版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、三相异步电机的拆装维护,(三)电机的拆解 Motors dismantling,1、准备工作 Ready,a、确认说明书 check manual,b、工具的准备 prepare tools,设备铭牌、型号、零件清单、标准件规格、 组装图、维护注意事项 nameplate, model, parts list, stand parts, assembly drawing, attention,内六角扳手、棘轮扳手、呆扳手、延长杆、套筒、铁/胶锤、撬棍等 hex wrench, ratchet wrench, solid wrench, extension rod, sleeve wrench,
2、 hammer, crowbar, etc.,注意:工具准备应以常用工具为主,取用方便的其他工具,用时取出即可! Attention:ready common tools,注意:从组装图可以分析出这台设备正确的拆解顺序. Attention: Know correct sequence by reading assembly drawing.,c、辅助器材准备,d、劳保用品的准备,工作台、吸油纸及垃圾桶、木方、塑料盒 workbench, crane, oil-absorbing sheet, trashcan, wood, plastic box,工作服/围裙、防滑手套、薄手套、安全鞋 la
3、bour suit, slip-proof glove, mitten, safety shoe,e、切断能量源,f、设备清洁,关停管道阀门 关停电力 关停压缩空气等 close pipeline valve power off compressed air off,注意:正确执行LOTO程序! Attetion:Execute LOTO exactly,去除设备表面污物,油污、灰尘等 clean sewage, oil, dust on the equipment surface,2、执行拆解 Dismantling,a、拆除前标记位置 Marking before dismantling,
4、b、电源线拆除 Remove cable,标记接线盒盖 标记电机风扇罩 标记前端盖 mark cable cap mark fan cap mark front end,拆除接线盒盖板并确认接线图 remove cable check wiring,c、拆解后端 dismantle back end,电机风扇的拆除,应使用两爪拉马拉出。 should using puller with two claws to remove plastic fan.,拆除电机护罩 标记后端盖位置 remove fan cap mark back end,拆除散热风扇 松后端螺栓 remove fan loos
5、e back screw,d、拆解前端 dismantle front end,标记轴键 松前端螺栓 撬出前端盖 mark shaft & key loose front screw pry front end,标记前轴承盖板 松轴承盖板螺栓 拉出前端盖 mark loose bearing caps screw pull front end out,应注意轴承空位内的调整垫片的数量和厚度。 pay attention to the shim in bearing position.,e、拆除后端盖 remove back end,拆除后端盖 清点零件 remove back end chec
6、k parts,3、检查 check,检查设备重要尺寸 check important dimensions,轴承孔位处的垫片厚度 check thickness of the shim in bearing position,检查轴上密封部位尺寸及光洁度,有无磨损迹象 check dimensions and smooth of sealing position, if corrode,检查密封件完好程度,有无损坏、磨花现象 check seal is intact, if broken or scratch,4、清洁整理 do 5S,a、所有拆解下来的螺栓、圆螺母、垫片、密封件等小件 零件
7、,都已安装完毕。 All dismangtled parts, have been installed.,b、使用过的工具,都已擦拭干净。 All tools,have been cleaned.,5、本章小节 Summarize,选用合适的拉马 Puller a.两爪拉马,用于保持力不大的场合,如塑料零件; Two claw puller,is used to low thrust force. b.三爪拉马,用于普通场合的拆卸,如轴承、齿轮 Three claw puller,is used to remove bearing, gear. c.液压拉马,用于需要省力或者空间受限的场合,
