石油化工建设工程项目技术文件表格、监理规范表格汇总
收藏
资源目录
压缩包内文档预览:
编号:16225894
类型:共享资源
大小:5.79MB
格式:RAR
上传时间:2019-03-12
上传人:hon****an
认证信息
个人认证
丁**(实名认证)
江苏
IP属地:江苏
2.4
积分
- 关 键 词:
-
石油化工建设工程项目技术文件表格
监理规范表格
监理规范表格汇总
石油化工建设工程项目
石油化工建设工程项目监理规范
石油 化工 建设 工程 项目
- 资源描述:
-
石油化工建设工程项目技术文件表格、监理规范表格汇总,石油化工建设工程项目技术文件表格,监理规范表格,监理规范表格汇总,石油化工建设工程项目,石油化工建设工程项目监理规范,石油 化工 建设 工程 项目
- 内容简介:
-
SH/T 3503-J117隔热工程质量验收记录Insulation Quality Acceptance Inspection Record工程名称:Project:单元名称:Unit:Insulated Locations Insulation ConstructionInspection Items and RequirementsResultsRaw material shall meet the requirements of the design and relevant codes, and bear relevant mill certificate and retest report.Strength test, tightness test and painting shall be completed for equipment and piping.Sequence release records shall be made available.Areas around insulation at access doors, manholes, peepholes and pipe fittings shall be sloped in 45 and sealed with vapor barrier. Insulation at pipe supports and brackets shall have no impact on free expansion of moving parts.InsulationPrefabricated products shall be bound tightly with joints in the same layer staggered, joints between outer layer and inner layer overlapped, expansion joints correctly installed, and caulking filled or affixed tightly with thickness maintained within tolerance specified in the applicable code.Wrapping material shall be applied tightly in the same layer and in different directions between inner layer and outer layer, with joints staggered, and with thickness deviation maintained within tolerance specified in the applicable code.Bulk material and castable shall be installed and compacted uniformly with thickness deviation maintained within tolerance specified in the applicable code.Vapor Barrier Vapor barrier shall be applied on the insulation with surface maintained level, with thickness as specified by the applicable code, and free of defects such as peeling or bubbling.Protective LayerMetal cladding shall be overlapped with joints and surface levelness in compliance with the relevant code requirements, and be free of defects such as peeling or irregularity.The protective roll shall be applied in close contact with the surface and free of defects such as wrinkle or crack.The finish protective layer shall be level, smooth, with trimmed corners, and free of visible crack. Surface levelness shall meet the requirement of the applicable codes. Conclusion of Acceptance Inspection:Owner/Supervision ContractorGeneral ContractorConstruction ContractorDiscipline engineer:Date:Discipline engineer:Date: Discipline engineer:Quality inspector:Construction foreman: Date:A.25 SH/T3503J117“隔热工程质量验收记录”适用于设备、管道等工程的保温或保冷,同一隔热
- 温馨提示:
1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
2: 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
3.本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

人人文库网所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。