SH3503-2007石油化工建设工程项目交工技术文件规定中英文对照表格
收藏
资源目录
压缩包内文档预览:
编号:16201702
类型:共享资源
大小:1.29MB
格式:RAR
上传时间:2019-03-12
上传人:hon****an
认证信息
个人认证
丁**(实名认证)
江苏
IP属地:江苏
2.4
积分
- 关 键 词:
-
3503-2007
石油化工建设工程项目交工技术文件规定
石油化工建设工程项目交工技术文
3503-2007石油化工建设工程项目交工技术
SH3503-2007
- 资源描述:
-
SH3503-2007石油化工建设工程项目交工技术文件规定中英文对照表格,3503-2007,石油化工建设工程项目交工技术文件规定,石油化工建设工程项目交工技术文,3503-2007石油化工建设工程项目交工技术,SH3503-2007
- 内容简介:
-
SH 3503J535变压器器身检查记录Transformer body inspection record工程名称Project description:单元名称Unit description:位号Type检查日期Inspection date铭牌Name plate型号Type总重量Total weightkg制造厂Manufacturer额定容量Rated capacitykVA器身重量Body weightkg出厂日期Ex-work date额定电压Rated voltagekV油 重 量Oil weightkg出厂编号Ex-work date器身温度Body temperature环境温度Ambient temperature相对湿度Relative humidity器身抽出时间 Time when the transformer body is withdrawn年月日时分 Year Month Day Hour Min.器身装入时间 Time when the body is installed back年月日时分 Year Month Day Hour Min.检查内容Inspection contents检查结果Result1螺栓紧固,并有防松措施 Bolts should be secured with anti-loosing devices being installed.2铁芯无变形,铁轭与夹件、螺杆与夹件、铁芯间绝缘良好The core should not be deformed and the insulations between the yoke and its clamp, between the screws and their clamps, and between cores should be good.3铁芯无多点接地,铁芯与油箱绝缘的变压器绝缘良好The core should not have multi-grounding points. Transformer with insulation between the core and oil tank should have good insulation.4绕组绝缘层完整,无缺损变位The insulation layer of the winding should be complete and free from any damage.5绕组排列整齐,间隙均匀,油路无阻塞The windings should be arranged neatly with uniform clearances. The oil line should not be blocked.6绕组的压钉紧固,防松螺母锁紧The compression pins for the windings should be tightly secured and the anti-loosing nut should be tightly locked.7引出线焊接良好,绝缘包扎牢固,绝缘距离合格,接线正确The outgoing line should be properly welded and the insulation should be wrapped firmly. The insulation distance should be qualified and the wiring should be correct.8电压切换装置完好,各分接头与线圈的连接紧固、正确The voltage switchover unit should be in good condition. Various taps and coils should be connected correctly.9电压切换装置各分接头用0.0510mm塞尺检查,塞不进去Various taps for the voltage switchover taps clearance should be checked with feeler gage to make sure that the feeler gage can not be inserted into the clearance.10有载调压切换装置的选择开关、范围开关接触良好,分接引线连接正确、牢固,切换开关部分密封良好,位置指示器指示正确The select switch and range switch of the load ratio regulator should have good contacts. The tapping leads should be connected correctly and firmly. The changeover switch should be well sealed. The position indicator should have correct indications.11防磁隔板完好且固定牢固The magnetic isolation plate should be in good condition and should be fixed firmly.12油箱内清洁,无杂物 The internal side of the oil tank should be clean without any foreign matter.13用合格的变压器油冲洗箱体及器身The oil tank and transformer body should be flushed with qualified transformer oil.结论Conclusion备注Remarks建 设 / 监 理 单 位Owner / Supervision Unit施 工 单 位Construction Unit 专业工程师
- 温馨提示:
1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
2: 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
3.本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

人人文库网所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。