8、Hydraulic puller,is used to save effortorspace constrainedoccasions . d.卡盘拉马,用于边缘圆滑,普通拉爪无法卡住的场合 chuck puller, is used to parts with round edge.,(一)电机的装配 Motors reassemblying,二、泵的装配 Pumps reassemblying,1、准备工作 Ready,a、确认说明书,b、工具的准备,设备铭牌、型号、零件清单、标准件规格、 组装图、维护注意事项 nameplate, model, parts list, stand par
9、ts, assembly drawing, attention,内六角扳手、棘轮扳手、呆扳手、套筒、铁/胶锤等 hex wrench, ratchet wrench, solid wrench, sleeve wrench, hammer, etc.,注意:一般的装配顺序是,从内到外,从下到上,先零件后部件,最后总装。 Attention: Assembly sequenceis, From inside to outside, from bottom to top, the first part components, final assembly.,c、辅助器材准备,d、劳保用品的准备,工
10、作台、吸油纸及垃圾桶、木方、塑料盒workbench, crane, oil-absorbing sheet, trashcan, wood, plastic box, bowl,工作服/围裙、防滑手套、薄手套、安全鞋 labour suit, slip-proof glove, mitten, safety shoe,2、执行装配 Reassemblying,安装前端盖于轴上 安装前端盖于外壳 安装垫片于后端盖 set up front end & shaft set up front end & shell put shim,安装后端盖 安装后油封 安装风扇 set up back end
11、 set up seal set up fan,安装前油封 安装轴键 安装风扇罩 set up front seal set up key set up fan cap,接线盒安装 套上轴护套并完成 wiring set up sheath & finish,3、检查 check,检查轴输出端的径向跳动 0.05mm check beating0.05mmradial inspectionof shaftoutput end,检查轴输出端的端面跳动 0.03mm, 注意转子的轴向游动量 check endof output shaftrunout0.03mm,notethe amount of
12、 axial removablerotor,检查设备重要尺寸 check important dimensions,4、清洁整理 do 5S,a、所有拆解下来的螺栓、圆螺母、垫片、密封件等小件 零件,必须按照一定的分类,使用合适的容器,妥善存放。 keep nuts, screws, spacers, seals in box.,b、拆解完的设备,应使用合适的工具清理废油脂、密封 胶、异物等污物。 cleaning surface.,5、本章小节 Summarize,a、电机的平衡检查 Mark 电机的转子平衡对电机的使用至关重要,一般电动机出厂前都经过动静平衡试验,所以在我们日常 检修中,只需对电机轴用百分表进行跳动检查,即可大概地确定电机的装配平衡性。 The balance of the rotor is essential to theuse of motor, GeneralMotorsfacto
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026年中等职业学校职业技能大赛烹饪项目比赛理论参考复习提分资料附参考答案详解(培优B卷)
- 2026年全国企业员工全面质量管理知识竞赛考前冲刺模拟题库带答案详解(满分必刷)
- 2026年土地登记代理人(地籍调查)测试卷及答案详解(夺冠系列)
- 2026年农业知识竞赛试卷附答案详解(培优B卷)
- 免疫性血小板输注无效精准诊疗与多学科管理中国专家共识(2026年版)解读课件
- 老年患者围手术期肺保护策略应用专家指导意见解读课件
- 老年病护理中的沟通技巧
- 2025-2030年虹膜识别金融交易安全行业深度调研及发展战略咨询报告
- 2025-2030年割草机企业制定与实施新质生产力战略分析研究报告
- 婴儿口腔护理的常见问题
- 云仓一件代发合作合同
- 2024广西金融职业技术学院辅导员招聘笔试真题及答案
- 2026春夏·淘宝天猫运动户外鞋服趋势白皮书
- 技能大师工作室工作汇报
- 智慧树知道网课《创新创业讲坛》课后章节测试答案
- 焦虑自评量表SAS抑郁自评量表SDS
- 认证基础知识培训课件
- 2025年安徽省委党校在职研究生招生考试(马克思主义中国化研究)历年参考题库含答案详解(5卷)
- 机械加工工艺及装备(第二章 金属切削的基本知识)
- (高清版)T∕CSRME 009-2021 《露天矿山岩质边坡工程设计规范》
- 2024年政务服务行政办事员职业技能考试题库
评论
0/150
提交评论