SH3503-2007石油化工建设工程项目交工技术文件规定中英文对照表格
收藏
资源目录
压缩包内文档预览:
编号:16201702
类型:共享资源
大小:1.29MB
格式:RAR
上传时间:2019-03-12
上传人:hon****an
认证信息
个人认证
丁**(实名认证)
江苏
IP属地:江苏
2.4
积分
- 关 键 词:
-
3503-2007
石油化工建设工程项目交工技术文件规定
石油化工建设工程项目交工技术文
3503-2007石油化工建设工程项目交工技术
SH3503-2007
- 资源描述:
-
SH3503-2007石油化工建设工程项目交工技术文件规定中英文对照表格,3503-2007,石油化工建设工程项目交工技术文件规定,石油化工建设工程项目交工技术文,3503-2007石油化工建设工程项目交工技术,SH3503-2007
- 内容简介:
-
SH 3503J624就地仪表安装检查记录Installation Inspection Record of Local Instruments工程名称:Project DescriptionEngineering Project Name:单元名称:Unit DescriptionName of Building:仪表名称Name of Instrument仪表位号Tag No.检 查 项 目Inspection items检查结果Inspection Result检查日期Inspection Date备注Remark1仪表型号、规格、材质、测量范围、压力等级、数量等符合设计要求The instrument type, specifications, material quality, measure scope, pressure rating and quantity are in accordance with the design requirements2仪表的水平度、垂直度、安装标高、位号标志牌符合设计、规范要求The instrument levelness, verticality, mounting elevation, and tag number are in accordance with the design and guideline requirements3仪表的可读性(刻度)符合设计、规范要求The instrument readability (graduation) is in accordance with the design and guideline requirements4保温箱、保护箱的水平度、垂直度、安装标高、位号标志牌符合设计、规范要求The levelness, verticality, mounting elevation and tag number of moist chambersthermostat and protective housings are in accordance with the design and guideline requirements5就地接线盒的水平度、垂直度、安装标高、位号标志牌、接线、接地安装符合设计、规范要求The local terminal box levelness, verticality, mounting elevation, tag number, wire connection and ground installation are in accordance with the design and guidelines requirements6分支汇线槽、分支桥架的安装符合设计、规范要求The installation of branch winding spotsraceway and branch crane span structurecable tray is in accordance with the design and guideline requirements7电缆保护管安装符合设计、规范要求 The installation of cable protective pipesconduit is in accordance with the design and guideline requirements8气源管、信号管安装符合设计、规范要求 The installation of air supply pipes and signal pipes is in accordance with the design and guidelines requirements9取源部件安装符合设计、规范要求 The source component installation is in accordance with the design and guidelines requirements10测量管安装符合设计、规范要求 The measuring pipe installation is in accordance with the requirements of design and guidelines11隐蔽工程安装符合设计、规范要求 The concealed installation is in accordance with the design and guidelines requirements12伴热安装符合设计、规范要求 The steam heat tracing installation is in accordance with the requirements of design and guidelines13分支电缆敷设、电缆头制做、接线及标志牌符合设计、规范要求The branch cable laying, cable terminal making, wire connection and nameplate installation are in accordance with the design and guidelines requirements14安装材料符合设计要求The installation materials are in accordance with the design requirements注:“仪表名称”和“仪表位号”栏可按单元工程填写数台同类仪表或某个单元工程的工程仪表。Remark: The columns of “instrument name” and “instrument tag number” can be filled as in several instruments of the same type of instruments for a project, or the instruments used for some engineering as per the unit engineering.a specific unit project.建设 / 监理单位Owner/Supervision Unit施工单位Constructio
- 温馨提示:
1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
2: 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
3.本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

人人文库网所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。