版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、Copyright 2009 Accenture All Rights Reserved.,2,Copyright 2009 Accenture All Rights Reserved.,Introduction to the NGDCv3 Services Stack,Focuses on both the Technology and Operations stacks to provide a “top down” Service Oriented Infrastructure,Physical Environment,ITIL based framework for Infrastru
2、cture Services,ITSM,Business Services,IT Processes,ApplicationMgmt,Infrastructure Services,Application Services,Sec Mgmt,Security Services,Pooled VMware; eGenera From the Storage parameter determine which storage tier to provision from Create the necessary provisioning requests either directly to th
3、e “bare-metal” or via a message-broker/interface to a specific provisioning tool Deliver application server Return neccesary meta-data to the authorised requester,Provide platform from the pool Provision the requested operating system onto the platform Basic operating system configuration completed:
4、 administrator accounts, network configurations specific to the VLAN, etc,Provide storage from the storage pool according to tier Update data archiving polices Add server to data backup service the relevant backup/recovery policy,Ensure new application server is monitored by Operations Re-evaluate c
5、apacity across the server to identify any limits being reached Update the clients Service List to ensure billing records are accurate,Service Request Mgmnt 7.5 ITSM Suite 7.5 Atrium Core 7.5 BladeLogic Operations Mngr BMC Atrium Orchestrator,BMC Products,15,Copyright 2009 Accenture All Rights Reserv
6、ed.,FS-001,Key Functional Specifications include Provision of a new application/server platform according to the selections made from Service Catalogue. This process should decide on what physical components to provision the service, secure those resources and provision to the options / parameters p
7、rovided. The end result is a single “server”, located on the correct QinetiQ VLAN, providing the requested service characteristics (e.g. operating system and storage). Key focus here is the correct sequencing of the individual provisioning requests and ensuring that the entire request is completed f
8、ully.,16,Copyright 2009 Accenture All Rights Reserved.,Functional Requirement FS-002: Basic Application Server De-provisioning,Function,Parameters,Deprovision an application server in a secure manner and return the components to the resource pools. Data should be backed up. Key focus here is the cor
9、rect sequencing of the individual provisioning requests and ensuring that the entire request is completed fully,Application Server Name: Name,Provisioning Orchestration,Server Platform,Storage,Predictive Operations,Manage the end to end provisioning of the service Validate the request and action any
10、 due-diligence (e.g. determine if in use; provide a cooling off period) Determine the infrastructure components being used and construct the necessary provisioning requests,Mark as “Out of Service” Move to Quarantine VLANS and “clean” accordingly Deprovision the platform configuration Return capacit
11、y to the pool of available resource,Backup data and mark as archival “Wipe” data and return storage to the pool,Remove server from active monitoring Re-evaluate capacity across the infrasturcture Update the clients Service List to ensure billing records are accurate,Service Request Mgmnt 7.5 ITSM Su
12、ite 7.5 Atrium Core 7.5 BladeLogic Operations Mngr BMC Atrium Orchestrator,BMC Products,17,Copyright 2009 Accenture All Rights Reserved.,FS-002,Key Functional Specifications Include De-provision an application server in a secure manner and return the components to the resource pools. Data should be
13、backed up. Key focus here is the correct sequencing of the individual provisioning requests and ensuring that the entire request is completed fully,18,Copyright 2009 Accenture All Rights Reserved.,Functional Requirement FS-003: Basic Server Modification,Function,Parameters,Allow an authorised reques
14、ter to change tiers of service. The changes allowed will be dependant on the current service class/tier,Service Item(s) Old Service Level/Tier New Service Level/Tier,Provisioning Orchestration,Server Platform,Storage,Predictive Operations,Manage the end to end change Validate the change request and
