SH3503-2007石油化工建设工程项目交工技术文件规定中英文对照表格
收藏
资源目录
压缩包内文档预览:
编号:16201702
类型:共享资源
大小:1.29MB
格式:RAR
上传时间:2019-03-12
上传人:hon****an
认证信息
个人认证
丁**(实名认证)
江苏
IP属地:江苏
2.4
积分
- 关 键 词:
-
3503-2007
石油化工建设工程项目交工技术文件规定
石油化工建设工程项目交工技术文
3503-2007石油化工建设工程项目交工技术
SH3503-2007
- 资源描述:
-
SH3503-2007石油化工建设工程项目交工技术文件规定中英文对照表格,3503-2007,石油化工建设工程项目交工技术文件规定,石油化工建设工程项目交工技术文,3503-2007石油化工建设工程项目交工技术,SH3503-2007
- 内容简介:
-
SH 3503J534变压器安装检查记录Transformer installation inspection record工程名称 Project description:单元名称 Unit description:位号Tag No.名称Description铭牌Name plate型号Type额定容量Rated capacitykVA制 造 厂Manufacturer额定电压Rated voltagekV冷却方式Cooling mode出厂日期Ex-work date额定电流Rated current A总重量Total weightkg出厂编号Ex-work SN检查内容Inspection contents检查结果Results1本体安装中心线、标高符合设计要求,顶盖沿气体继电器气流方向有11.5的升高坡度The centerline and elevations for the installation of the transformer proper should be in compliance with design requirements. The top cover should be provided with a slope of 1%1.5% going up along the gas flow direction of the gas relay.2安装(不安装)滚轮就位后用制动装置(可拆卸的固定装置)固定After locating of the machine with the rolling wheel being installed (not installed), use the braking device (removable fixing device) to fix it.3散热器安装符合要求 Installation of radiator meets relevant requirements.4油路中全部阀门灵活、开闭正确,法兰处密封良好All valves on oil line should be free to move and open and close correctly. Flanges are well sealed.5储油柜安装符合要求,油位指示真实油位,无假油位现象The installation of oil storage tank should be in compliance with relevant requirements. The oil level indicator should show the real oil level instead of false oil level.6瓷套管表面无裂缝及伤痕,清擦干净The porcelain bushing surface should be free from any cracks or scars and should be cleaned.7充油套管安装正确,密封良好,油位指示正确The oil-filling tube should be properly installed and sealed. The oil level indication should be correct.8压力释放阀安装及接线正确Pressure relief valve installation and wiring are correct.9安全气道及防爆膜片安装正确Safety gas channel and rupture disc should be properly installed.10吸湿器管路畅通,吸湿剂干躁、油封正确The piping for the humidity absorber should be smooth and the absorbent should be dry and the oil seal must be correct.11气体继电器、温度计试验合格,安装及接线正确Gas relay and thermometers should be tested satisfactorily. The installation and wiring should be correct.12风扇电动机及叶片牢固,转动灵活,方向正确,无震动和过热现象Fan motor and blade should be secured and rotate freely in the correction direction. There should be no vibration and overheating.13电气线路排列整齐、防油,接线盒密封良好Electric cables are arranged neatly and are oil-proof. The junction box should be well sealed.14绝缘油合格,注油至正确油位The insulation oil should be qualified and oil should be filled up to the correct oil level.15接地线规格符合设计要求,连接可靠Grounding wire size meets design requirements and the connection should be reliable.16分接开关位置已置 位 Tap switch is set at position17整体密封检查无漏油及渗油 No oil leakage and seepage should be found during the integrated sealing check.结论Conclusion备注Remarks建 设 / 监 理 单 位Owner / Supervision Unit施 工 单 位Construction Unit 专业工程师
- 温馨提示:
1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
2: 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
3.本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

人人文库网所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。