MRP program. On-hand balance and schedule of orders are used to calculate the “net requirement.” Net requirements data are used to calculate when orders should be received to meet these requirements. Planned order releases are generated by offsetting to allow for lead time. 21-16 MRP Explosion Process (continued) Move to level 1 items. Gross requirements for each level 1 item are calculated from the planned-order release schedule for the parents of each level 1 item. Net requirements, planned-order receipts, and planned- order releases are calculated as described in steps 24. Repeat for all items in bill of materials. 21-17 MRP Example Ampere, Inc. Ampere, Inc., produces a line of electric meters installed in residential buildings. Meters are of two basic types for different voltage and amperage ranges. Some subassemblies are sold separately for repair or for changeovers. The problem is to determine a production schedule to identify each item, the period it is needed, and the appropriate quantities. The schedule is then checked for feasibility, and the schedule is modified if necessary. 21-18 Future Requirements Meters A and B and Subassembly D Assume that required quantity must be available during week 1 of each month. Trial Master Schedule 21-19 Product Structure and Inventory Data 21-20 MRP Planning Schedule 21-21 Example 21.1 21-22 Example 21.1 Without an order here, inventory will drop below the safety stock. To accommodate the lead time, orders must be released ahead of time. 21-23 Example 21.1 Without an order here, inventory will drop below the safety stock. To accommodate the lead time, orders must be released ahead of time. 21-24 Example 21.1 Total demand from planned order releases of parent items Planned order release offset by 3 periods due to lead time 21-25 Lot Sizing in MRP Systems Determination of lot sizes in an MRP system is a complicated and difficult problem. Lot sizes the part quantities issued in the planned order receipt and planned order release sections of an MRP schedule Lot-for-lot (L4L) Economic order quantity (EOQ) Least total cost (LTC)Least unit cost (LUC) Lot Sizing Strategies 21-26 Lot-for-Lot Sets planned orders to exactly match the net requirements. Produces exactly what is needed each week with none carried over into future periods. Minimizes carrying cost. Does not take into account setup costs or capacity limitations. 21-27 Economic Order Quantity Calculate reorder quantity based on EOQ. EOQ was not designed for a system with discrete time periods such as MRP. The lot sizes generated by EOQ do not always cover the entire number of periods.
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 中国全自动四色商标印刷机项目投资可行性研究报告
- 中国木器林木经销项目投资可行性研究报告
- 种汽车刹车片行业深度研究报告
- 膝关节肿胀的护理个案
- 2025年大学《冰雪舞蹈表演-冰雪运动损伤预防与康复》考试备考试题及答案解析
- 2025年大学《财务会计教育-会计电算化》考试备考试题及答案解析
- 2025年大学《新能源科学与工程-新能源科学与工程概论》考试备考题库及答案解析
- 2025年大学《口腔医学技术-口腔种植修复技术(种植体上部结构制作)》考试备考题库及答案解析
- 2025年大学《人居环境科学与技术-人居环境生态技术》考试备考题库及答案解析
- 2025年大学《食品营养与检验教育-教育实习指导》考试模拟试题及答案解析
- T/CADCC 003-2024汽车漆面保护膜施工技术规程
- 检测公司员工合同范本
- 基于学科核心素养的初中生物学作业设计与实施策略研究
- 2025年上饶经开区招才引资集团有限公司招聘笔试参考题库附带答案详解
- 2023年度中央机关遴选笔试题B卷真意试卷答案解析
- 村级组织2025年换届准备工作方案
- 传染病报告及处理规范服务培训
- 《高等数学基础》课件-第四章 导数的应用(含课程思政元素)
- 2025-2030石材加工机械行业市场现状供需分析及投资评估规划分析研究报告
- 活动现场广告安装安全措施
- 食品公司5S管理培训
评论
0/150
提交评论