15、action any due diligence Determine the affected infrastructure components and created the necessary provisioning requests,For VMware this will provide for changes to virtual CPU and allocated memory For Blades move operating system to higher/lower class of server Move operating system between physic
16、al and virtual infrastructure,Increase/decrease storage allocated Move storage allocation: SAN to NAS and vice versa Change data archiving policies,Update monitoring accordingly Update client billing records to reflect new tariff,Service Request Mgmnt 7.5 ITSM Suite 7.5 Atrium Core 7.5 BladeLogic Op
17、erations Mngr BMC Atrium Orchestrator,BMC Products,19,Copyright 2009 Accenture All Rights Reserved.,FS-003,Key Functional Specifications include Ability to modify a servers characteristics after deployment based on business or computing needs Increase utilization of available resources through impro
18、ved allocation based on centrally managed infrastructure Ability to change service tier level in response to business requirements relating to that server Immediate update of billing instruction based on requested server changes,20,Copyright 2009 Accenture All Rights Reserved.,Functional Requirement
19、 FS-004: Service Creation and Management,Function,Parameters,Allow a “Service” to be created from one or more application servers and define availability and performance characteristics.,Service Name Service Servers: List of application servers Availability: High| Standard Guarantee Performance: Yes
20、 | No,Provisioning Orchestration,Server Platform,Storage,Predictive Operations,Create Service in the CMDB Orchestrate required provisioning request for clustering of operating system, application or database,Action requests for clustering of Operating system and/or application and/or database,None,C
21、reate necessary monitoring rules/alerts Update client billing records,BMC Event and Impact Mgmnt Atrium Core 7.5 BMC Atrium Orchestrator BMC Performance Mnger,BMC Products,21,Copyright 2009 Accenture All Rights Reserved.,FS-004,Key Functional Specifications Include Allow a Service to be created from
22、 one or more application servers and define availability and performance characteristics,22,Copyright 2009 Accenture All Rights Reserved.,Functional Requirement FS-005: Maintain Service Through a Platform Failure,Function,Parameters,Predictive Operations will detect a platform failure and, depending
23、 on the services availability class, will either: for Standard availability, raise a trouble ticket to have the outage dealt with manually For High availablity, provide alternate platform for hosting of the application and action automatically,Alert received that Platform in the Service has failed,P
24、rovisioning Orchestration,Server Platform,Storage,Predictive Operations,Determine action to take dependent on Availablity class of the Service: “Standard” should raise a trouble ticket; “High” should initiate automatic repositioning Determine the platform components needed Create archive; decommissi
25、on) Orchestrate required provisioing workflows in support of service requester decision (above) BMC Notes Use an advanced interface form within SRM and spawn two change requests, one for provisioning, one for de-provisioning In lieu of advanced interface form, we could create a drop-down questionnai
26、re that will then create two change requests as described above,As for FS-001,As For FS-001,As for FS-001 plus Identify services/servers coming to end of service life and create alert Update client billing records Monitor capacity of long term and on-demand infrastructure,Service Request Mgmnt 7.5 I
27、TSM Suite 7.5 Atrium Core 7.5 BladeLogic Operations Mngr BMC Atrium Orchestrator,BMC Products,29,Copyright 2009 Accenture All Rights Reserved.,FS-008,Key Functional Specifications Include Similar to FS-001 with the key differentiator being that the service duration is short term (typically less than
28、 12 months). This function may become just a parameter to the FS-001 function but is described separately,30,Copyright 2009 Accenture All Rights Reserved.,Functional Requirement FS-009: Manage Scientific Compute Grid Capacity,Function,Parameters,Many parts of the QinetiQ business require the ability
