SH3503-2007石油化工建设工程项目交工技术文件规定中英文对照表格
收藏
资源目录
压缩包内文档预览:
编号:16201702
类型:共享资源
大小:1.29MB
格式:RAR
上传时间:2019-03-12
上传人:hon****an
认证信息
个人认证
丁**(实名认证)
江苏
IP属地:江苏
2.4
积分
- 关 键 词:
-
3503-2007
石油化工建设工程项目交工技术文件规定
石油化工建设工程项目交工技术文
3503-2007石油化工建设工程项目交工技术
SH3503-2007
- 资源描述:
-
SH3503-2007石油化工建设工程项目交工技术文件规定中英文对照表格,3503-2007,石油化工建设工程项目交工技术文件规定,石油化工建设工程项目交工技术文,3503-2007石油化工建设工程项目交工技术,SH3503-2007
- 内容简介:
-
SH 3503J308催化再生器附件安装记录Record of Installation of Catalytic Regenerator Accessories工程名称:EngineeringProject DescriptionName: 单元名称:Name of BuildingUnit Description: 设备名称Name of Equipment位号Tag No Location Number型号及规格Type and Specification项 目Item允 许 值Allowable Value实测值Measured Value12345678旋风分离器Turbo separator System一级入口标高偏差 (mm) Elevation Deviation of First-stage Inlet铅垂度偏差Deviation of Plumbness (mm)一 级First Stage二 级Second Stage翼阀安装角度Installation Angle of Limb Valve ()一 级First Stage二 级Second Stage分布管水平度偏差 (mm)Levelness Deviation of Distribution Pipe环 形 管Ring-shaped Pipe树枝状管Twig Pipe三级旋风分离器Three-stage Turbo separator System(mm)铅垂度偏差Deviation of Plumbness 进气管与筒体同轴度偏差Deviation in Coaxiality between between Inlet Gas Air Scoop Pipe and ShellTube Body核验项目:Item of Inspection:1 三级旋风分离器相邻单管叶片导向方向应正确;1. 1.Guideway direction of the two neighboring single pipe blade of Three-gradestage Turbo separatorcyclone should be correct.2 吊杆螺母及检修平台支持角钢螺母松扣留膨胀间隙后加背帽锁紧;2. The hanger nuts and the nuts for maintenance platform support angle steel should be tightened and loosened for one turn to keep an expansion clearance and, then, they should be tightened again by using locking nuts.2. Steeve bolt is integrated with the steel nut supported by maintenance platform, locked by backing nut at the clearance of expansion section3 料腿拉杆处垫板焊缝留通气孔;3. Ventholes should be reserved at the supporting pad welding seam of charging leg rod 3. Venthole is reserved at the sub-plate welding aperture of leg rod.4 分离器、料腿、翼阀组装后的“吊灯”检查结果。4. Result of inspection on “pendant lamps” after separators, material charging legs and limb valves are assembled. “droplight” assembled with separator, material leg and limb valve.核验结果:Result of Inspection:备注:Remark:结论:Conclusion:建设 / 监理单位Owner Construction/ Supervision oryUnit施工单位Unit in Charge of Construction Unit 专业工程师: Professional Engineer 年(Y) 月(M) 日
- 温馨提示:
1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
2: 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
3.本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

人人文库网所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。