版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、Removing financing obstacles through project structuring Antonio VivesManager, a.i.Sustainable Development DepartmentInter-American Development BankAccess to Finance for Local GovernmentsIV World Water ForumMarch 17, 2006Outline of the presentationProject preparationProject structuringNEEDSPreparati
2、onStructuringFinancingProject finance cycleProject preparationOne of the major obstacles to water and sanitation finance is project preparationLow institutional capacityA local affair, sometimes removed from decision making centersDifficult political and economic conditionsScarcity of financial reso
3、urces: users, taxpayers, marketsProject preparation not given the key roleProject preparationDonors and multilaterals financial institutions must emphasize support for the early stage.We at the IDB hope to approve on Monday a Project Preparation Fund with grants for capacity building and project pre
4、parationDonors should consider “debt for water swaps” as part of their official assistance.Both would leverage other funds: “teach them how to fish instead of giving them fish”Project structuringFinancial structures adapted to local realitiesExploit all possibilities to maximize synergies between sc
5、arce resources: own labor, tariffs, donors, multilaterals, public and private resourcesAt one extreme, cooperatives, water microenterprises, municipal utilitiesIn the middle, management contracts, for operation, maintenance, collections, etc.At the other extreme, full-fledged concessionsProject stru
6、cturing: local conditionsWillingness to pay/local viewsTariff sustainabilitySite and locationInstitutional capacityFiscal spaceLegal frameworkPolitical riskMacroeconomic conditionsLocal conditionsWater financing modelSesin FT3.40, Domingo 19 marzo, 11:00 am Diezmo 4In summaryProject preparation and structuring may not be a source of funds, but can help bring funds and enhance the long term sustainability of water projectsAll actors, all sources, all structures must be exploredRemoving financing obstacles through project structuring Antonio VivesManager, a.i.Sustainable Development Depa
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 结肠癌术后肠造口缺血坏死护理查房
- 2026年山东菏泽市高三二模高考生物试卷试题(含答案详解)
- 2025年内蒙古阿拉善高新技术产业开发区高中部教育领域教师招聘真题
- 2025年重庆武隆区法院招聘聘用制书记员真题
- 2025年凉山州会理市妇幼保健院招聘真题
- 《数控加工编程与操作2》课件-3.3.1篮球三维建模
- 2026泉州丰泽国有投资集团有限公司经营类岗位招聘10人笔试参考题库及答案解析
- 2026年安阳市政府采购中心(公共资源交易中心)人员招聘考试备考试题及答案详解
- 2026北京市大兴区人民医院招聘临时辅助用工人员2人考试参考题库及答案解析
- 秩序部安全管理方案落地培训
- 高空坠物安全知识培训
- 2025年自然资源局公务员面试技巧与模拟题详解
- 医学人工智能导论
- 智慧工地施工方案及技术措施
- 艾滋病患者的心理与护理
- 毕业设计(论文)-液压挖掘机驾驶室方案设计
- 《工程水文学》习题册全解1
- 北京市海淀区2024-2025学年七年级下学期期中地理试题(解析版)
- 中国艾滋病诊疗指南(2024版)解读课件
- 天元公学模拟试题及答案
- 2025年江苏扬州市扬子工程质量检测有限公司招聘笔试参考题库含答案解析
评论
0/150
提交评论