29、 to solve large numerical-based problems. Its anticipated that a block of the shared service infrastructure will be given over to providing a GRID service. The GRID will have a base size but will be able to expand / contract according to work load and schedules. Key will be the ability to maker temp
30、orary use of unsed servers,N/a,Provisioning Orchestration,Server Platform,Storage,Predictive Operations,GRID will effectively be a Service (see FS004) that will scale up/down using the functions for archive, provisioning and reprovisioning of servers/services FS001/002/007) Orchestrate the rapid rep
31、urposing of platform nodes,Rapid repurposing of platform to enable GRID capability,As per FS001/002/007) Provide storage to the GRID / reallocate storage to new nodes in the GRID,Monitor GRID service and react to capacity requests (assumed GRID itself will determine capacity needs based on workload
32、demands) Monitor live services to determine if they can be archived and used in the GRID Monitor archived services for when they need to come back on line Create alerts for Orchestration to provision/purpose servers,P U A,BMC Products,31,Copyright 2009 Accenture All Rights Reserved.,FS-009 Business
33、Scenario,Key Functional Specifications Include Many parts of the QinetiQ business require the ability to solve large numerical-based problems. Its anticipated that a block of the shared service infrastructure will be given over to providing a GRID service. The GRID will have a base size but will be
34、able to expand / contract according to work load and schedules. Key will be the ability to maker temporary use of unsed servers,32,Copyright 2009 Accenture All Rights Reserved.,Functional Requirement FS-010: Single Point of Management and Control,Function,Parameters,Provide a single management conso
35、le for the Utility Data Centre. Provide “overview” and “Drill down” capability across all services and components.,Time-base trigger,Provisioning Orchestration,Server Platform,Storage,Predictive Operations,Provide provisioning metrics to the billing component within Predictive Operations,Provide pro
36、visioning metrics to the billing component within Predictive Operations,Provide provisioning metrics to the billing component within Predictive Operations,Ability to accurately bill clients for use of the service,BMC Dashboards BMC Atrium Core 7.5 ITSM Suite 7.5 BMC Event and Impact Mgmnt,BMC Produc
37、ts,33,Copyright 2009 Accenture All Rights Reserved.,FS-010 Business Scenario,Key Functional Specifications Include Provide a single Management console for the Utility Data Centre. Provide Overview and Drill-Down Capability across all services and components,34,Copyright 2009 Accenture All Rights Res
38、erved.,Functional Requirement FS-011: Provisioning of File Shares,Function,Parameters,Provide a file-share for a period of time,Tier of storage Duration required VLAN required to be deployed to,Provisioning Orchestration,Server Platform,Storage,Predictive Operations,Validate the request and action a
39、ny due diligence Identify the infrastructure components Create & orchestrate the required provisioning workflows Send access details to requester,None,Provision the storage Set file/share security options,Ensure file share added to monitoring Monitor for when expiry dates are approaching Maintain client billing records,BMC Products,35,Copyright 2009 Accenture All Rights Reserved.,Functional Requirement FS-012: Usage R
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026北京理工大学事业编制相关岗位招聘备考题库附参考答案详解(考试直接用)
- 2026汉江实验室三亚研究中心(三亚深海科学与工程研究所)招聘20人备考题库及答案详解(名师系列)
- 2026云南曲靖市宣威市虹桥街道社区卫生服务中心、宣威市龙场镇卫生院、宣威市热水镇中心卫生院、宣威市羊场镇中心卫生院招聘8人备考题库附参考答案详解(综合卷)
- 2026山东省新动能基金管理有限公司校园招聘8人备考题库及答案详解【真题汇编】
- 2026上海师范大学康城实验学校第二批教师招聘4人备考题库及完整答案详解(各地真题)
- 2026广西河池大化瑶族自治县实验中学德育工作辅助人员招聘1人备考题库及参考答案详解(预热题)
- 2026四川成都市邛崃市招聘事业单位人员13人备考题库及参考答案详解(培优)
- 2026北京师范大学东营实验学校人才引进教师6人备考题库(山东)含答案详解(预热题)
- 2026浙江丽水市松阳县国盛人力资源有限公司招聘专职消防员3人备考题库附完整答案详解(易错题)
- 2026宁夏银川丽人妇产医院招聘28人备考题库必考题附答案详解
- 6 会摇尾巴的狼 课件-2025-2026学年语文三年级下册统编版
- 尿毒症合并感染死亡病例讨论记录范文
- 2026年滁州城市职业学院单招综合素质考试题库与答案详解
- (一诊)2026年兰州市高三模拟考试语文试卷(含答案)
- 2026广东惠州市疾病预防控制中心(惠州市卫生监督所)招聘卫生专业技术人员7人笔试模拟试题及答案解析
- 2026年温州永嘉县国有企业面向社会公开招聘工作人员12人笔试备考试题及答案解析
- 学校生育保险管理制度(3篇)
- 腹腔引流护理实践指南(2025年版)
- (完整版)英语四线格(A4打印)
- 部编(统编)人教版八年级语文下册1社戏及全册课文课件
- 《分数的意义》 全省一等奖-完整版PPT
评论
0/150
提交评论