SH3503-2007石油化工建设工程项目交工技术文件规定中英文对照表格
收藏
资源目录
压缩包内文档预览:
编号:16201702
类型:共享资源
大小:1.29MB
格式:RAR
上传时间:2019-03-12
上传人:hon****an
认证信息
个人认证
丁**(实名认证)
江苏
IP属地:江苏
2.4
积分
- 关 键 词:
-
3503-2007
石油化工建设工程项目交工技术文件规定
石油化工建设工程项目交工技术文
3503-2007石油化工建设工程项目交工技术
SH3503-2007
- 资源描述:
-
SH3503-2007石油化工建设工程项目交工技术文件规定中英文对照表格,3503-2007,石油化工建设工程项目交工技术文件规定,石油化工建设工程项目交工技术文,3503-2007石油化工建设工程项目交工技术,SH3503-2007
- 内容简介:
-
SH 3503J539高、低压开关柜安装检查记录HV/LV switch cabinet installation inspection record工程名称 Project description:单元名称 Unit description:名称Description图号Drawing No柜号Cabinet No台数Quantity检查内容Inspection content检查结果Results1基础型钢已共检合格,且有施工记录Qualified foundation profile steel has been supplied and construction records are available.2柜安装最大偏差(mm)Max. installation deviation垂直度Verticality盘顶部水平偏差Panel top horizontal deviation柜 面 偏 差Cabinet surface deviation盘间接缝Joint clearance between panels相邻两盘Two neighboring panels成列盘Arranged in serial 相邻两盘Two neighboring panels成列盘Arranged in serial 3外观、漆层完好,安装件、备件、操作专用工具、产品技术文件齐全The outer appearance should be good and the painting should be intact. The mounting parts, spare parts, operational special tools, and product technical documents should be complete.4柜内电器安装牢固,型号、规格与设计相符The electrical parts inside the cabinet are securely installed. The types and specifications should be in compliance with the design.5柜内母线规格、材质、对地和相间距离符合设计和规范要求The specifications and material of the bus inside the cabinet and distance to the ground and phases should be in compliance with the design and relevant code.6母线安装、连接符合规范要求,连接螺栓应用力矩扳手紧固The installation and connection of the bus should comply with the requirements of relevant code. The connecting bolts should be tightened by means of a torque spanner.7柜体、抽屉、小车接地齐全,牢固可靠The cabinet body, drawer, and trolley should be all grounded in a secure and reliable manner.8抽屉、小车推拉灵活,同型号能互换,主触头及二次回路连接插件接触良好The drawer and trolley should be able to move freely. Same type of drawers and trolleys should be interchangeable. The main contactor should be in good contact with the connection card of the secondary circuit.9防止电气误操作的“五防”装置齐全,动作灵活可靠The “Five-prevention” devices against wrong electrical operation should be all available and can activate reliably.10校验一、二次回路,接线准确,连接可靠,标志齐全Calibrate the primary and secondary circuits. The wiring should be correct and connection reliable and identification marks complete.11继电器试验记录Take relay test record.12电气测量仪表检验记录Take electric instruments inspection record.13电气设备交接试验记录Take electrical equipment turnover test record.14电气模拟试验Conduct electrical simulation test15受电前检查,柜内清扫、擦拭干净Clean the inside of the cabinet before energization.16测量绝缘电阻Measure the insulation resistance.17相序检查及核相Check phase-sequence and verify phases.受电日期Energization date: 年Y 月M 日D 时H 分M结论 Conclusion备注 Remarks建设/监理单位Owner / Supervision Unit施工单位Construction Unit 专业工程师 Disc
- 温馨提示:
1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
2: 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
3.本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

人人文库网所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。