SH3503-2007石油化工建设工程项目交工技术文件规定中英文对照表格
收藏
资源目录
压缩包内文档预览:
编号:16201702
类型:共享资源
大小:1.29MB
格式:RAR
上传时间:2019-03-12
上传人:hon****an
认证信息
个人认证
丁**(实名认证)
江苏
IP属地:江苏
2.4
积分
- 关 键 词:
-
3503-2007
石油化工建设工程项目交工技术文件规定
石油化工建设工程项目交工技术文
3503-2007石油化工建设工程项目交工技术
SH3503-2007
- 资源描述:
-
SH3503-2007石油化工建设工程项目交工技术文件规定中英文对照表格,3503-2007,石油化工建设工程项目交工技术文件规定,石油化工建设工程项目交工技术文,3503-2007石油化工建设工程项目交工技术,SH3503-2007
- 内容简介:
-
SH 3503J623主汇线槽、主桥架安装检查记录Installation Inspection Record of Main Raceway and Cable Tray 工程名称:Project Description:单元名称:Unit Description:名称Name检 查 项 目Item of Inspection检查结果Inspection Result检查日期Inspection Date备注Remark1汇线槽、桥架安装横平、竖直,多层安装时各层弯曲部分的弧度一致,且层间间距均匀,弯曲半径应满足电缆敷设时弯曲半径的要求Installation of main raceway and Cable tray should be flat or straight. When several layers are installed, radian of curving in layers should be consistent, and in even distance, and curving radius should meet the requirements of cable laying.2镀锌、涂漆表层完好无损Galvanized and varnished coating should be in good condition.3对口连接牢靠、无毛刺,并预留适当的膨胀间隙,螺栓连接处已安装加强板,螺母在汇线槽的外侧Connection of cable ends should be firm and without burrs, and is reserved with proper expansion clearance. Reinforcing plate is installed at bolting joints. Nuts are located outside the raceway.4汇线槽、桥架与支架连接牢靠,水平安装长度超过50m有应力消除措施Connection of raceway, cable tray and bracket is firm, length of horizontal installation is beyond 50m, and a measure for stress release is taken.5汇线槽、桥架已避开强电磁场、高温、腐蚀性介质Raceway and cable tray are kept away from medium of high electromagnetic field, high temperature and erosion.6汇线槽上的保护管开孔位置在汇线槽高度的2/3处以上Opening hole for raceway protection pipe is located above 2/3 height clear the raceway.7汇线槽、桥架清净,内部平整、光洁、无杂物、无毛刺It is clean in surface of raceway and cable tray, and is flat, clear, and without debris or burrs inside.8汇线槽的隔板固定合理、牢靠Clapboard of raceway is fixed properly and firmly.9汇线槽的盖板固定合理、牢靠The raceway is covered properly and firmly.10汇线槽的支架间距合理,且焊接牢靠Distance between brackets of raceway is reasonable and is fixed by welding.11汇线槽有良好的接地The raceway is properly grounded.注:主汇线槽、主桥架指就地接线盒至控制室之间的汇线槽、桥架。Remark: Main raceway and main cable tray refer to raceway and cable tray between local terminal box and the control room.建设 / 监理单位ConstructionOwner/Supervision Unit施工单位Construction Unit 专业工程师: Discipline Engineer: 年(Y) 月(
- 温馨提示:
1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
2: 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
3.本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

人人文库网所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。